Capstone Design Project RF Weather Buoy Spring 2005 Team #3

Capstone Design Project RF Weather Buoy Spring 2005 Team #3. Team #3: Expertise & Experience. Expertise: Power Distribution/Programming Experience: Cooper Power Systems Expertise: Organizational skills, wiring hardware, Product Development Experience: Honeywell FM&T

lance
Download Presentation

Capstone Design Project RF Weather Buoy Spring 2005 Team #3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capstone Design Project RF Weather Buoy Spring 2005 Team #3 1

  2. Team #3: Expertise & Experience • Expertise: Power Distribution/Programming Experience: Cooper Power Systems • Expertise: Organizational skills, wiring hardware, Product Development Experience: Honeywell FM&T • Expertise: Computers / Law Experience: MPC Computers • Expertise: Computers and Communications Experience: JCI Internship • Expertise: Amplifier / Filter Design Experience: Academic • Expertise: Drives, Power Systems Controls Experience: P & H Mining Equipment • Nole Martin • Paul Simons • Eric Ritzke • Thomas Reuter • Steven Krol • Murtadha B. Tunis

  3. 1200 Man hours (Estimated) 2000+ Man hours (Actual) $1000 for material and prototyping (Estimated) $450 (Actual) Team #3: Total Resources

  4. Wireless Weather Buoy Primary Benefit: Real-time Local Weather Information Intended for use by private water-front property owners. Product will report air and water temperature, barometric pressure and wind speed via RF communications. Similar weather stations exist, but not for private use. Maritime Consumer Market Selected Product

  5. Similar Existing Product • Features • Wind speed • Wind direction • Barometer • Safety lights • GPS • Solar power • Humidity sensor • Water quality analyzer • Advantages of our product: • Cost effective • Only essential sensors • will be implemented

  6. Basic Business Case • Estimated Average Product Selling Price: $700 • Estimated Product Annual Sales Volume: 1000 Units • Estimated Per Unit Cost of Parts and Materials: $300 • Estimated Per Unit Cost of Assembly, Testing and Mfg: $50 • Estimated Total Development Cost (Labor + Material): $494,000 • Calculated Annual Sales (ASP$ x Annual Volume): $700,000

  7. Basic Business Case • Calculated Per Unit Cost Margin (ASP$ - [Parts + Materials + Mfg] x Costs$): $350 • Calculated Cost Margin (Per Unit CM$ / ASP$): 50% • Calculated Annual Cost Margin (CM% x Annual Sales$): $350,000 • Calculated Return On Investment (Est. Dev. Cost$ / Annual CM$): 1.411 Years.

  8. Block Diagram Solar Recharging Battery Water & Air Temperature Sensor Pressure Sensor Wind Speed Sensor Power Conversion Circuits Microprocessor Microprocessor And Display 2 LED w/ Controls RF Transmitter RF Receiver Power Conversion Outdoor Unit (Buoy) Indoor Unit (Display) Eric – Green Paul - Yellow Murtadha – Orange Steve – Light Blue Nole – Red Tom – Dark Blue Data Lines Wireless Link Power Lines

  9. System Level RequirementsPerformance Requirements

  10. System Level RequirementsStandard Requirements

  11. System Level RequirementsStandard Requirements

  12. System Level RequirementsStandard Requirements

  13. Safety Standards • UL 458 - Power Converters/Inverters and Power Converter/Inverter Systems for Land Vehicles and Marine Crafts • UL 1196 - Standard for Safety for Floating Water Lights • 61010-1 - Electrical Equipment For Measurement, Control, and Laboratory Use • ISO 14000- Environmental Safety Standard • ISO 9001- Quality Insurance Standard

  14. Display Power Paul Simons

  15. Block Diagram Solar Recharging Battery Water & Air Temperature Sensor Pressure Sensor Wind Speed Sensor Power Conversion Circuits Microprocessor Microprocessor And Display Light Controller RF Transmitter RF Receiver Power Conversion Outdoor Unit (Buoy) Indoor Unit (Display) Data Lines Wireless Link Power Lines

  16. To convert 120VAC to 5VDC To distribute power to the RF Receiver, the MPU, buffers and LED displays. Display Power Functional Purpose

  17. Display PowerBlock Diagram 120VAC To 5VDC Wall Adapter Display Unit RF Receiver MPU Power Line Data Line

  18. Display PowerRequirements

  19. Display PowerElectrical Interface

  20. Display PowerDetailed Design Calculation Max Load Current vs. Max Tansformer Output Current Load Max Current Draw Receiver 15mA CPU 4mA LED Displays 240mA Total 259mA (<550mA)

  21. Display Power Detailed Design DFM Analysis Plan The results of the analysis have shown the output ratings were within 5%, the output current was acceptable, and the ripple voltage was within spec.

  22. Display PowerVerification of Requirements

  23. Display PowerAssembly and Testing • Test to ensure 5V output and 550mA. • Solder leads from wall transformer to Toggle Switch found on PCB.

  24. Display Power Bill of Materials

  25. Display PowerVender Requirements To ensure buoy reliability and sustainability, the manufacturer of the wall transformer must: • Participate in ISO 9001 quality standards • Provide proof of EMC Standards are met • IEC/CISPR14-1  Household Appliances

  26. Block #1: The Power Block Murtadha B Tunis 1

  27. Block Diagram Solar Recharging Battery Water & Air Temperature Sensor Pressure Sensor Wind Speed Sensor 4 6 5 1 Power Conversion Circuits Microprocessor Microprocessor And Display 2 3 10 Light Controller RF Transmitter RF Receiver Power Conversion Circuits 7 9 8 11 Outdoor Unit (Buoy) Indoor Unit (Display) Data Lines Wireless Link Power Lines

  28. Functional Purpose To receive Infra red rays from the sun to charge the solar panels To regulate the voltage for the charging circuit To recharge the available power for the battery To output the required regulated voltage for the power conversion circuit

  29. Standard Requirements

  30. Battery Life 15 years Battery Type 12V battery Rated Capacity < 84AH Supply voltage 12Vdc ± 3% Supply current <50mA Solar Panel <16.5V Performance Requirements

  31. Electrical Interface signals

  32. Block Interface Infra-Red Rays SUN Voltage Regulator Solar Panel Detail Design of Charging Circuit Voltage Regulator Power Conversion Circuit

  33. Initial Design

  34. Detail Design

  35. Where R1 = 1.0K R2 = 1.2K

  36. Voltage Regulator Calculation where Vref = 1.25V Iadj is typically 50uA

  37. Worst case Max: Min:

  38. Solar Panel I-V Curves

  39. Solar Panel Specification

  40. Daily Energy Consumption Calculations Amps for battery From sensors/ Transmitter/CPU From sensors/ Transmitter/CPU Total Amp hour/day = 0.1006 A-hr/day

  41. A rough rule of thumb gives battery capacity in terms of the number of days of storage required for different latitudes Latitude Days storage 0º - 30º 5-10 30º - 40º 10-15 40º - 50º 15-20 50º+ 20 + Battery Capacity calculation

  42. Latitudinal Values in State of Wisconsin

  43. The actual battery capacity required is the number of days storage multiplied by the daily load of the system Lat. Of Milwaukee is 42.950N 15 days * 0.1006A-hrs/day = 1.509 AH battery capacity. Battery capacity calculation

  44. Wisconsin Solar Access Laws Authority 1:Wis. Stat. § 66.0401 Effective Date:  1/1/81 Authority 2:Wis. Stat. § 66.0403 Authority 3:Wis. Stat. § 236.292 Summary:Wisconsin law allows property owners with wind or solar-energy systems to apply for permits guaranteeing unobstructed access to solar and wind resources. A permit may not be granted if an obstruction already exists or if the construction of such an obstruction is well into the planning stages. In addition, a separate provision voids any restrictions on platted land that prevent or unduly restrict the construction and operation of solar-energy systems or wind-energy systems. Contact: Paul Helgeson Public Service Commission of Wisconsin 610 North Whitney Way P.O. Box 7854 Madison, WI 53707-7854 Phone: (608) 266-3905 Fax: (608) 266-3957

  45. Reliability

  46. Summary Slides for Reliability • As shown, the solar panel and the 12V batteries would • fall at the buttom of the reliability chart, followed by the • comparator. This could be overcome by selecting for • wider voltage and current ratings.