1 / 13

TPC for 2p radioactivity studies

TPC for 2p radioactivity studies. Bertram Blank, CENBG. 1 0. 0 1 2 3 4 5 6. Energy (MeV). four 2p decay events. two-proton decay of iron-45 from GANIL 2000 / GSI 2001. GANIL. GSI. Discovery of two-proton radioactivity.

lola
Download Presentation

TPC for 2p radioactivity studies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TPC for 2p radioactivity studies Bertram Blank, CENBG

  2. 1 0 0 1 2 3 4 5 6 Energy (MeV) four 2p decay events two-proton decay of iron-45 from GANIL 2000 / GSI 2001 GANIL GSI Discovery of two-proton radioactivity However: - only decay energy - no individual energies - no proton-proton angle TPC

  3. Principle of a time projection chamber - individual energies - proton-proton angle

  4. time projection chamber for 2p studies 1500 electronics channels GEM: Gas electron multiplier beam Hybrid boards Hybrid boards Daughter boards Daughter boards

  5. z y x x Double-sided micro-strip gas detector • Anodes: • 768 micros-strips of copper on a capton • substrate (2x100m) • Epoxi frame • Cathodes: • 768 micros-strips of copper (200m)

  6. z y x x Mother board + detector (15x15 cm2) + 3 GEMs

  7. time projection chamber Detector mount Detector mount TPC chamber Electronics card Strip-strip matrix GEM  = 70mm d = 100mm

  8. time projection chamber

  9. y Implantation at end Implantation at entrance saturation x Silicon detector beam x energy | x time|yenergy| y time TPC: Implantation events 48Ca + 9Be  26P, 25Si,…. Threshold for implantation events Threshold for radioactivity events End of TPC Center of TPC Entrance of TPC Different implantation depths by changing the Br

  10. y b-delayed decay Collimated a source x Silicon detector beam x energy | x time|yenergy| y time b-delayed decay TPC: Decay events b-delayed decay

  11. time projection chamber: details Detector: double-sided microstrip detector (CERN) GEM: Gas electron multiplier (CERN) Detector gas: P10 at 1atm Active detection volume: 15 x 15 x 15 cm3 ASICS: VAT/TAT by IDEAS, Norway TAC window: 10 s channels per chip: 32 time and energy Electronics and data acquisition: PXI – VME Dead time: 1.5 ms (max) Problems - up-grades 4 GEMs to increase the gain new a source collimation system non-linearity of the gain (-30% on sides) retract drift frames

  12. -17% Non-linearities of gain: 3-alpha source -33% 20 mm 30 mm beam GEM spectra 28 mm Top view Possible reason: drift frames for field homogeneities

  13. Experiments: • two-proton radioactivity: 45Fe, 54Zn, 59Ge ? • 2p radioactivity: 22Al, 23Si, 26P, 27S, 31Ar,….. •  correlations ???? • ??? Collaboration: • CENBG: Exotic nuclei group • Electronics group • Intrumentation group • Mechanics group • GANIL: DAQ group • LISE group

More Related