Mike cundiff commercial regional manager
This presentation is the property of its rightful owner.
Sponsored Links
1 / 11

Mike Cundiff Commercial Regional Manager PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on
  • Presentation posted in: General

Controls Integration and Training. Mike Cundiff Commercial Regional Manager. Required Hardware. LonWorks. BACnet. Operation: On/Off, Mode, Set Temperature, Fan Speed, and Air Flow Direction Monitor: Status, Error Code, Error Unit Address, Filter Sign, and Malfunction Log

Download Presentation

Mike Cundiff Commercial Regional Manager

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Mike cundiff commercial regional manager

  • Controls Integration and Training

Mike Cundiff

Commercial Regional Manager


Required hardware

Required Hardware

LonWorks

BACnet

  • Operation: On/Off, Mode, Set Temperature, Fan Speed, and Air Flow Direction

  • Monitor: Status, Error Code, Error Unit Address, Filter Sign, and Malfunction Log

  • Prohibit: On/Off, Mode, Set Temperature, and Filter Sign

  • Emergency Stop

Note: All Points are for Indoor Units.There are no points

for Outdoor Unit, BC Controller, or Central Controller


Programming required

Programming Required

LonWorks

  • Mitsubishi: Make sure dipswitches are properly set on LMAP

  • BAS Contractor: Status, Error Code, Error Unit Address, Filter Sign, and Malfunction Log

  • Backup: Configuration of the LMAP is stored in permanent memory. Reconfiguration is done with dip switches. Configuration will not be lost unless cleared with dip switches.


Programming required1

Programming Required

BACnet

  • Mitsubishi: Initial BAC-HD150 setup using free, internet available software tool.

  • BAS Contractor: Status, Error Code, Error Unit Address, Filter Sign, and Malfunction Log

  • Backup: Configuration is kept in permanent memory. Reconfiguration is done with software and saved configuration file. Configuration will not be lost unless reconfigured with software tool.


Estimated cost

Estimated Cost

  • Mitsubishi: Cost of BACnet or Lon gateway, etc.

  • BAS Contractor: Project Specific


Commissioning

Commissioning

  • Mitsubishi Controls: Installing contractor with factory authorized service personnel assistance.

  • BAS System: Project Commissioning Agent


Mike cundiff commercial regional manager

Project Examples

Allied Health Bldg- LWTC

Tioga Library UW

Additional Schools:

  • UW Savery Hall – JCI

  • UW TransBldg – JCI

  • UW Joy Bldg – Siemens

  • Seattle Pacific U

  • Carnation Elem – Alerton

  • Tolt MS – CCI

  • Cherry Valley Elem – Alerton

  • Stillwater – Alerton

  • Bremerton H.S.

  • Bethel S.D.

  • Sitka SD – Alerton

  • Kirkland, WA

  • Alerton Integration

  • Controlled locally by campus facilities

  • 280 Tons 85 Zones

  • Tacoma, WA

  • Siemens Integration

  • Connected to UW campus

  • 45 Zones


Software updates and backup

Software Updates and Backup

  • Software Updates: All updates will be made available for free on the www.mylinkdrive.com website with instructions and all relevant information. Updates will be able to be performed without needing special parts or software that are not available for free on our website.

  • Back-Ups: Backup configuration file can be saved by the staff in any place that is safe. Software to load the configuration file is available for free on the www.mylinkdrive.com website with instructions and all relevant information.


Mitsubishi controls scheduling

Mitsubishi Controls - Scheduling

  • Holiday Scheduling:

  • Up to 50 days per year, such as public holidays can be scheduled as days that are different than the weekly schedule up to 24 months into the future (including the current month).

  • 5 seasonal weekly (Monday through Sunday) schedule settings are possible.


Mike cundiff commercial regional manager

Non BMS - Programming

  • Programming ability: On/Off, Mode, Fan Speed, Set Temp, Prohibits/Permits

  • Daily / Weekly / Annual Schedule

  • Weekly: 12 programs per day, one for each fan coil/group

  • Annual schedule out 2 years

  • 5 Patterns (Program Sequence)

Annual Schedule Web Browser Screen


Nw regional training

NW Regional Training

Mitsubishi Authorized

Training Center

Tacoma, WA


  • Login