Alternative 3 – R0, Options: 1, 2, 3 & 4
This presentation is the property of its rightful owner.
Sponsored Links
1 / 2

Alternative 3 – R0, Options: 1, 2, 3 & 4 2013 – Net Average Flow (MW) PowerPoint PPT Presentation


  • 74 Views
  • Uploaded on
  • Presentation posted in: General

Alternative 3 – R0, Options: 1, 2, 3 & 4 2013 – Net Average Flow (MW). Legend: R0 – (Reference Case) Opt 1 (Mont & Tesla) Opt 2 (UT & Tesla) Opt 3 (UT & Grizzly) Opt 4 (SWIP & Tesla). Alternative 4 – Options 1 & 2 (WY to CA DC-3000 MW) 2013 – Net Average Flow (MW). Legend:

Download Presentation

Alternative 3 – R0, Options: 1, 2, 3 & 4 2013 – Net Average Flow (MW)

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Alternative 3 r0 options 1 2 3 4 2013 net average flow mw

Alternative 3 – R0, Options: 1, 2, 3 & 4 2013 – Net Average Flow (MW)

Legend:

R0 – (Reference Case)

Opt 1 (Mont & Tesla)

Opt 2 (UT & Tesla)

Opt 3 (UT & Grizzly)

Opt 4 (SWIP & Tesla)

Transmission Solutions- 2013


Alternative 3 r0 options 1 2 3 4 2013 net average flow mw

Alternative 4 – Options 1 & 2 (WY to CA DC-3000 MW)2013 – Net Average Flow (MW)

Legend:

R0 (Reference Case)

Opt 1 (Wyo to SF)

Opt 2 (Wyo to LA)

Transmission Solutions- 2013


  • Login