Capacity to Customer (C 2 C) Update. ENA 2012 Low Carbon Network Fund Conference 26 October 2012. Electricity North West . Licensed distribution network operator in NW England Area: 12,500 square kilometres Key network asset statistics; 13,000 km of overhead lines

Download Presentation

Capacity to Customer (C 2 C) Update

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Capacity to customer c 2 c update

Capacity to Customer (C2C) Update

ENA 2012 Low Carbon Network Fund Conference

26 October 2012


Electricity north west

Electricity North West

  • Licensed distribution network operator in NW England

  • Area: 12,500 square kilometres

  • Key network asset statistics;

    • 13,000 km of overhead lines

    • 44,000 km of underground cables

    • 84,000 items of switchgear

    • 34,000 transformers

  • Customer base: 2.3 million

  • Deliver over 25 TWh pa


What is capacity to customers

What is Capacity to Customers?

Technical Innovation

New Commercial Contracts

Capacity to Customers

Total available network capacity

Total available network capacity

Combining proven technology and new commercial contracts

Allows ENWL to release significant network capacity back to customers

Facilitating connection of new demand and generation without reinforcement

Apply remote control equipment to the HV circuit and close the normal open point

Enhance network management software

This effectively doubles the available capacity of the circuit negating the need for traditional reinforcement

To retain customers’ security of supply we will utilise innovative demand side response contracts

These contracts will allow ENWL to control the consumption of customers on a circuit at the time of fault


Standard 11kv network configuration

Standard 11kV Network Configuration

33/11kV

11kV Primary busbar

X

X

X

NOP

Load point

NOP

NOP


C 2 c network configuration

C2C Network Configuration

33/11kV

11kV Primary busbar

X

X

X

X

Managed Load

A

A

A

NOP

A

A

NOP


Monitoring the effect of the trial

Monitoring the effect of the trial

  • We have partnered with the University of Manchester and the University of Strathclyde

  • Strathclyde Scope of Works includes;

    • Power System Modelling & Simulation – To inform the hypothesis that ‘C2C method will reduce like-for-like power losses initially but this benefit will gradually be eroded as newly released capacity is utilised’ and ‘C2C method will improve power quality’

  • Manchester Scope of Works includes;

    • Carbon Impact Assessment – To inform the hypothesis ‘C2C method will facilitate a reduction in the carbon costs of network reinforcement’

    • Economic Benefit Analysis - To inform the hypothesis that ‘C2C will facilitate lower reinforcement costs for customers for the connection of a new loads and generation’ and to also consider the wider impacts on both customer and network operator’s business models.


Project timeline

Project Timeline

Project startup 

Software design 

Circuit selection and methodology 

Customer engagement plans & survey 

New commercial templates and processes

Software user acceptance testing

Equipment installation & commisioning

Trial ‘go live’

Recruit trial participants

Carbon, economic & losses impact assessments

Continously engage customers & stakeholders

Closedown report & closure

2012

Q4 2014

2013/14

Learning & knowledge sharing

Build & trial

Design

Closure


Contact info

Contact info

For further information please contact:

Craig McNicol

[email protected]