Dispatch Reliability Status EMBRAER 170/175. March 2006. Contents. Fleet Summary Dispatch Reliability Operational Performance Project Conclusion. Contents. Fleet Summary Dispatch Reliability Operational Performance Project Conclusion. Embraer 170/175 - Aircraft In Service. Airline.

Download Presentation

Dispatch Reliability Status EMBRAER 170/175

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Dispatch Reliability StatusEMBRAER 170/175

March 2006


Contents

  • Fleet Summary

  • Dispatch Reliability

  • Operational Performance Project

  • Conclusion


Contents

  • Fleet Summary

  • Dispatch Reliability

  • Operational Performance Project

  • Conclusion


Embraer 170/175 - Aircraft In Service

Airline

EIS

A/C in Service

Acc. FH

Lot Polish

March 17, 2004

10

37,353

US Airways

April 04, 2004

12

54,182

19,263

Alitalia

April 26, 2004

6

127,226

Republic Holdings

October 22, 2004

54

Cirrus Airlines

January 15, 2005

1

1,824

12,455

AIR CANADA

July 27, 2005

15

3

Hong Kong Express

September 08, 2005

2,916

FINNAIR

October 01, 2005

5

3,189

Paramount

October 19, 2005

1

2,089

Saudi Arabian Airlines

February 01, 2006

4

905

E 170/175

March 17, 2004

111

261,402

Source: Airlines (as of Mar 17th 2006)

EI 19/JJan/06


Embraer 170/175 - Statistics


Contents

  • Fleet Summary

  • Dispatch Reliability

  • Operational Performance Project

  • Conclusion


Embraer 170/175 Dispatch Reliability

Worldwide

Europe

(*) Monthly. Ref. date: Mar 15th, 2006


Contents

  • Fleet Summary

  • Dispatch Reliability Diagnosis

  • Operational Performance Project

  • Conclusion


Operational Performance Project

  • Objective:

  • Improvement of Embraer 170/190 fleet and customer operational performance

  • Organization:

  • Creation of senior teams in different areas to address Embraer 170/190 operational issues

  • Assignment of dedicated in-house customer focal points at Embraer to address each Customer’s needs (ECAMs)

  • Embraer high level management deep involvement


Reliability Diagnosis

Spare Parts

Availability

Product Technical

Issues

Specific Operators

Environment


Operational Performance Project

  • Expected Short Term Results:

  • Increase of Embraer 170/190 dispatch reliability

  • Improve lead times for product correction (solution / implementation)

  • Guarantee effective (basic and peculiarities) training for customer operational personnel

  • Assure spare parts availability (Embraer / Supplier) for the Embraer 170/190 operation without interruptions

  • Closer and accurate communication between Embraer and Customer in all organization levels

  • Focus on each operator with solutions and actions tailored to its particular needs


E170/175 Dispatch Reliability Status

2005

2006

(as of Mar 15th, 2006)


E170/175 Dispatch Reliability Status

2006

2005

(as of Mar 15th, 2006)


Dispatch Reliability Status

(as of Mar 23th, 2006)


Dispatch Reliability Status

(as of Mar 23th, 2006)


Contents

  • Operational Summary

  • Dispatch Reliability Diagnosis

  • Improvement Actions

  • Conclusion


Conclusion

EMBRAER acknowledges that the Embraer 170/175 are performing below expectations. However:

  • WW Fleet Schedule Reliability has been improving continuously.

  • Completion Rate is already high, on par with industry standards.

  • The solutions already provided have been effective, quick and with reduced impact to airline’s operation.

  • Solution packages already being developed by EMBRAER will be available in the coming months, increasing Schedule Reliability to required levels.

  • Spare Parts availability issues are identified and being corrected.