Cpe hydraulic investigation
Download
1 / 10

CPE Hydraulic Investigation - PowerPoint PPT Presentation


  • 88 Views
  • Uploaded on

CPE Hydraulic Investigation. By: Kelly Best, Chelsea Burkett, and Shannon Sullivan. Representation : How should the study area be described? Process : How does the study area currently operate? Evaluation : Is the current study area working well?

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' CPE Hydraulic Investigation ' - leigh-harper


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Cpe hydraulic investigation

CPE Hydraulic Investigation

By: Kelly Best, Chelsea Burkett, and Shannon Sullivan


O verview

  • Representation: How should the study area be described?

  • Process: How does the study area currently operate?

  • Evaluation: Is the current study area working well?

  • Options: How might the study area be altered?

  • Impact: What differences would these changes cause?

  • Final Decision: How should the study area be changed?

Overview


Representation of area

Representation of Area


Representation of area1
Representation of Area

  • Catchment area that drains to this point is shown in green

  • Two inlets for the drainage area


Current process
Current Process

  • Red– Major pipeline affected by drainage of area

  • Yellow – Manholes affected by the area

  • Blue – Inlets of the catchment area

  • Black – Pipelines that flow into and out of major pipeline

Reference: Carlos Galdeano


Evaluation of current o perations

Manhole

Evaluation of Current Operations


Evaluation of current operations

Manhole

Evaluation of Current Operations


Options

  • Option 1: Rain Garden

  • Calculations of area required to do this is shown to the right

  • Potentially could help prevent flooding, improve water quality, and improve aesthetics

Options

  • Option 2: Additional Piping under the Pedestrian Bridge

  • Would help alleviate standing water on bridge during storms

  • Creates more flow to the piping system


Still to come

Still To Come…


Questions