1 / 30

Managing the Local Government Transport Infrastructure Gap

Managing the Local Government Transport Infrastructure Gap. Warren Sharpe DIRECTOR INFRASTRUCTURE SERVICES SEATS Meeting - 18 May 2012. Managing the Local Government Transport Infrastructure Gap. Overview. The State and National context Eurobodalla – an example.

kylia
Download Presentation

Managing the Local Government Transport Infrastructure Gap

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Managing the Local Government Transport Infrastructure Gap Warren Sharpe DIRECTOR INFRASTRUCTURE SERVICES SEATS Meeting - 18 May 2012

  2. Managing the Local Government Transport Infrastructure Gap Overview • The State and National context • Eurobodalla – an example

  3. Managing the Local Government Transport Infrastructure Gap The State and National context • Freight predicted to double in next 20 years • Increased demand managed in part by higher productivity vehicles • Poor links between productivity gains to industry ($30B pa) and road funding

  4. Managing the Local Government Transport Infrastructure Gap • Over 80% of road managed by Local Government • Infrastructure renewal gap on LG roads • NSW $667M pa (2010) => double current funding levels • Australia $1.2-2.6B pa (2011) • Figures don’t include infrastructure upgrades to cater for growth The State and National context

  5. Managing the Local Government Transport Infrastructure Gap • NSW Roads & Transport Directorate about to survey all NSW Councils in 2012 Road Asset Benchmarking Report • Infrastructure upgrades to cater for growth will be included in the survey • Australian Government also looking to undertake similar research The State & National context

  6. Managing the Local Government Transport Infrastructure Gap • Transport assets – replacement value $600M and depreciable amount of $400M • Regional roads – 57.6km • Urban roads – 312km • Rural sealed roads – 214km • Unsealed roads – 433km • Concrete/composite bridges – 23 • Timber bridges – 38 • Footbridges - 27 • Footpaths – 60km • Shared pathways – 30km Eurobodalla – An Example

  7. Managing the Local Government Transport Infrastructure Gap • Sealed road pavement age profile Eurobodalla – An Example

  8. Managing the Local Government Transport Infrastructure Gap • Rainfall impacts – average 970mm pa Eurobodalla – An Example

  9. Managing the Local Government Transport Infrastructure Gap • Transport assets – key issues • Return to average wet seasons • Cost increases, including contracted work, outstripping rate pegging • Bridges – some in poor condition – no assessment on ability to take higher loads • Urban roads built in 60s, 70s and 80s without adequate drainage, kerb or good pavements • Legal commitment to reconstruct and seal another 16.2km of S94 rural unsealed roads Eurobodalla – An Example

  10. Managing the Local Government Transport Infrastructure Gap • Transport assets – key issues • Significant network deficiencies (e.g. lack of protective fencing, roadside hazards, inadequate road width) – Civil Liability Act 2002 • Only 17% of urban roads have a footpath on one side – ageing population • Limited public transport facilities • Increasing costs and delays to do work (e.g. environmental approval processes, WHS systems, stakeholder engagement) Eurobodalla – An Example

  11. Managing the Local Government Transport Infrastructure Gap • Transport assets – key issues • Significant backlog of renewal work - $20M • Significant and growing annual renewal gap - $3.4M pa and increasing • Growth in assets base due to development • Capacity issues on Beach Road and at junctions due to growth in traffic from increased visitation, economic growth and new subdivisions • Need to provide South Batemans Bay Link Road to service Surf Beach employment lands Eurobodalla – An Example

  12. Managing the Local Government Transport Infrastructure Gap • Bitumen seal - condition 5 – beyond useful life Eurobodalla – An Example

  13. Managing the Local Government Transport Infrastructure Gap • Urban pavements not built for modern garbage trucks and suffering due to poor condition storm water systems Eurobodalla – An Example

  14. Managing the Local Government Transport Infrastructure Gap • Timber bridge - condition 4 elements Eurobodalla – An Example

  15. Managing the Local Government Transport Infrastructure Gap • Transport assets – existing management strategies • Councillor workshops to determine what roads will be maintained by Council • Defined LOS for maintenance and policies to manage risk • Creation of Infrastructure Fund – ring fenced for renewal work – best decision! • Allocation of substantial component of R2R to road renewal instead of capital works • Focus on resurfacing of sealed roads to protect road pavements Eurobodalla – An Example

  16. Managing the Local Government Transport Infrastructure Gap • Transport assets – existing management strategies • Strong policy support for required asset standards before Council will accept road infrastructure • Reconstruction and sealing of unsealed roads limited to S94 rural roads only • Gravel re-sheet program based on hierarchy • New specification and standards for gravel • re-sheet material and maintenance grading Eurobodalla – An Example

  17. Managing the Local Government Transport Infrastructure Gap • Transport assets – existing management strategies • Loan funded timber bridge replacement • (12 structures) and concrete bridge refurbishment (4 structures) program for identified bridges • Significantly increased funding for pathway construction (based on Shire wide Pathway Strategy) • Better management of asset data to improve knowledge of infrastructure under our care • Higher standards of construction (e.g. 40 year pavement life, higher quality of materials) Eurobodalla – An Example

  18. Managing the Local Government Transport Infrastructure Gap • Transport assets – existing management strategies Eurobodalla – An Example

  19. Managing the Local Government Transport Infrastructure Gap • Transport assets – existing management strategies Eurobodalla – An Example

  20. Managing the Local Government Transport Infrastructure Gap • Road seal profile Eurobodalla – An Example

  21. Managing the Local Government Transport Infrastructure Gap • Transport assets – existing management strategies Eurobodalla – An Example

  22. Managing the Local Government Transport Infrastructure Gap • Transport assets – existing management strategies Eurobodalla – An Example

  23. Managing the Local Government Transport Infrastructure Gap • Customer feedback – 87% rank roads as a high priority Eurobodalla – An Example

  24. Managing the Local Government Transport Infrastructure Gap • Depreciation c.f. projected renewal expenditure Eurobodalla – An Example

  25. Managing the Local Government Transport Infrastructure Gap • Capital works to keep pace with growth • $60M over next 20 years • How do we fund that? • Loans • FAG road component (after Section Rural Roads program is complete) • Developer contributions/works • Grants – program cannot be achieved without substantial grants (e.g. South Batemans Bay Link Road) Eurobodalla – An Example

  26. Managing the Local Government Transport Infrastructure Gap • Transport assets – future management strategies • Continue to refocus maintenance on pro-active measures to protect the pavement/asset • From 1 July 2014, allocate all R2R to road renewal and reduce capital program • Focus on sustainable levels of resurfacing and bridge renewal • Increase pavement rehabilitation/upgrade funding including upgrading old urban streets on a priority basis • From 1 July 2014 increase funding for treatment of network deficiencies (e.g. sealing of shoulders, lack of protective fencing) Eurobodalla – An Example

  27. Managing the Local Government Transport Infrastructure Gap • Transport assets – future management strategies • Continue pathways construction program actively pursuing other funding avenues (e.g. Federal/State grants) • Improve and implement on-going condition assessment of sealed roads and culverts • Gather data on ancillary assets (e.g. protective fencing, signage, etc.) • Focus on quality outcomes with an eye on ‘whole of life’ and longer term planning to optimise outcomes Eurobodalla – An Example

  28. Managing the Local Government Transport Infrastructure Gap • Transport assets – future management strategies • Provide for urban consolidation within the new LEP to better utilise existing infrastructure • Implement new Section 94 developer contributions plans • Undertake service level reviews • Direct $8/$10 rate dollars from future growth to infrastructure renewal • Optimise/consolidate other infrastructure and services based on the communities needs and preparedness to pay including consideration of special rate variations Eurobodalla – An Example

  29. Managing the Local Government Transport Infrastructure Gap • Transport assets – future management strategies • Partner with others to pursue • constitutional recognition of LG • sustainable government funding support to LG • reduced levels of cost shifting to LG • capacity building of our people • more research into sustaining low trafficked roads and cost effective renewal treatments • analysis of the impacts of climate change and development effective adaptation strategies Eurobodalla – An Example

  30. Managing the Local Government Transport Infrastructure Gap Warren Sharpe DIRECTOR INFRASTRUCTURE SERVICES SEATS Meeting - 18 May, 2012

More Related