Connection to Plant bus. PS 2: Question 6 How do the first IEC61850-based technical solution differ?. The first running substations are turnkey projects. Typical system. Example: Garzweiler II

Download Presentation

PS 2: Question 6 How do the first IEC61850-based technical solution differ?

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ps 2 question 6 how do the first iec61850 based technical solution differ

Connection to Plant bus

PS 2: Question 6How do the first IEC61850-based technical solution differ?

  • The first running substations are turnkey projects.

Typical system

Example: Garzweiler II

  • Station bus for three voltage levels:110kV – Section (HSA) 25/6 kV- Section (HSA) 6kV – Section (BSP)

  • Over 140 Protection and Bay Units.7SJ63, 7SJ64, 6MD66 and 7SJ62: IEC61850 7UT6: IEC60870-5-103

  • Connection to tap-change and Petersen-coil regulator using IEC61850

  • High Availability due to automatic ring management using intelligent switch modules

general indications

Station bus IEC61850 FO-Ring with ring management

Serial Hub

Connection toBay Units usingIEC61850

Connection toBay units using IEC60870-5-103

Switchgear

IEC61850 - RJ45

IEC61850 – optical fiber


Pilot project rwe rheinbraun garzweiler ii control room

Control Centre

Pilot project: RWE Rheinbraun – Garzweiler II – Control room

remote HMI (Net Meeting)

  • SICAM PAS-System, consisting of: Full server 2xDIP (Device Interface Processor) SICAM PAS CC remote Control PC Mobile Control PC

  • Bay controller via IEC61850 IEC 60870-5-103

  • Substation connection IEC60870-5-101

  • Control center connection IEC 60870-5-101

  • Notebook as mobile Control PC useful at every switch.

local HMISICAM PASCC

IEC60870-5-101

SICAM PAS

FS

DIP

10 km

DIP

Transformer monitoring

4 times IEC 101

IEC61850 bus FO-Ring with ring management

Connection Station bus110kV HSA

Connection Station bus6kV BSP

Connection to Station bus25/6kV HSA

MobileControl-PC

IEC61850 - RJ45

IEC61850 – optical fiber

IEC 60870-5-xxx- Cu


Pilot project vw salzgitter control room

Pilot project: VW SalzgitterControl room

local HMI SICAM PAS CC

IEC61850 / IEC60870-5-103

Hall 1

IEC 61850

IEC 103/ RS485

SICAM PAS

1 … 5

Switchgear

Hall 2

Connection to Corporate Network

Hall 3

Hall 4

generalstation indications

Central heating

Ethernet TCP/IP

IEC61850 / IEC60870-5-103

Station bus to production sections

IEC61850 - RJ45

IEC61850 – optical fiber

IEC 60870-5-103- Cu


Pilot project vw salzgitter 20 kv switchgear

Pilot project: VW Salzgitter- 20 kV switchgear

Switchgear 20kV 3 sections with 12 feeders each

Bay Units 6MD63/7SJ63 using IEC 61850

Protection Units 7SD61 using IEC 103

Due to short distances, a RS485 copper connection is used

Connection to plant busapprox. 20 m

Station bus IEC61850twisted-pair cable ring

IEC61850

SerialHub

IEC 103/ RS485

1 … 12

Switchgear Section 1

section 2

section 3

IEC61850 - RJ45

IEC61850 – optical fiber

IEC 60870-5-103- Cu