1 / 1

1 – Evaluate Opportunities and Constraints

Miller-Walker Basin Stormwater Retrofit Planning Study Retrofit Evaluation Process Framework. 1 – Evaluate Opportunities and Constraints Review available data, planning information, as-built drawings, etc. Interview County and municipal staff

loman
Download Presentation

1 – Evaluate Opportunities and Constraints

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Miller-Walker Basin Stormwater Retrofit Planning Study Retrofit Evaluation Process Framework • 1 – Evaluate Opportunities and Constraints • Review available data, planning information, as-built drawings, etc. • Interview County and municipal staff • Assess infiltration feasibility using available data • Conduct HSPF modeling to quantify sub-basin retrofit needs • Develop GIS maps illustrating retrofit opportunities and constraints GIS maps of opportunities and constraints • 2 – Identify Preliminary Retrofit Opportunities • Identify candidate retrofit opportunity areas (map & summary table) • Perform preliminary screening of candidate opportunities • Conduct driving/walking tour of screened candidate opportunities • 3 – Develop, Assess & Rank Retrofit Concepts • Evaluate feasibility, benefit, and risk criteria for screened candidate opportunities • Rank projects (Level I Ranking) • Select top top-ranked projects for further development 80 identified opportunity areas Public Input 30 preliminary planning-level retrofit concepts • 4 – Develop Concepts and Prioritize Projects • Conduct field evaluation • Prepare preliminary planning-level retrofit concepts and cost estimates • Run HSPF model to estimate flow control benefits • Prioritize projects (Level IIRanking) 3 to 5 project pre-designs • 5 – Preliminary Engineering • Refine preliminary planning-level retrofit concepts and estimates • Prepare preliminary engineering reports to assist with grant funding applications for top priority projects • Prepare retrofit plan implementation report (outline strategy for long-term implementation)

More Related