Tdc2 tcc2 consolidation status report to eatm
Download
1 / 8

TDC2-TCC2 consolidation status report to EATM - PowerPoint PPT Presentation


  • 93 Views
  • Uploaded on

TDC2-TCC2 consolidation status report to EATM. 10 .12.2013 In sharepoint : https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/. 2013 planning. Goal end 2013: 6 hot items out of the way. Removal of hot items. Removal of hot items from the worksites:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' TDC2-TCC2 consolidation status report to EATM' - lacy


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Tdc2 tcc2 consolidation status report to eatm

TDC2-TCC2 consolidationstatus report to EATM

10.12.2013

In sharepoint: https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/


2013 planning
2013 planning

Goal end 2013: 6 hot items out of the way.


Removal of hot items
Removal of hot items

  • Removal of hot items from the worksites:

    • TCSC removed first and brought to B.955

    • 3 splitter2 magnets and 2 MDLV removed and stored in TDC2


Removal of hot items1
Removal of hot items

3 splitter2 magnets

2 MDLV magnets





2014 planning
2014 Planning