An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ecological Restoration of the Built Environment The proposal: launch a research and education initiative at the Indiana Dunes National Lakeshore linking the economic, social, and environmental aspects of sustainable building removal to ecological restoration and green space management

  2. Indiana Dunes National Lakeshore The IDNL: an atypical land use legacy for a national park A substantial portion of the land is comprised of a patchwork of previous homesites that were demolished and restored to a specific habitat. When the IDNL was authorized in 1966 there were more than 750 residences within its boundaries. Many homeowners maintained reservation-of-use until 2010.

  3. Indiana Dunes National Lakeshore The IDNL: an atypical land use legacy for a national park Prior to restoration activities buildings are typically demolished, the waste sent to a land fill, and then the land is restored to a prescribed habitat (e.g., wetland, forest, upland dunes, savanna/grassland). Approximately 60 remaining structures are targeted for removal and habitat restoration.

  4. The IDNL: an atypical land use legacy for a national park We estimate that the 600+ structures that have been demolished to date represent 32,400 m3 of landfill waste. This has an enormous metal and carbon footprint on our regional environment. Anthony_Sutphen@nps.gov

  5. Significance and critical need The U.S. sends ~136 million tons of building-related construction and demolition waste to landfills each year: 25-30% of all waste produced in the nation China reports even higher numbers Minimizing resource use is a key approach to a sustainable economy: Deconstruction of buildings can reduce construction waste and increase efficiency Demolition or deconstruction by-product synergies can be made with local construction projects.

  6. Ecological Restoration of the Built Environment This legacy of the built environment and the IDNL’s mission to restore the land and create park space makes this site an ideal test-bed to explore the concepts and methods of ERBE.

  7. Specific goals and intermediate milestones: ERBE • 1) Create new and link existing courses, seminars, special events, and internship opportunities to develop the theoretical, quantitative, and practical training for cohorts of students in ERBE • e.g. Senior Design Teams in DEEE and College of Technology • 2) Establish a continuing education program for national park staff and city planners • 3) Develop best practice manuals for city planners and national park resource managers engaged in or planning ERBE projects • 4) Create an online location- based digital database of invasive species, soil properties, and building details at the study site • e.g. Collaboration with Purdue’s visual analytics center (VACCINE) • 5) Establish integrated ecological, geochemical and soil science, and microbiological research programs to better understand the success of landscape restoration from the built environment.

  8. Proposed Integration and Coordination ofActivities Phase One (Initial Site Evaluation) begins with a complete assessment of landscape dimensions and access, building composition and projected reuse/recycle value, an ecological survey of native and invasive vegetation and invertebrate, homesite soil analyses, and interviews with park staff, students, and guests. Local citizen scientist teams will be established during this phase.

  9. Proposed Integration and Coordination ofActivities Phase Two (Deconstruction or demolition, Sample Collection, Mapping) will initiate the building deconstruction process, the removal of reusable/valuable ornamental plants and lawn, the establishment of long-term monitoring plots and ecological and soil surveys, the mapping of invasive plants and coordinating their removal.

  10. Proposed Integration and Coordination ofActivities Phase three (Restoration, Economic Evaluation, Continued Monitoring) completes the deconstruction and resale/recycle/donation activities, generates detailed economic and life-cycle analysis of building materials, finalizes the infill and grading of the homesite, and initiates the replanting of native species.

  11. Ecological Restoration of the Built Environment A integrated research and education initiative Map activity to IDNL & local community needs Boots on the ground: Senior design teams, honors theses, graduate students, citizen scientists, IDNL staff The Built Environment Ecological Restoration Activities Social Science Implications and Park Sustainability By-product synergies with local construction needs Demolition/ deconstruction assessment and implementation Pre-restoration Ecosystem Assessment Ecosystem Restoration Activities Monitor & model current and past restoration efforts COE: Zhao, Sutherland COT: Alter, Schaurette IDNL: Agustin, Kwilosz COE: Hastak, Zhao Sutherland, Office of Sust: Gullich IDNL: Agustin COE-S: Chaubey, Jafvert CoA: Emory, Turco, Schulze, Richmond, Johnston CoS: Filley, Michalski, Harbor USGS: Byappanahalli, Pavlovic IDNL: Marburger, Kwilosz USGS Retired: Hiebert COS: Filley, Michalski COA Emory, Turco, Dunning, Gibson, Richmond, Hildner, Dahl, Siciliano, Johnston IDNL: Marburger PU-Cal, Choi IU-NW: Avis USGS: Grundel, Pavlovic COE-S:,Chaubey, Nies COA Emory, Dunning, Gibson, Hildner, Dahl, Siciliano, USGS: Byappanahalli IDNL: Marburger HTM: Day, Cai. CLA: Raymond IDNL: Smith

  12. Leveraging our capabilities Typical Approach New Approach Indiana Dunes National Lakeshore Purdue University Local Communities and National Stakeholders New frameworks for collaboration

  13. AUnique Education and Training Platform: the Current Research Permit • ~35 acres • Sustainably remove buildings and associated infrastructure • Restore the land to the upland forest ecosystem • Monitor past 20 years of restoration efforts

  14. Impacts to local hydrology, soil moisture, Lake Michigan recharge

  15. Ecological Restoration of the Built Environment Linking sustainable building removal to ecological restoration and green space management Problem: Dormitory and lab space is essential for success of this effort. Solution: Convert selected sites into high energy-efficiency dormitories and research laboratories (an opportunity forPurdue Alumni Donors?)

  16. Create jobs in new sectors, e.g., deconstruction, ecosystem restoration • Minimize new resource extraction through reuse (asphalt, concrete, wood, metals, etc.) • Create integrated sustainable development graduate training programs (international focus) • Minimize land fill waste/toxic disposal • Create green space for improved environment • Create green space that promotes resilience • Urban agriculture, urban forests

  17. Students trained in economic and environmental assessments of deconstructing buildings Anthony_Sutphen@nps.gov

  18. Students trained in public awareness and policy related to issues of government acquisition of private property domain Anthony_Sutphen@nps.gov

  19. Students trained in ecological restoration and long term monitoring of environmental parameters—sustainable green space creation Anthony_Sutphen@nps.gov