An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPEN SESSION on Tuesday, 5 September 2000 • at 08:30 h, Main Auditorium • 1. Status report on ICARUS: C. Rubbia • 2. Proposal: OPERA - An appearance experiment to search for  oscillations in the CNGS beam : J-P. Repellin, P. Strolin, K. Niwa (SPCS 2000-028/P318, LGNS-P25/2000): • 3. Addendum to PS212/DIRAC: First observation of pK atoms and their lifetime measurement :L. Nemenov • (SPSC 2000-032/P284 Add. 1): • CLOSED SESSION on Tuesday, 5 September at 14:00 h, 6th Floor Conference Room, • continuing on Wednesday, 6 September at 09:00 h • 1. Approval of the minutes of the 48th meeting of the SPSC • 2. Report on the 147th meeting of the Research Board • 3. Status Report on the SPS • 4. Status Report on the PS • 5. Status Report on the PS and SPS experiments • 6. Status of ICARUS: W. Kühn (and A. Zalewska) • 7. Discussion on P318/OPERA: S. Dalla Torre, R. Forty • SPCS 2000-028/P318, LGNS P25/2000) • 8. Discussion on addendum to PS212/DIRAC : M. Cavalli-Sforza • SPSC 2000-032/P284 Add. 1 • 9. Discussion on addenda 2 and 3 to NA48 : Y. Déclais, M. Pennington, A. Pich • SPSC 2000-002/P253 Add.2, • SPSC 2000-003/P253 Add.3 • 10. Discussion on addenda 5, 6 and 7 to NA49 : N. Pavlopoulos • SPSC 2000-011/P264 Add. 5; • SPSC 2000-033/P264 Add. 6; • SPSC 2000-035/P264 Add. 7 • 11. Discussion on NA60 ion phase : W. Kühn • SPSC 2000-010/P136 • 12. Discussion on P317 / CLOUD : F. Bobisut, P.J. Crutzen • SPSC 2000-021/P317, • SPSC 2000-030/P317 Add.1 • 13. SPS and PS schedules • 14. A.O.B. Memorandum from MONOLITH • SPSC 2000-031 Report from SPSC meeting 05-06/09/2000

  2. 1. Approval of the minutes of the 48th meeting of the SPSC • 2. Report on the 147th meeting of the Research Board • 3. Status Report on the SPS • 4. Status Report on the PS • 5. Status Report on the PS and SPS experiments • 6. Status of ICARUS: W. Kühn (and A. Zalewska) Report from SPSC meeting 05/09/2000Closed session ... the Research Board requested the SPSC to review, at its 5 September 2000 meeting, all the fixed-target experimental proposals which are still pending and therefore still not included in the current Medium Term Plan. This review should include competition from other experiments world-wide, and conclude by establishing scientific priorities for the period 2001 to 2005. It should be presented to the Research Board at its 14 September 2000 meeting, at which time a parallel review by the management of the resources that these proposals request from CERN (finances, man power,...) will also be presented. … - Comments from the Chairman & C. Détraz Running at 400 GeV/c;Very good SPS efficiency this year : 90 % PS Intensity record; AD status & physics start; News from RFQ-D being tested in Aarhus DIRAC benefits from AD spare cycles; AD Experiments are running; Good results from ASACUSA & ATRAP; ATHENA progressing well - A first 20 m long track from T600 should be seen early next year; - Congratulations of the SPSC for the impressive progress over last year.;

  3. 7. Discussion on P318/OPERA: S. Dalla Torre, R. Forty • SPCS 2000-028/P318, LGNS P25/2000) • 8. Discussion on addendum to PS212/DIRAC : M. Cavalli-Sforza • SPSC 2000-032/P284 Add. 1 • 9. Discussion on addenda 2 and 3 to NA48 : Y. Déclais, M. Pennington, A. Pich • SPSC 2000-002/P253 Add.2, • SPSC 2000-003/P253 Add.3 • 10. Discussion on addenda 5, 6 and 7 to NA49 : N. Pavlopoulos • SPSC 2000-011/P264 Add. 5; • SPSC 2000-033/P264 Add. 6; • SPSC 2000-035/P264 Add. 7 • 11. Discussion on NA60 ion phase : W. Kühn • SPSC 2000-010/P136 • 12. Discussion on P317 / CLOUD : F. Bobisut, P.J. Crutzen • SPSC 2000-021/P317, • SPSC 2000-030/P317 Add.1 • 13. SPS and PS schedules • 14. A.O.B. Memorandum from MONOLITH • SPSC 2000-031 - Data taking expected in 2005; 18 events expected in 5 years ; Cost 83 MSF; Collaboration not strong enough ; - SPSC asks for clear definition of responsibility, definition of SW organisation and a long list of technical items. Report from SPSC meeting 23/05/2000 Closed session (Ct’d) - Proposal to measure pK life time in 2003-2005 - SPSC recommends approval for 2003, provided existence of pK atoms is shown - Extension of NA48, after installation in 2002-3 shut-down - With NA48 CERN can bring important and unique data to CP violation. SPSC: low cost & natural extension of NA48. Extension recommended for approval - Proposal to run at 80 A.GeV/c (6days) in 2000. - This year’s request recommended for approval - Request for 15 days at 20 & 30 A.GeV/c in 2002. To be decided at next SPSC - Request for Indium run in 2002 and Pb run in 2003 - Position of runs still to be decided - SPSC comments : Physics is clear; should be done; Recommended for approval - Why PS beam ? - It’s a research programme, not an experiment - Not recommended for approval - 2001 schedule recommended for approval

  4. Physics starts: 2 April East Hall, AD, ISOLDE, nTOF Physics stops: 29 October 28 weeks for East Hall (29 weeks in 2000) 3000 h for AD Supercycle length: 16.8 sec Informal meeting on July 7th with users about distribution of proton cycles between East Hall, PS and SPS/MD, ISOLDE and nTOF. Possible scenarios send to users on August 2nd. Efficient use of beam time requires close collaboration between the PS and ISOLDE coordinators. Expecting detailed user requests until end of October. From Thomas Ruf