Renewable energy in ireland greenstar network mantychore 2012
This presentation is the property of its rightful owner.
Sponsored Links
1 / 13

Renewable Energy in Ireland Greenstar Network, Mantychore 2012 PowerPoint PPT Presentation


  • 85 Views
  • Uploaded on
  • Presentation posted in: General

Renewable Energy in Ireland Greenstar Network, Mantychore 2012. Andrew Mackarel, HEAnet for GEANT NA3-T3 Workshop 2012. Agenda. Quick overview of changing environment Rational Background to investigating Renewable Energy Technologies Greenstar Mantychore Questions and Answers.

Download Presentation

Renewable Energy in Ireland Greenstar Network, Mantychore 2012

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Renewable energy in ireland greenstar network mantychore 2012

Renewable Energy in Ireland Greenstar Network, Mantychore2012

Andrew Mackarel, HEAnet

for

GEANT NA3-T3 Workshop 2012


Agenda

Agenda

  • Quick overview of changing environment

  • Rational Background to investigating Renewable Energy Technologies

  • Greenstar

  • Mantychore

  • Questions and Answers


Changes in ghg emissions source unfccc

Changes in GHG emissions(source: UNFCCC)


European and irish wind resource

European and Irish Wind Resource

Average PoP 6KW

11KW Windmill at 15m Height

Area size 20m by 20m

Cost approx 50k Euros

Payback 8-10 Years at full load

14-16 Years for Normal PoP

Battery and Inverter facility needed


Wind power installations in europe 2010

Wind Power Installations in Europe 2010

2010 84 Gw Europe, 194Gw World


Wind generation targets for 2020

Wind Generation targets for 2020

National Wind Generation targets introduces

new challenges for Power Generators and NRENS


Ireland s annual solar resource kwh m2 per year

Ireland’s Annual Solar Resource(kWh/m2 per year)

Annual Solar Energy on 1m2

surface at 30 degree inclination

900 KWh/m2 – 1200 KWh/m2

Average PoP 6KW => approx 50 Solar Panels

Area size 20m by 20m

Cost approx 50k Euros

Payback 20 - 30 Years

Battery and Inverter facility needed


Renewable energy in ireland greenstar network mantychore 2012

The GreenStar Network Map

Green Star consortium universities , data centres

and renewable power generators


Gsn architecture

GSN Architecture

Firmware Intelligence

Device level Interface

  • Follow the Sun/Follow the Wind

    • Optimize distribution of VMs according to availability of intermittently available green power


Renewable energy in ireland greenstar network mantychore 2012

  • On demand provisioning of network resources.

  • Recursive delegation of access right over managed resources.

  • Lightweight Abstracted operational model.

    • Decoupled from actual vendor-specific details.

    • Flexible enough to accomodate different designs and orientations

    • Fixed enough so common tools can be build and reused across plugins.

      • Security

      • Lifecycle

      • Monitoring

      • Deployment and upgrade.


Service integration test case

   Service integration Test Case

  • Mantychore/GSN use case

    • “As a GSN administrator, I want to provision a tunnel between my cloud and a remote cloud for VM migration”

  • Draft API and messaging

class Universe {

    Cloud myCloud

    Vector<Clouds> remoteClouds

}

class Cloud {

    String id;

    String gatewayIP;

    String location;

    Vector<String> hostIPs;

}

pubic String tunnelUp(String cloudId, String targetHostIP) throws SomeException {

    Cloud cloud = remoteClouds.getCloud(cloudId);

    String targetGatewayIP = cloud.getGateway(hostIP);

    String connectionID = mantychoreWrapper.setupConnection(myCloud.getSourceGatewayIP(), targetGatewayIP)

    return connectionID.

}

public void tunnelDown(String connectionId) throws SomeException {

mantycoreWrapper.teardownConnection(connectionId);

}


Network integration 2012

   Network integration 2012

  • Current network status

    • Connectivity to CANARIE/GSN via private routed networks

    • Irish sites at EPA and DKIT and New Euro GSN Hub servers

    • Nordunet , i2CAT

      • 3 Logical Routers in Canada, Ireland and Iceland

      • aligned for Mantychore provisioning


Renewable energy in ireland greenstar network mantychore 2012

Questions

and

Answers

Thank You


  • Login