1 st Light AO 4 LBT: Status & development

AG W. 1 st Light AO 4 LBT: Status & development. Structure support. Electronics equipment. Auxiliary unit. Bayside’s stages. WFS board. Were missing..... (June 3, 2003). Realization of the double piramid [ARC], expected July-Sep03 Moved to end October 03.

lexiss
Download Presentation

1 st Light AO 4 LBT: Status & development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AGW 1st Light AO 4 LBT:Status & development

  2. Structure support Electronics equipment Auxiliary unit Bayside’s stages WFS board

  3. Were missing.....(June 3, 2003) Realization of the double piramid [ARC], expected July-Sep03 Moved to end October 03 BCU delivery [MG], expected June03: Received July03, upgrade Sep03, fully functional Electronic box, design Aug03 [ARC/AIP], delivery jan04 [AIP]: Design completed mid October, Boxes delivery Jan03 (no cooling) Secondary optics mount: FW1, FW2, ADC rotators, design Sep03, delivery Dec03 [ARC/AIP]. No progress but mounts designed and realized in Arcetri Finalizing mechanical design of support structure for xyz stages & Auxiliary units [ARC/ADS], expected July03, realization AIP. Design completed Sep03, offer requested from AIP Technical viewer CCD. CCD selected EEV47BI-AIMO, ready for Order, delivery in 4months oct03 [SciMeasure]. Camera system Ordered 3 July 2003

  4. Telescope connections System Connections to Telescope • Optical Fiber #1 • Power Cable 110V (800W) • Cooling Line for Electronic Boxes • Cooling Line for CCDs

  5. Integration completed Bayside stages delivery Parts delivery Design completed AO sytem tower install. completed AO system integration and test completed Parts delivery Design completed Parts Delivery (Sep15) AO system Test LBT672a + WFS + WFR Design completed Parts Delivery AIP (Dec12) P45 delivery (Jul26) LBT672a delivery Tower install. completed Test at AIP tel. Simulator (1-2 weeks) • Polishing of double pyramid, Oct 2003 • Stability of XYZ stages test in Potsdam Jan 2004 • Functionality of test tower, March 2004 Critical Issues Schedule at Oct 2003

  6. Picture from Lab I

  7. Picture from Lab II

  8. Picture from Lab III

  9. The current test

  10. The Supervisor Software

  11. Cost Report Project duration: Sep2001-Jun2004 Total project cost: 772KE Labour cost: 383KE (9.35FTE, 4.1KE / FTE) Hardware cost: 389KE (2 units), including 2 WFS CCDs HW not accounted for: 2 Tech viewer CCD & HW for system dev. FTE calculation based on shipping end June 2004 Involved People

  12. So...... A clear division of the work between Arcetri & AIP WFS board integration ready for Jan 2004 Stability and Cabling Test of W board in Potsdam Jan-Feb 2004 Test of W board + P45 in Arcetri Feb-Jun 2004 Tower test W + LBT672 in Aug-Oct 2004 Shipping to LBT Nov 2004