Engineering solutions event
Download
1 / 29

Engineering Solutions Event - PowerPoint PPT Presentation


  • 71 Views
  • Uploaded on

Engineering Solutions Event. Six students will design a solution to an engineering problem. Students will work as a team to design solutions. Teams will be receive a set of construction materials and pricing charts. There are potentially multiple solutions to the problem.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Engineering Solutions Event' - leane


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Engineering solutions event
Engineering Solutions Event

  • Six students will design a solution to an engineering problem.

  • Students will work as a team to design solutions.

  • Teams will be receive a set of construction materials and pricing charts.

  • There are potentially multiple solutions to the problem.















Engineering solutions event1
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.


Engineering solutions event2
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    Each cube represents a hotel room.

    All 50 cubes must be used.


Engineering solutions event3
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    Entire hotel must be connected as one piece.


Engineering solutions event4
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    Entire hotel must be connected as one piece.


Engineering solutions event5
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    Entire hotel must be connected as one piece.


Engineering solutions event6
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    All rooms must have at least one window. (A window is any exposed vertical side of cube.)


Engineering solutions event7
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    All rooms must have at least one window. (A window is any exposed vertical side of cube.)


Engineering solutions event8
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    All rooms must have at least one window. (A window is any exposed vertical side of cube.)


Engineering solutions event9
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    COSTS

    Land costs $400 per square unit.

    Land refers to outline of top view of building.


Engineering solutions event10
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    COSTS

    Land costs $400 per square unit.

    Land refers to outline of top view of building.

18


Engineering solutions event11
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    COSTS

    Land costs $400 per square unit.

    Land refers to outline of top view of building.

15

18


Engineering solutions event12
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    COSTS

    Land costs $400 per square unit.

    Land refers to outline of top view of building.

15

18


Engineering solutions event13
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    COSTS

    A roof costs $10 each. ( A roof is any exposed top side of cube.)

    A window costs $5 each.


Engineering solutions event14
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    COSTS

    Taxes will be collected based on building height.

    Floors 1-10 —> 50%  x land cost

    Floors 11-20 —> 1000% x land cost

    Floors 21-30 —> 2000%

    Floors 31-40 —> 3000%

    Floors 41-50 —> 5000%


Engineering solutions event15
Engineering Solutions Event construction projects.

  • Goal: Build a hotel that yields the highest profit.

    INCOME

    4 windows, 1 roof = $600

    4 windows, 0 roof = $500

    3 windows, 1 roof = $300

    3 windows, 0 roof = $250

    2 windows, 1 roof = $200

    2 windows, 0 roof = $175

    1 window, 1 roof = $150

    1 window, 0 roof = $125


ad