A SEMINAR ON

A SEMINAR ON. Fabric form concrete and paraweb system. PREPARED BY : Zankar SD 0910. What is fabric form concrete?. Filling fabric form panels with fine aggregate concrete. Filtering points reduce the chance of system failure due to uplift pressures.

kvaughn
Download Presentation

A SEMINAR ON

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A SEMINAR ON Fabric form concrete and paraweb system PREPARED BY : Zankar SD 0910

  2. What is fabric form concrete?

  3. Filling fabric form panels with fine aggregate concrete

  4. Filtering points reduce the chance of system failure due to uplift pressures. Specially woven filtering areas reduce uplift pressures.

  5. The fabric used in the forms allows excess mixing water to escape while retaining the cement solids. Chemically inert and resistance to any hazardous chemicals. These fabric forms are free of any hazardous projections. Fabric-formed concrete has low environmental impact.

  6. Fabric forms adapt to soil contours during installation.

  7. Different fabric form pattern for different environmental conditions • Uniform Section • Fabric form withfilter point • High strength fabric form • Fabric form with empty spaces • For development of natural • vegetation • Specially pattern for • controlling run off

  8. PARA WEB SOIL RETENTION SYSTEM & IT’S COMPONENTS

  9. EXCAVATION & FOUNDATION CONSTRUCTION • MINIMUM DEPTH OF FOUNDATION 800 MM • MINIMUM M20 GRADE OF CONCRETE • CURING SHOULD BE DONE FOR 7 DAYS MIN • SHAPE OF FOUNDATION DEPENDS UPON TOPOGRAPHY

  10. INSTALLATION GRADING LIMITS OF BACKFILL SOIL

  11. BENEFITS

  12. THANK YOU