1 / 12

Stormwater Permits Review for WMAC – June 2009

Stormwater Permits Review for WMAC – June 2009. Angus Eaton NYSDEC Division of Water. Better Site Design. Include BSD in the New York State Stormwater Management Design Manual Training Provided to Local Officials Should Encourage BSD Incorporate BSD into routing upgrade of MS4.

lorene
Download Presentation

Stormwater Permits Review for WMAC – June 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stormwater Permits Review for WMAC – June 2009 Angus Eaton NYSDEC Division of Water

  2. Better Site Design • Include BSD in the New York State Stormwater Management Design Manual • Training Provided to Local Officials Should Encourage BSD • Incorporate BSD into routing upgrade of MS4

  3. Inter and Intra-Municipal Cooperation • Continue to Use Criteria for Funding to Drive Inter-municipal Cooperation • Allow for Single Entity to Cover Multiple MS4s • Involve all Stakeholders in Projects to Reduce Loadings

  4. Retrofits • Define How Bubble Would Apply • Improve TMDLs to Include Allocations by MS4 • Define How TMDL Off Ramps Would Occur • Deadlines and Defined Numeric Reductions • Require proposals on IUP for discharges to 303d

  5. Public Participation • Post Construction NOI Information in Publicly Available Location • Site Owners make SWPPPs Available for Public Review and Copying • Site Owners Post Inspection Reports on Web for Larger Sites • Allow for Public Review of NOIs in MS4 Permit Renewal • SWMP Plans Available for Public Review

  6. Numeric Effluent Limitations • Coordinate Requirements in the Construction Permit with Effluent Limitation Guideline • Include Prescriptive BMPs from ELG in Erosion and Sediment Control Standards

  7. MS4 Funding • Reform NYS Laws for Municipal Funding – e.g. Stormwater Utilities

  8. Steep Slopes and Riparian Buffers • Use a USLE Map to Show Where Projects are Ineligible for General Permit • Update Erosion and Sediment Control Standards to Address Steep Slopes • Include Riparian Buffers in NYS Stormwater Management Design Manual

  9. Other Impaired Waters Issues • Adjust On-Site System Requirements • Add Oscawanna and 27 LI Embayments

  10. Issues Yet to Be Fleshed Out • MS4 Funding - Utility Districts • Extending MS4 Requirements to Municipal Boundaries • System Mapping • MS4 Monitoring • Single Entity

  11. Issues Yet to Be Fleshed Out • Buffer Requirements – Permit vs. Standards

  12. Questions and Answers

More Related