1 / 10

Project Manager, Responsibilities and Tasks Coordination between groups within the TDP

Project Manager, Responsibilities and Tasks Coordination between groups within the TDP Promote and facilitate communication among separated groups Assist coordination between TDP and PrepSKA Promote collaboration between TDP and other research groups Develop project planning documentation

lamont
Download Presentation

Project Manager, Responsibilities and Tasks Coordination between groups within the TDP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Manager, Responsibilities and Tasks • Coordination between groups within the TDP • Promote and facilitate communication among separated groups • Assist coordination between TDP and PrepSKA • Promote collaboration between TDP and other research groups • Develop project planning documentation • Assist with reporting requirements to the NSF, PrepSKA, others • Provide a central repository for reports & minutes, web based • Oversight of budgets, schedules, project performance • Engineering responsibilities, especially antennas Lynn Baker USSKA Consortia Meeting Washington, DC

  2. Direct TDP Funding: Caltech Cornell/NAIC MIT/Haystack SETI Institute U.C. Berkeley U. Illinois Management: Cornell/NAIC US SKA Consortium In-kind participation: JPL NRL NRAO U. New Mexico ATNF DRAO U. Calgary South Africa TDP Participation (to date) Lynn Baker USSKA Consortia Meeting Washington, DC

  3. TDP Antennas Working Group • Jack Welch (UCB) Chair • Matt Fleming (Minex/SI) • German Cortes (Cornell) • Dean Chalmers (DRAO) • Bill Imbriale (JPL) • Roger Norrod (NRAO) • Roger Schultz (Schultz Associates) • Sandy Weinreb (Caltech) • External: • Dave de Boer (ATNF/ASKAP) • Peter Dewdney (DRAO/SPDO) • Justin Jonas (MeerKAT) or proxy Lynn Baker USSKA Consortia Meeting Washington, DC

  4. TDP Calibration and Processing Group • Athol Kemball (UI, Chair) • Geoff Bower (UCB) • Jim Cordes (Cornell) • Joe Lazio (NRL) • Colin Lonsdale (MIT/Haystack) • Steve Myers (NRAO) • Joeren Stil (U. Calgary) • Greg Taylor (UNM) Lynn Baker USSKA Consortia Meeting Washington, DC

  5. Technological Interactions Pathfinders TDP Project PrepSKA AWG CPG Lynn Baker USSKA Consortia Meeting Washington, DC

  6. Interaction between AWG and CPG • Science data products result from CPG modeled algorithms • CPG results define the required antenna specifications • AWG provides feasibility and cost models of specifications • Rescoping of science goals leads to multiple antenna options • Early AWG work will focus on low cost design and fabrication Lynn Baker USSKA Consortia Meeting Washington, DC

  7. AWG Major Objectives • Fabrication methods and designs to provide low cost antennas • Cost modeling of antennas to estimate optimum parameters • Provide broadband feeds and low noise receivers • AWG Work Blocks • Reflector fabrication techniques, especially hydroforming • Antenna mounts, structural support of reflectors • Analysis of environmental effects, solar, gravitation, wind, climate • Reflector optical designs to achieve specifications • Cost modeling of antennas • Broadband feeds, potentially 10:1 bandwidth • Low noise amplifiers matched to feeds Lynn Baker USSKA Consortia Meeting Washington, DC

  8. CPG Major Objectives • Feasibility of calibration and processing meeting science goals • Cost modeling WRT array and antenna parameters • Provide antenna specifications to AWG • Demonstrate algorithms on pathfinder data • Liaison with other calibration and processing groups • CPG Work Blocks • Signal transport • Calibration algorithms • Imaging, spectroscopy, time domain imaging • Scalability and high performance computing Lynn Baker USSKA Consortia Meeting Washington, DC

  9. AWG Meeting, March 2008 First meeting of the AWG and associated experts • Extended presentations from four pathfinder projects • Presentations on composite and hydroformed fabrication • Presentations on low noise receivers and broadband feeds • Presentations on reflector optics designs and tradeoffs • Conclusions from the meeting included in the AWG work plan • CPG Organizational Meetings, March & May 2008 • Discussions of goals, work plans and required staffing • Status of recruitment for project Lynn Baker USSKA Consortia Meeting Washington, DC

  10. TDP Web Pages TDP/AWG URL: http://skatdp.astro.cornell.edu/ • CPG URL: http://rai.ncsa.uiuc.edu/SKA/RAI_Projects_SKA_CPG.html Lynn Baker USSKA Consortia Meeting Washington, DC

More Related