Master production schedule
This presentation is the property of its rightful owner.
Sponsored Links
1 / 15

MASTER PRODUCTION SCHEDULE PowerPoint PPT Presentation


  • 101 Views
  • Uploaded on
  • Presentation posted in: General

MASTER PRODUCTION SCHEDULE. IKA ATSARI DEWI, STP.MP. PRODUCTION PLANNING AND INVENTORY CONTROL. JURUSAN TEKNOLOGI INDUSTRI PERTANIAN FAKULTAS TEKNOLOGI PERTANIAN UNIVERSITAS BRAWIJAYA 201 3. BY KELOMPOK 8. Akbar Fajar K 115100302111001 Dwi Ari Febrianto 115100307111004

Download Presentation

MASTER PRODUCTION SCHEDULE

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Master production schedule

MASTER PRODUCTION SCHEDULE

IKA ATSARI DEWI, STP.MP

PRODUCTION PLANNING AND INVENTORY CONTROL

JURUSAN TEKNOLOGI INDUSTRI PERTANIAN

FAKULTAS TEKNOLOGI PERTANIAN

UNIVERSITAS BRAWIJAYA

2013


By kelompok 8

BY KELOMPOK 8

  • Akbar Fajar K 115100302111001

  • Dwi Ari Febrianto 115100307111004

  • DeniPurwanto 115100301111024

  • NimasDwiRahma S 115100301111004

  • RizkiAmeilia 115100301111042

  • WidiAyu Sigma 115100300111070


Master production schedule

LATAR BELAKANG

  • Pentingnyasistemproduksi

  • Permintaankonsumen

  • Efisiensipenggunaansumberdaya


Master production schedule

MPS

  • Dalam jadwal induk produksi (MPS) dibutuhkanketepatanwaktudankuantitasuntukmenghasilkansatuprodukakhir. JadwalindukProduksilebihmengutamakanpadasisikebijakanmanajemendantujuan.


Master production schedule

MPS

  • Tujuandarijadwalindukproduksiiniadalahmenjadwalkan jumlah produksi pada setiap periode perencanaan, danjugameminimalkanbiayadanpenguranganpenumpukankapasitasproduk (bottle neck).


Master production schedule

MPS

  • MPS harusmenjumlahkanuntukmenentukantingkatproduksi, inventori, dansumber-sumberdaya lain dalamrencanaproduksiitu. Data Perencanaanberkaitandenganaturan-aturantentanglot-sizing yang harusdigunakan, stokpengaman (safety stock), danwaktutunggu (lead time). Denganjadwalindukproduksimakakitadapatmengetahuibahwa safety stock sangatcocokuntukmenyerapketidakpastianpersediaan.


Master production schedule

MEI & MAI


Master production schedule

Variabel


Formulasi

FORMULASI


Master production schedule

GLPK

  • The GLPK (GNU Linear Programming Kit) paket ditujukan untuk memecahkan skala besar linear programming (LP), integer programming campuran (MIP), dan masalah terkait lainnya.


Komponen glpk

KOMPONEN GLPK

  • metode simpleks primal dan dual

  • Metode primal dual interior-point

  • Metode cabang-dan-cut

  • penerjemah untuk GNU mathprog

  • program aplikasi antarmuka (API)

  • berdiri sendiri LP / MIP solver


Studi kasus

StudiKasus

Diketahui:

H =52 minggu

At = 1

n = 8

k = 1, 2, ..., 52

λ = 0, 1, 2

δ =5%.

I= 2


Master production schedule

Dari kasus yang diketahuidiatas, makadiselsaikandenganmenggunakanformulasidan program GLPK.

Setelahndilakukanperhitunganmenggunakansoftware darikasusdiatasdapatdiketahuibahwaHasilmenunjukkanbahwaformulasiinidiarahkanuntukmeminimalisasiketidakstabilanproduksitanpaadaperbedaan yang menonjolpadabiaya yang dikeluarkan.


Thank you d

Thank you…….:D