2013 Annual Streamer Dogfight Competition Model Airplane Prepared for: Dr. Stracener

Project Presentation. 2013 Annual Streamer Dogfight Competition Model Airplane Prepared for: Dr. Stracener Prepared by: Levi Duncan Date: 4/26/2012. Systems Engineering EMIS. Dr. Jerrell Stracener-Associate Professor. Background. Scope/Motivation:

lane-cherry
Download Presentation

2013 Annual Streamer Dogfight Competition Model Airplane Prepared for: Dr. Stracener

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Presentation 2013 Annual Streamer Dogfight Competition Model Airplane Prepared for: Dr. Stracener Prepared by: Levi Duncan Date: 4/26/2012 Systems Engineering EMIS Dr. Jerrell Stracener-Associate Professor

  2. Background • Scope/Motivation: I am an Aeronautical Engineer who is hired for a side job to fabricate and deliver a model airplane to Team Lightning (father & son) in order for the team to compete in the 2013 Annual Streamer Dogfight Competition. This is their fifth year to enter in the competition, and they have decided to go with a different approach to develop their model. • Goal: My goal is to design, perform reliability analysis, build, integrate, and test the model airplane, ensuring it meets Team Lightning’s required, operational needs for their competition. 2

  3. Team Lightning Requirements Customer: Team Lightning Operational Need: Remote control model airplane that is required to be effectively maneuverable and evasive to compete with other registered aircraft in the 2013 Annual Streamer Dogfight Competition. 3

  4. Team Lightning Requirements(Cont.) Description: The model airplane must operate in the air for a minimum of 6 minutes and have high speed and quick turning capability. The aircraft’s system shall consist of the following major components: • Balsa/hardwood airframe • 2-cycle gas engine • Transmitter/receiver/5-servo electric control system • Landing Gear • Monokote finish 4

  5. Team Lightning Requirements(Cont.) • Schedule: • Flight Test: Model airplane shall be ready for flight test and verification 9 months from job start date. • Delivery: Fully functional and verified model airplane shall be delivered to Team Lightning for training 11 months from job start date. • Team Lightning Priorities: • 1. Flight time • 2. Weight • 3. Maneuverability • 4. Delivery for training • 5. Total cost not to exceed $4,750 5

  6. Requirements 6

  7. Requirements 7

  8. Program Performance Measures 8

  9. Program Performance Measures 0.5 450 1 100 7 3.5 10 55 Goal 50 600 8 0.65 150 4.5 8 1.5 200 2 9 900 0.8 6 6 40 Threshold C1 C2 S1 T1 T2 T3 T4 S2 Design/Build Cost (man hrs) Test/Verify Cost (man hrs) Design/Build Time (months) Weight (lbs) Flight Time (min) Top speed (mph) Barrel roll Time (s) Test/Verify Time (months) 9

  10. Key Performance Parameter Line Graph A/C Weight (lbs) Tolerance Band 10 Planned Profile 8 6 Threshold Actual Value 4 Planned Value Goal 2 Time 10

  11. Integrated Master Plan Team Lightning TRR LOA PDR CDR SRR TRR Air System • A/C ready for flight • test • Detailed • procedures • developed to • perform flight test • Risk assessment • (emphasis on • flight test) • System req. defined • Performance req. • defined • Initial risk • assessment • established • Design and interfaces defined (airframe, engine, electronic controls, gear, finish) • Draft test plans developed • Risk assessment (emphasis on detailed design) • A/C design and integration frozen with drawings ready for release • Final test plans written • A/C ready for production • Risk Assessment (emphasis on final design & producibility) • A/C ready for • integration testing • Detailed • procedures • developed to • conduct testing • Risk Assessment • (emphasis on • integration • testing) Key Accomplishments 11

  12. Integrated Master Schedule 230 hrs 230 hrs 230 hrs 230 hrs 12

  13. Achievements • Objectives: - Design a reliable and affordable product - Manufacture a quality product - Execute successful testing of product - Deliver product to customer on time - Product meets customer’s needs as advertised - Keep good reputation of my side business

  14. Risk Management • Risks: - Repair cost uncertainties - Engineer’s technical experience - Violating TPM thresholds - Engineer’s flying experience for flight test - Customer’s learning capabilities during flight training 14

  15. Benefit • Opportunity to promote growth in my side business • A chance to strengthen reliability analysis skills with real world product • Discover new ideas for future business products 15

  16. Approach • Strategy/SOW: - Design architecture of model airplane - Perform reliability analysis on key components to determine optimal performance to customer’s priorities - Start build of the model airplane’s optimized design - Perform integration testing - Perform flight testing - Deliver model airplane to customer - Train customer to operate aircraft 16

  17. Ground Rules and Assumptions • Scope: Assessment will apply to the design, reliability analysis, build, and flight test for model airplane, which is due 11 months after job go-ahead for Team Lightning training • Customer: Assume the customer’s requirements will not change after job go-ahead • Dependency: Assume all design programs, build tools, and pre-flight equipment will be accessible and have licenses granted for use; all procured parts delivered will meet system and cost requirements • Schedule: Assume all procured parts will be delivered on time for both model airplanes to support the design, reliability analysis, build, and flight test • Cost: Assume cost of design programs, build tools, and pre-flight equipment will not be included in the assessment

  18. Ground Rules and Assumptions • Failure rate is constant • Exponential model is utilized for reliability analysis for key air system components • All items come on and function continuously at time = 0; all items turn off and stop functioning at time = t • Reliability analysis is performed based on past experience data • Cost is low priority to customer, so cost analysis will not be part of this assessment • Qualification test results for procured parts were not available from the supplier; reliability spec parameters are assumed from past experience • Flight time is customer’s top priority, so this TPM will be the only parameter assessed in the reliability analysis

  19. Work Breakdown Structure

  20. Analysis Overview • Tasks: To evaluate the reliability of the flight time performance measure of the model airplane. • Method: • - Use exponential model to evaluate reliability; failure • rate and test time will be attained from past • experience testing • - Qualification testing done in same environment as • the customer • - Conduct analysis of reliability of TPM using • series configuration • End State: Calculate R(t) for each key component, then calculate overall system R(t) for evaluation of • airplane 20

  21. Reliability Analysis • Test collection environment: • - Same exact model airplane has been flown for my personal • pleasure • - 210 cumulative flight minutes (3.5 hrs) recorded in log • book • - Over total flight time, the following failures have • occurred: 2 transmitter/receiver faults, 1 servo fault, 6 engine • faults • Test Results: • t (hours) = 3.5 • Tx/Rx failure rate (, failures/hour) = 2/3.5 = 0.57 • Servo failure rate (, failures/hour) = 1/3.5 = 0.28 • Engine failure rate (, failures/hour) = 6/3.5 = 1.7

  22. Reliability Analysis 22

  23. Reliability Analysis • Required flight time TPM (KPP): 6 minutes (0.1 hrs) • Reliability Equation: R(t)=e -t • RTx/Rx = e –(0.57*0.1) = 0.945 • RServo = e –(0.28*0.1) = 0.972 • REngine = e –(1.7*0.1) = 0.844 23

  24. Reliability Analysis • The model airplane’s key components are in a series configuration for the air system to successfully operate. • RS = (RTx/Rx)*(Rservo 1)*(Rservo 2)*(Rservo 3)* (Rservo 4)* (Rservo 5)*(Rengine) • RS = (0.945)*(0.972^5)*(0.844) • RS = 0.692 = 69.2% Tx/Rx Engine Servo (5x) (elevator) (RH aileron) (throttle) (LH aileron) (rudder) 24

  25. Reliability Analysis System failure rate = = 0.57 + 0.28 + 1.7 = 2.55 System MTTF = = 1/2.55 = 0.392 hrs = 23.52 min 25

  26. Results/Conclusions • Results: • - Overall reliability of model airplane is 69.2% • - Overall MTTF of model airplane is 23.52 minutes • Conclusions: • - Reliability of model airplane is acceptable to the customer, • Team Lightning, with the following things considered: • Required flight time is only 6 minutes • Regarding nature of competition, risk of losing • model airplane is on customer anyway • Engine is least reliable key component; emergency • landing procedures will be provided to customer in case • of engine failure 26