Brahmatej Meka Raymond Songer Jeff Marcelus. Team 3 Go-Kart for Shane. Shane Davis 6 sunrise drive, Columbia CT (954)-850-5448. Electrical Engine. Sprocket. Seat. Microcontroller/Joystick. Future Work.

Download Presentation

Team 3 Go-Kart for Shane

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Team 3 go kart for shane

BrahmatejMeka

Raymond Songer

Jeff Marcelus

Team 3Go-Kart for Shane

Shane Davis

6 sunrise drive, Columbia CT

(954)-850-5448


Electrical engine

Electrical Engine


Sprocket

Sprocket


Team 3 go kart for shane

Seat


Microcontroller joystick

Microcontroller/Joystick


Future work

Future Work

  • Jeff: In the coming weeks I plan to define the specific sprocket sizes and chain length that would maximize the power transferred from the electrical engine to the rack and pinion. I also plan to work on the wiring of the engine and the integration of the potentiometers into the steering system.

  • Brahmatej: I am going to finish working on the seat and continue working on the C programming by working on tutorials and looking at previous programs.

  • Raymond: This coming week I plan on ordering a microcontroller so that programming can begin as soon as possible. The go kart is also supposed to arrive this week so deconstruction of the chassis will start as soon as possible. The actuators, potentiometers, and seat are all on order forms ready to be ordered. These will be handed in Monday during the group presentation.


Hours worked

Hours Worked

  • Jeff

    • This week- 13 HRS

  • BrahmatejMeka

    • This week- 14 HRS

  • Raymond Songer

    • This week- 9.5 HRS