1 / 16

NATIONAL HYDROLOGY PROJECT . 1 ST WORLD BANK MISSION ODISHA- GROUND WATER 22-23 August 2017

NATIONAL HYDROLOGY PROJECT . 1 ST WORLD BANK MISSION ODISHA- GROUND WATER 22-23 August 2017 BHUBANESWAR. DETAILS OF SPMU (IN POSITION),STAFF STRENGTH ETC. SPMU Odisha has been formed vide notification no. 13675/WR dt. 10/06/2016 of DoWR, GoVT of Odisha. SPMU structure :-

ktribble
Download Presentation

NATIONAL HYDROLOGY PROJECT . 1 ST WORLD BANK MISSION ODISHA- GROUND WATER 22-23 August 2017

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NATIONAL HYDROLOGY PROJECT. 1ST WORLD BANK MISSION ODISHA- GROUND WATER 22-23 August 2017 BHUBANESWAR

  2. DETAILS OF SPMU (IN POSITION),STAFF STRENGTH ETC. • SPMU Odisha has been formed vide notification no. 13675/WR dt. 10/06/2016 of DoWR, GoVT of Odisha. • SPMU structure :- • 1.Project Coordinator; EIC(P & D),WR • 2.Project Director(NHP): Director, Costal Protection & River Training, BBSR. • 3.Nodal Officer(SW): Director Hydrometry, BBSR. • 4. Nodal Officer(GW): Supdt. Engineer,GWD,BBSR. • PMU-OdishaGW has been constituted by the Project Coordinator(NHP Odisha) • Vide order no. 28335 dt. 06/08/2016. • PMU[Odisha GW) Structure: • 1.B.R. Padhee,SE, -Nodal Officer,Odisha-GW. • 2.Er. Anup K. Das,EE -Hydrologist. • 3.Er. S.K. Pattnaik AEE(C) -Hydromet Instrumentation Expert. • 4.Sri B.K. Sahoo,Geologist -Hydrogeologist. • 5.Er. Suparna Nayak,AEE(M) -Procurement specialist. • 6.Sri B.P.Padhee,Geologist -GIS Expert. • All are in position at present and working in addition to their routine responsibility. Moreover,this Directorate has suggested to appoint the following categories of manpower to work in PMU cell(Odisha-GW). a) Asst. Accountant-1 no.; b) Comp. Operator cum-Office Assistant-2 nos. c) Security Guard-1 no.; d) Office Attendant for PMU cell-1 no. Besides,the field Divisions have requested to engage security personel and office assistants for their Divisions which will be submitted to the higher authority for approval.

  3. FUNDS RECEIVED(2016-17),(2017-18) & EXPENDITURE TILL DATE YEAR WISE • FY 2016-17: INR 17.74 Lakhs. • FY 2017-18: INR 0.0 • Expenditure incurred so far “NIL”.

  4. MAJOR PROCUREMENT ITEM IN PIP (ITEM CODE,ITEM AND AMOUNT):-

  5. MAJOR PROCUREMENT ITEM IN AWP 2016-17 & THEIR STATUS(ITEM CODE,ITEM AND AMOUNT):-

  6. MAJOR PROCUREMENT ITEM IN AWP 2017-18 & THEIR STATUS(ITEM CODE,ITEM AND AMOUNT):-

  7. PHYSICAL PROGRESS-COMPLETED, PROCESS UNDERWAY,PROPOSED:- • COMPLETED: - Identification of 143 sites for installation of new Piezometers. • PROCESS UNDERWAY:-Bid document for installation of 143 Piezometers under process. • PROPOSED:-Procurement of IT hardware & software through bidding process.(since GEMS/DGS&D can not be followed at present in the state)

  8. STATUS OF BID DOCUMENT-FLOATED,READY TO BE FLOATED,UNDER PREPARATION:- • FLOATED:- NIL • READY TO BE FLOATED- NIL • UNDER PREPARATION:- Bid document for installation of Piezometers is under preparation.

  9. STATUS OF VARIOUS STUDIES/PDS ETC.:- • Various studies/PDS have been Programmed during FY 2018-19.

  10. STATUS OF DATA ENTRY IN E-SWIS:- • Data entry in E-SWIS ; not related to Odisha-GW.

  11. STATUS OF HYDROMET STATION (BOTH GW & SW), RECOINCILIATION WITH STATE, CGWB, CWC, IMD ETC. • Total existing piezometers: 649. • Total proposed Piezometers in PIP: 700. • Piezometers Proposed during FY 2017-18 : 143. • Reconciled with CGWB, Integrated by SER,CGWB. • Identifying suitable locations for installation of telemetry systems in existing Piezometers under progress.

  12. STATUS OF STATE WRIS • Not yet started. • Requires advice & support from TAMC.

  13. STATUS PUBLIC FINANCE MANAGEMENT SYSTEM(PFMS):- • Registered with PFMS. • Expenditure not incurred till yet. • PFMS guidelines will be followed.

  14. ANY OTHER ISSUES:- • TAMC support is required for preparation & finalizing bid documents (for DWLR,WQ equipments engagement of consultants & other procurements.

  15. WAY FORWARD:- • DoWR has communicated the approval of AWP 2017-18 amounting to Rs. 299.87 lakhs vide letter No. 18816/WR Bhubaneswar, dtd 03/08/2017 after which the funds will be utilized way forward.

More Related