Wyoming loads
This presentation is the property of its rightful owner.
Sponsored Links
1 / 7

Wyoming Loads PowerPoint PPT Presentation


  • 70 Views
  • Uploaded on
  • Presentation posted in: General

Wyoming Loads. WECC 2020 HSa1 vs. TEPPC 2020 PC0 Load Comparison 010711, JA. Platte. WECC 2020HSa1. TEPPC 2020 - Promod. Sheridan. WECC 2020HSa1. TEPPC 2020 - Promod. Firehole. TEPPC 2020 - Promod. WECC 2020HSa1. Bridger. WECC 2020HSa1. TEPPC 2020 - Promod. ORebasin.

Download Presentation

Wyoming Loads

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Wyoming loads

Wyoming Loads

WECC 2020 HSa1 vs. TEPPC 2020 PC0 Load Comparison

010711, JA


Platte

Platte

WECC 2020HSa1

TEPPC 2020 - Promod


Sheridan

Sheridan

WECC 2020HSa1

TEPPC 2020 - Promod


Firehole

Firehole

TEPPC 2020 - Promod

WECC 2020HSa1


Bridger

Bridger

WECC 2020HSa1

TEPPC 2020 - Promod


Orebasin

ORebasin

WECC 2020HSa1

TEPPC 2020 - Promod


Wyoming loads

East load numbers are the WECC LRS submittal sent March 8, 2010.

PAC’s Load Submittal to LRS

PAC’s IRP shows:

PACE-WY annual Load Growth = 3.6%

1729x1.036 = 1791 MW

1871 MW

TEPPC 2020-PC0


  • Login