Grizzly-Summer Lake 500 kV Line
This presentation is the property of its rightful owner.
Sponsored Links
1 / 10

Background PowerPoint PPT Presentation


  • 58 Views
  • Uploaded on
  • Presentation posted in: General

Grizzly-Summer Lake 500 kV Line Planned Outage May 27-June 15 2008 1900-2400 hours Mike Viles – BPA Transmission Operations Technical Management Team June 4, 2008. Background.

Download Presentation

Background

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Grizzly summer lake 500 kv line planned outage may 27 june 15 2008 1900 2400 hours mike viles bpa transmission operat

Grizzly-Summer Lake 500 kV LinePlanned OutageMay 27-June 15 20081900-2400 hoursMike Viles – BPA Transmission OperationsTechnical Management TeamJune 4, 2008


Background

Background

  • A continuous outage of sections of the Grizzly-Summer Lake line had been planned for spacer damper replacement for May 27 – June 15

  • A planned outage of this line is hard to get because:

    • It significantly reduces the California-Oregon Intertie (COI) capability

      • OTC reduces from above 4000 MW to 2800 MW north to south to protect for the next double contingency

    • Ponderosa 500/230 kV transformer forced out of service and creates potential load service issues except during lighter load conditions

      • Late spring loads are lighter due to mild temperatures compared to winter and summer loads


Grizzly summer lake 500 kv line planned outage may 27 june 15 2008 1900 2400 hours mike viles bpa transmission operat

G

Legend

JOHN DAY

SLATT

230kV

500kV

O/S

BUCKLEY

MARION

Cascades

ALVEY

GRIZZLY

SAME

CORRIDOR

DIXONVILLE

PONDERSOA

CENTRAL

OREGON

LOAD

MERIDIAN

KLAMATH COGEN

G

SUMMER LAKE

IDAHO

CAPT JACK

MALIN

OREGON-CALIFORNIA

INTERTIE

OLINDA

ROUND MTN


Outage

Outage

  • In early May it was decided to cancel this line outage due to concerns about the impact of the outage on the COI with a late runoff

  • Work to replace gun shot insulators, repair conductor and repair overhead ground wire on the line had also been planned

  • There was a need to get that work done to prevent an unplanned outage of the line

    • There would not be another window of opportunity to take a planned outage of this line in 2008


Damaged insulator string

Damaged Insulator String


Repairing insulator string

Repairing Insulator String


Outage1

Outage

  • Daily outages from 1900 to 2400 hours were coordinated to minimize the impact of the outage

    • All the repairs that are needed can be done during this 20 day period

    • Some of the work is being done during darkness so only the local line crew that is familiar with the terrain is willing to do the work


Outage impacts

Outage Impacts

  • The COI OTC is reduced to 2800 MW

    • The next slide shows the actual COI flow versus the scheduling limit which is lower than the OTC

  • The PDCI is allowed to go to full 3100 MW capacity during the outage


Coi actual flow vs scheduling capacity

COI Actual Flow vs Scheduling Capacity


The end

The End


  • Login