Moderate risk waste facility design evolution at king county
This presentation is the property of its rightful owner.
Sponsored Links
1 / 21

Moderate Risk Waste Facility Design Evolution at King County PowerPoint PPT Presentation


  • 86 Views
  • Uploaded on
  • Presentation posted in: General

Moderate Risk Waste Facility Design Evolution at King County. James Neely NAHMMA 2012 Northwest C onference. Part one: Pilot hhw facility made Semi-permanent. Factoria Transfer Station Pre-Development 2001. Pilot MRW Facility Opened Sept. 2002. Failure of Retractable Awning.

Download Presentation

Moderate Risk Waste Facility Design Evolution at King County

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Moderate risk waste facility design evolution at king county

Moderate Risk Waste Facility Design Evolution at King County

James Neely

NAHMMA 2012 Northwest Conference


Part one pilot hhw facility made semi permanent

Part one: Pilot hhw facility made Semi-permanent


Moderate risk waste facility design evolution at king county

Factoria Transfer Station Pre-Development

2001


Moderate risk waste facility design evolution at king county

Pilot MRW Facility

Opened Sept. 2002


Moderate risk waste facility design evolution at king county

Failure of Retractable Awning


Moderate risk waste facility design evolution at king county

2004: Pilot to Semi-Permanent Facility


Initial results

Initial Results


Be prepared for the exotics

Be prepared for the exotics


Consider outdoor storage needs

Consider outdoor storage needs

Type 4 Outdoor Explosives Magazine for Marine Flares


Part two finally a real facility

Part two: finally a real facility


Rebuilt factoria transfer station and moderate risk waste facility

Rebuilt Factoria transfer station and Moderate Risk waste facility

Opening Planned for 2015


Design considerations summary

Design Considerations Summary

  • Size

  • Ventilation and Fire Safety

  • Ergonomics/Self Service Opportunities

  • To Bulk or Not to Bulk

  • Green Building

  • Employee Comfort


Conceptual design

Conceptual design


Local exhaust ventilation

Local exhaust ventilation


Direct ventilation best

Direct ventilation- best


  • Login