Update on daq
Download
1 / 4

Update on DAQ - PowerPoint PPT Presentation


  • 79 Views
  • Uploaded on

Update on DAQ. Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006. DAQ setups for the TPC. RCU Lab (epaitbeam02): 2 DDLs, 1 D-RORC, integration: RCU, SIU, Trigger, DATE, HLT, ECS SXL2 (pcald23): 1 DDL, 1 D-RORC, checks for installation, RORC utilities, LabView

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Update on DAQ ' - lael


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Update on daq

Update on DAQ

Klaus Schossmaier

CERN PH-AID

ALICE TPC Meeting

21 April 2006


Daq setups for the tpc
DAQ setups for the TPC

  • RCU Lab (epaitbeam02):

    • 2 DDLs, 1 D-RORC, integration: RCU, SIU, Trigger, DATE, HLT, ECS

  • SXL2 (pcald23):

    • 1 DDL, 1 D-RORC, checks for installation, RORC utilities, LabView

  • SXL2 (aldaqpc021):

    • 1 DDL, 1 D-RORC, TPC electronics characterization, RORC utilities, LabView

  • Hall 167 (pcalicetpc167):

    • 2 DDLs, 1 D-RORC, TPC prototype with cosmics

  • PX24/CR1 and SXL2 for commissioning

    • 108 final SIUs have been given to Luciano

    • Patch cords (14x 40m and 10x 60m E2000-LC) for SXL2 are available

    • 2 Linux PCs for operating the DAQ/ECS have been placed in the clean room

ALICE TPC meeting, 21 April 2006


Planned daq setup
Planned DAQ Setup

PC

SXL2

RCU

RCU

6x

6x

PC

SIU

SIU

(runControl)

6x DDL

6x DDL

HLT Farm

PX24/CR2

General Purpose Network (GPN)

6x DDL

6x DRORC

6x DRORC

DRORC

LDC

LDC

LDC

Event Building Network (Gigabit Ethernet)

PX24/CR1

Server

GDC

Gateway

(DATE, ECS)

TDS

2 TB Disk array (RAID 5)

ALICE TPC meeting, 21 April 2006


Milestones
Milestones !!!

  • LHCC Milestones

    • Combined TRG/DAQ/HLT with the TPC

    • 450 (May06): running mode A+B

    • 451 (Jun06): running mode A+B+C

  • Work to be done

    • Maintaining the DAQ setups

    • Continuing the installations of machinery in CR1

    • DATE v5.15 installation/configuration

    • ECS v2.7 installation/configuration

    • Integration DAQ/Trigger/HLT/ECS

    • Implementation of the different calibration runs

    • Participation in data quality monitoring (MOOD)

    • Participation in the RCU configuration via DDL

    • Scheme to capture RCU  DDL  equipmentId

ALICE TPC meeting, 21 April 2006


ad