Tasking
Download
1 / 8

integrated consumable item support icis model - PowerPoint PPT Presentation


  • 338 Views
  • Updated On :

Tasking. Know our WAR STOPPERS Know the WEAPON SYSTEMS Affected Know When We Will RUN OUT OF STOCK Base SUSTAINMENT DECISIONS. ICIS - The Objective.

Related searches for integrated consumable item support icis model

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'integrated consumable item support icis model' - liam


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Tasking

  • Know our WAR STOPPERS

    • Know the WEAPON SYSTEMS Affected

      • Know When We Will RUN OUT OF STOCK

        • Base SUSTAINMENT DECISIONS


Icis the objective
ICIS - The Objective

Continuously Assess DLA's Ability to Meet Service Consumable Item Support Requirements During Major Theater War and Other High Demand Scenarios.

Planning Conferences

Ao Model

Sustainment Planning

Combatant Commander

ICIS Model

Logistics Planning Agencies

Service Planners

DLA

PREVENT EXECUTION SURPRISES


Icis the process
ICIS The Process

  • Scenario Analysis within 4 hours

  • Coverage of all DLA Commodities

  • Resident on GCSS

  • Interact with Service Models

  • User of Shared Data

Service Inputs

OPLAN TPFDDs *

OPTEMPOs

Time Phased Demand on DLA

Service Ao Models

Personnel Planning Factors

Sustainment Metrics

COMPARE

MEI Information

Critical Item Info

DLA Asset Position/Location

Failure Factors

Problem Areas Identified

Consumption Factors

* Or Force Deployment Module


Status
Status

  • Full Operational Capability for:

    • Bulk Fuel

    • Subsistence

    • Fuels Deployment Modeling

    • Chemical Warfare Defense Equipment

  • In Redevelopment

    • Critical Repair Parts

    • Component Repair Parts

  • New Development

    • Class II


Real world uses
Real World Uses

  • ICIS Used To Generate Fuel Requirements For Desert Fox

  • ICIS Asked to Come To USAFE At Day 60 To Provide Fuel Requirements Support For Kosovo

  • Used By DESC & DLA In Support Of Current War On Terrorism

  • Used In Subsistence and Industrial Base Planning

  • Used in support of OIF


Icis version 5 0
ICIS Version 5.0

  • Oracle Based System

    • Standard And Adhoc Reports

    • Faster Processing

  • More Electronic Linkage To Data Sources

  • Interoperability With GCSS/DII-COE

  • Provide Capability To Edit/Change:

    - Major End Item OPTEMPOs

    - Composition Of Units

    - Meal Plans

  • Ability To Move Troops


Summary
Summary

  • ICIS Currently in use by Combatant Commanders, Services, DLA

  • Used in “Real World” and Exercise Scenarios

  • Reengineering ICIS to Make ICIS Better

    • More User Friendly

    • More Feedback

    • Establish IPT with the Centers

    • Class IX Expansion

  • Exploring Ties to other DoD Systems


ICIS Points of Contact

Program Manager: Mr. James Boyce,

DSN 427-1079/703-767-1079

[email protected]

Ed Pitt, DSN 427-1640/703-767-1640

[email protected]

Ray Borkowski, DSN 427-5259/703-767-5259 [email protected]

FAX 427-1516/703-767-1516


ad