An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 7 Sep 2011: Progress Meeting 0-6549 Hydraulic Performance of Staggered-Barrel Culverts for Stream Crossings

  2. Agenda • Introductions • By-Task Progress • Problems • Miscellaneous • Lab Visit

  3. Introductions • Researchers: • Project Management Committee: • Visitors:

  4. Project Background • Develop knowledge to address the issue of solids accommodation in Texas Department of Transportation low-water crossing structures (not bridges). • To develop design guidelines to assist in building multiple barrel systems that mimic the necessary stream behavior to facilitate solids migration.

  5. Progress by Tasks • Brief by-task report. • Task 1: Literature Review • Task 2: Screening Tools • Task 3: Quantitative Modeling • Task 4: Data Analysis • Task 5: Reporting

  6. Task 1: Literature Review • TM1 submitted. • Copies on server • Database(s) assembled. • QA/QC complete.

  7. Task 2: Screening tool(s). • Database dependent • QA/QC on-going as just reported • Prototype screening tool exists • USGS is programming for team deployment. • Prototype runs OK on PC, will not run on Mac (but should) • TM2 was due July 2011 • PD reminded RS about TM2. TM2 to be completed before end of CY 2011, probably sooner.

  8. Task 2: Screening tool(s). • Database dependent • QA/QC on-going as just reported • Prototype screening tool exists • USGS is programming for team deployment. • http://tx.cr.usgs.gov/jvrabel/WATER_index.html#guiTaskItem2_demo • TM2 was due July 2011 • PD reminded RS about TM2. TM2 to be completed before end of CY 2011, probably sooner.

  9. Task 3: Quantitative modeling. • Laboratory system functional. • Have solids in-place and will demonstrate today. • Experimental program ended August 31 • Large fraction of planned experiments were conducted. • Data interpretation FY12 (CY11-12)

  10. Task 3: Quantitative modeling. • Certain experiments were omitted • Sand – entirely omitted, could not keep sand in model. • Gravel sizes changed to reflect mobility from first few months of experimental program. • Slopes different to fit actual model capabilities.

  11. Task 4: Data Analysis. • 2-D/2-phase computer program (UH researchers) to guide experiments. • FaSTMECH CFD computer program (TTU) to extrapolate to larger scales. • CAP-R (Culvert Analysis Program – R) to provide design and performance guidance.

  12. Task 4: Data Analysis. • 2-D/2-phase computer program (UH researchers) to interpret experiments.

  13. UH Activities 1D coupled morphodynamics profile model • People: Ruosen Qian (MS), Kyle Strom Database refinement for screening tool • People: Kyle Strom (Task 2) HEC-RAS modeling of Real County crossing • People: Miguel Albuja (UG), Guillo Machado (UG), Kyle Strom

  14. 1D Morphodynamic Model • Purpose of model Dynamic modeling of culvert reach that accounts for deposition/erosion (data analysis) Upscaling of lab model results (data analysis)

  15. 1D Morphodynamic Model

  16. 1D Morphodynamic Model • Progress Validated model • Pure open channel with movable bed and variable width (transcritical flow) • Open/pressured flow in a circular pipe Ruosen graduated in August

  17. 1D Morphodynamic Model • Equations Continuity: Saint Venant: Exner: • Methods MacCormack Finite Difference TVD Modification to sources terms

  18. 1D Morphodynamic Model Transcritical flow

  19. 1D Morphodynamic Model Bed aggradation due to sediment overloading

  20. 1D Morphodynamic Model Bed degrading due to base level drop

  21. 1D Morphodynamic Model

  22. Remaining work • 1D morphodynamic model • Use culvert equations as internal boundary conditions with dynamic bed equation to capture changes in culvert geometry. • Screening tool • Aid TTU and USGS in tool development • HEC-RAS • Finish analysis of Real County and a hypothetical case to determine extent to which HEC-RAS can be helpful in analysis.

  23. Real County LWC still looks good looking downstream

  24. downstream upstream

  25. Task 4: Data Analysis. • FasTMECH CFD computer program (TTU) to extrapolate to larger scales.

  26. Task 4: Data Analysis. • CAP-R (Culvert Analysis Program – R) to provide design and performance guidance.

  27. Task 5: Reporting. • SAR submitted end of August • Monthly reports on server; Project start to June 2011 should be there. • TM1 submitted • TM2 in-progress • TM3, TM4 pending. • Final Report FY12 (Draft August 2012)

  28. Problems Encountered • Took longer to start experiments than anticipated. • Weir calibration • Leaks, computers failing, etc. • Boundary conditions in 1D not continuous from free-surface to pressure flow • Screening Tool • MatLab compiler not producing architecture independent application)

  29. Miscellaneous • Present provisional results at ASCE/EWRI in ABQ next May.

  30. Laboratory Tour • Visit laboratory and see demonstration of how experiments were conducted. • Underwater video, ADV • Solids motion