An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TM0 componentsinventory and procurement schedule In lab testing facility A.Bartalesi

  2. Inventory layout • RF system • Accelerating structure (x16) • PETS structure (x8) • RF distribution and loads • Vacuum system • BI and Vacuum systems • BPM-DBQ chamber assembly • Magnet system • Cooling system • Supporting system • Pre-alignment system A.Bartalesi

  3. Components priority Labels: 3D done2D done Ordered Delivered A.Bartalesi

  4. Accelerating structureoverview Flange (VS) Compact load (RS) MB Unit (Assembly) Waveguides (RS) Manifold (RS) Intermodule interconnection (VS) Cooling tubes (RS) A.Bartalesi

  5. A.Bartalesi

  6. RF systemAccelerating structure (1 of 5) A.Bartalesi

  7. RF systemAccelerating structure (2 of 5) A.Bartalesi

  8. RF systemAccelerating structure (3 of 5) A.Bartalesi

  9. RF systemAccelerating structure (4 of 5) A.Bartalesi

  10. RF systemAccelerating structure (5 of 5) A.Bartalesi

  11. PETS structureoverview DRIVE BEAM – PETS ASSEMBLY PETS On-Off (Coupler) Cooling adapter Cooling tubes PETS Minitanks Cooling fittings adapter PETS Mock-Up Interconnection Flanges (Fixed) Interconnection Flanges (Fixed) A.Bartalesi

  12. A.Bartalesi

  13. RF systemPETS structure (1 of 3) A.Bartalesi

  14. RF systemPETS structure (2 of 3) A.Bartalesi

  15. RF systemPETS structure (3 of 3) A.Bartalesi

  16. RF distribution and loadsoverview RF networks Type 2 Type 1 Load Mock-up Load Mock-up A.Bartalesi

  17. A.Bartalesi

  18. A.Bartalesi

  19. RF systemRF loads and distribution (1 of 3) A.Bartalesi

  20. RF systemRF loads and distribution (2 of 3) A.Bartalesi

  21. RF systemRF loads and distribution (3 of 3) A.Bartalesi

  22. Vacuum systemoverview Vacuum network Central vacuum tank and pumps Type 1 Type 2 A.Bartalesi

  23. A.Bartalesi

  24. A.Bartalesi

  25. Vacuum system (1 of 3) A.Bartalesi

  26. Vacuum system (2 of 3) A.Bartalesi

  27. Vacuum system (3 of 3) A.Bartalesi

  28. BI systemoverview Vacuum chamber BPM mockup Rotating flange A.Bartalesi

  29. BI System (1 of 2)(BPM-DBQ assembly) A.Bartalesi

  30. BI System (2 of 2) (BPM-DBQ assembly) A.Bartalesi

  31. Magnet systemoverview DBQ mock-up A.Bartalesi

  32. Magnet system (1 of 2) A.Bartalesi

  33. Magnet system (2 of 2) A.Bartalesi

  34. Cooling system A.Bartalesi

  35. Supporting systemoverview DB (boostec) Central vacuum tank support MB (microcontrole) A.Bartalesi

  36. A.Bartalesi

  37. Supporting system (1 of 2) A.Bartalesi

  38. Supporting system (2 of 2) A.Bartalesi

  39. Pre-alignment systemDB components only (1 of 2) A.Bartalesi

  40. Pre-alignment systemDB components only (2 of 2) A.Bartalesi

  41. Pre-alignment systemMB components only (1 of 2) A.Bartalesi

  42. Pre-alignment systemMB components only (2 of 2) A.Bartalesi

  43. Thanks for you attention -and- Thanks to all the procurement responsible people for their precious help! A.Bartalesi