Presented by:
This presentation is the property of its rightful owner.
Sponsored Links
1 / 14

Presented by: STREETS & STORMWATER DEPARTMENT Gregg Strakaluse, Director and PowerPoint PPT Presentation


  • 50 Views
  • Uploaded on
  • Presentation posted in: General

Presented by: STREETS & STORMWATER DEPARTMENT Gregg Strakaluse, Director and George Archibald, Traffic Engineer May 14, 2012. PEDESTRIAN AND BICYCLE MASTER PLAN. BACKGROUND: PLAN DEVELOPMENT: 2006-2007 ADOPTION: October 2007 pursuant to Res. 07-11791 & 07-11792 BASIS OF PROGRAMS:

Download Presentation

Presented by: STREETS & STORMWATER DEPARTMENT Gregg Strakaluse, Director and

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Presented by streets stormwater department gregg strakaluse director and

Presented by:

STREETS & STORMWATER DEPARTMENT

Gregg Strakaluse, Director

and

George Archibald, Traffic Engineer

May 14, 2012


Presented by streets stormwater department gregg strakaluse director and

PEDESTRIAN AND BICYCLE MASTER PLAN

  • BACKGROUND:

  • PLAN DEVELOPMENT: 2006-2007

  • ADOPTION: October 2007 pursuant to Res. 07-11791 & 07-11792

  • BASIS OF PROGRAMS:

  • SIDEWALK IMPROVEMENTS:

  • School access

  • Missing links

  • Collector roads

  • BIKE IMPROVEMENTS:

  • Signing and marking bike facilities

  • Establishing routes and segments on Gulfshore Blvd.

  • Construct routes on Crayton Rd. and Gulfshore Blvd.

  • Education & Safety


Presented by streets stormwater department gregg strakaluse director and

COMPLETED and/or FUNDED SIDEWALKS

To leverage State funding opportunities and more quickly complete sidewalk gaps, the City has successfully worked through the Metropolitan Planning Organization.


Presented by streets stormwater department gregg strakaluse director and

COMPLETED PROJECTS

5th Ave South and 2nd St. S. 5th Ave South and Gulf Shore Blvd.S.


Presented by streets stormwater department gregg strakaluse director and

COMPLETED PROJECTS

Harbour Drive Sidewalks and Bike Lanes


Presented by streets stormwater department gregg strakaluse director and

COMPLETED PROJECTS

Gulf Shore Blvd. Sidewalks


Presented by streets stormwater department gregg strakaluse director and

COMPLETED PROJECTS

Park Shore Drive Sidewalks


Presented by streets stormwater department gregg strakaluse director and

PROJECTS STILL TO BE COMPLETED

(Public Involvement/Design/Const)

* Estimate based on $13.50 / SF


Presented by streets stormwater department gregg strakaluse director and

St. Ann School


Presented by streets stormwater department gregg strakaluse director and

Sidewalks

for beach access


Presented by streets stormwater department gregg strakaluse director and

WALKABILITY SCORE

http://www.walkscore.com/


Presented by streets stormwater department gregg strakaluse director and

PLAN AMENDMENTS TO CONSIDER

  • Sidewalks for beach access

  • Greenway and Park-to-Park connectivity

  • Establishment of new bike routes

  • Walkability program for downtown

  • Public awareness-safety program

  • Way finding signs


Presented by streets stormwater department gregg strakaluse director and

PUBLIC INVOLVEMENT/SCHEDULING

Public Meetings

Presidents Council Presentation

Social Media

Flyers

Mailings

Scheduling: Jun. 2012-Dec. 2012


Presented by streets stormwater department gregg strakaluse director and

SUMMARY OF RECOMMENDATIONS

  • Allocate Department staff time and $15,000 from the Streets & Traffic Operating Budget towards transportation consulting fees (approx. 100 man-hours over 7-months).

  • Develop Specific and General Plan Amendments To Consider – late spring

  • Coordinate the Public Participation Processes – summer and early fall

  • Compile Proposed Amendments - late fall

  • City Council Workshop - end of 2012


  • Login