proposed ercot nodal agc framework
Download
Skip this Video
Download Presentation
Proposed ERCOT Nodal AGC Framework

Loading in 2 Seconds...

play fullscreen
1 / 7

Proposed ERCOT Nodal AGC Framework - PowerPoint PPT Presentation


  • 75 Views
  • Uploaded on

Proposed ERCOT Nodal AGC Framework. Bob Green Garland Power and Light Co. January 3, 2007. Key Features. SCED Base Points follow the daily load profile (5 minute update) REG and RRS deployments follow the frequency profile (4 second update)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Proposed ERCOT Nodal AGC Framework' - lesley-avila


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
proposed ercot nodal agc framework

Proposed ERCOT Nodal AGC Framework

Bob Green

Garland Power and Light Co.

January 3, 2007

key features
Key Features
  • SCED Base Points follow the daily load profile (5 minute update)
  • REG and RRS deployments follow the frequency profile (4 second update)
  • NSRS provides generation capacity to SCED based on operator judgment
frequency will not be equal to 60 hz because
Frequency will not be equal to 60 HZ because:
  • The sum of the governor 60 HZ Set Points is not equal to the ERCOT load
  • Real time load is different from the value dispatched in SCED
  • Units are not following control base points
  • Time lags and ramp limits in the AGC process
  • Unit trip(s)
problems with adding rrs deployment to the sced input
Problems with adding RRS deployment to the SCED input
  • Will cause frequency overshoot and reverse direction REG
  • Will probably cause units not bidding RRS to receive higher SCED Base Points
changes required in the nodal protocols
Changes required in the Nodal Protocols
  • Delete 6.5.7.6.2.2 (9)
  • Modify 8.1.2.4.2 (1)
ad