An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCT Services Installation ID week full report (July 4) SCT Cables Web page http://www-atlas.lbl.gov/ciocio/SCTcables/ Workpackage https://edms.cern.ch/document/593278/ A.Ciocio -SCTSG

  2. Type II/III cables – Installation • 3594 cables installed and tested • All 2112 barrel cables (sectors 1,3,7,9,11,15) • All endcap cables for sectors 1,3,7,9 • 494 (sector 11&15) will be installed in August • Yield: • <1% cables with defects or to replace • - Mechanical defects • - Damage during installation or preparation • Failed electrical test (most probably due to splice damage) after installation (replaced) • Additional inspection of damage and final verification that individual wires are strongly fixed inside the JST and FCT when they will be disconnected from dPP1. A.Ciocio -SCTSG

  3. S5 S3 S7 S1 S9 S15 S11 S13 Type II-III and Fibre Cables by Sector USA PP3 racks US PP3 racks 336 Barrel 247 EC Level 7 336 Barrel 247 EC Level 8 27 Fibre cables (9 EC, 18 Barrel) 27 Fibre cables (9 EC, 18 Barrel) Level 5 & 2 384 Barrel 494 EC 384 Barrel 494 EC Level 6 18 Fibre cables (Barrel) 18 Fibre cables (EC) 336 Barrel 247 EC 336 Barrel 247 EC Level 1 & 2 Level 2 27 Fibre cables (9 EC, 18 Barrel) 27 Fibre cables (9 EC, 18 Barrel) • Fibre Cables to USA15 A.Ciocio -SCTSG

  4. SCT Cables by Sectors Sequence • Sector 5 (top) and Sector 13 (bottom) • heater cables, and DCS cables (completed) • Sector 9 - Installation completed on May 1 • 878 SCT cables (384 Barrel, 494 EC) • 18 Fibre cables (EC) • Sector 3 - Installation started on May 2 – completed on June 4 • 583 SCT cables (336 Barrel, 247 EC) • 27 Fibre cables (9 EC,18 Barrel) • Sector 1 - started in parallel mid May – completed on June 13 • 878 SCT cables (384 Barrel, 494 EC) • 18 Fibre cables (Barrel) • Sector 7 – started on June 7 – completed on June 29 • 583 SCT cables (336 Barrel, 247 EC) • 27 Fibre cables (9 EC,18 Barrel) • Sectors 11, 15 – 336X2 barrel cables installed – July 18 • 583 + 583 SCT cables (336 Barrel, 247 EC) • 27 + 27 Fibre cables (9 EC,18 Barrel) • Installation sequence in a sector is: • Tubes, fibres, heater cables, SCT cables, (Muon cables), • TRT cables, pixel cables A.Ciocio -SCTSG

  5. Type IV Cables - Installation • All type IV cables (2044+spares) going from PP3 racks in the ATLAS cavern to PS racks in US15 installed (+ connectors) • Type IV going to USA15 almost completed • 64 double harnesses to install (128 cables) • 6 more days • Testing in racks after installation and first cut ongoing Completed installation is expected in one week A.Ciocio -SCTSG

  6. Type IV – Connectors in situ • All connectors (2000+) in US15 completed on March 10 (a few were left but they are done now) • Many racks are tested before and after plug into PS (Petr with Prague team) • Very good yield but some rework was necessary • One rack (the very first one made more than an year ago) needs cables rerouting (cables were cut too long by previous company) • 2+1 CPE techs returned in mid-April for a few weeks • US side was reworked • Started 2 USA racks but left again because more USA15 racks were needed to be completed for the full team to operate efficiently • A team of 6 techs (1 supervisor) will return this week • Estimated completion of connectors in USA racks: End of August A.Ciocio -SCTSG

  7. PP3 • Assembly and Installation completed • Checks for shorted units and problems in progress • Plug-in of type IV cables • Problems found after installation in the last few months • Insulation • Sliding units in subracks • Failed units (2+) A.Ciocio -SCTSG

  8. Installation & Testing Activities A.Ciocio -SCTSG

  9. Schedule • Type II-III barrel installation completed today • Endcap cables of sector 11&15 to install after the Solenoid Field Mapping (July 19- Aug 14) • Type II-III installation mid-July (Barrel) • end of August (last Endcap cables – 494) • Type IV installation 24 July • Connector in situ+testing end of August • PS crates end-July (US side) – September (USA side) • PP3 assembly, installation end-July • All cables plugged into PP3 mid-July- begin August (type IV) • end-August (type II-III) • Test of whole chain now – mid September A.Ciocio -SCTSG

  10. Plan A.Ciocio -SCTSG

  11. PS priorities A.Ciocio -SCTSG

  12. Issues • PP3 • We find problems as we plug in and test • Type IV all connected by end of July • Hopefully OK when Type III are connected • Tester • Different flavor that work with different configuration of cable chain • Multiple laptops failure (~ok now) • Need help at CERN of experts (Ljubljana) when testing whole chain • Defective dPPF1 • Some faulty cables were actually due to a bad channel on dPP1 (3 endcap 3 barrel) • Still missing some dPPF1 • Connector in situ • Delay will move installation of PS later • Need more HELP with testing until end of August (mid September) A.Ciocio -SCTSG