NATIONAL HYDROLOGY PROJECT . 1 ST WORLD BANK MISSION ODISHA- GROUND WATER 22-23 August 2017 BHUBANESWAR. DETAILS OF SPMU (IN POSITION),STAFF STRENGTH ETC. SPMU Odisha has been formed vide notification no. 13675/WR dt. 10/06/2016 of DoWR, GoVT of Odisha. SPMU structure :-
E N D
NATIONAL HYDROLOGY PROJECT. 1ST WORLD BANK MISSION ODISHA- GROUND WATER 22-23 August 2017 BHUBANESWAR
DETAILS OF SPMU (IN POSITION),STAFF STRENGTH ETC. • SPMU Odisha has been formed vide notification no. 13675/WR dt. 10/06/2016 of DoWR, GoVT of Odisha. • SPMU structure :- • 1.Project Coordinator; EIC(P & D),WR • 2.Project Director(NHP): Director, Costal Protection & River Training, BBSR. • 3.Nodal Officer(SW): Director Hydrometry, BBSR. • 4. Nodal Officer(GW): Supdt. Engineer,GWD,BBSR. • PMU-OdishaGW has been constituted by the Project Coordinator(NHP Odisha) • Vide order no. 28335 dt. 06/08/2016. • PMU[Odisha GW) Structure: • 1.B.R. Padhee,SE, -Nodal Officer,Odisha-GW. • 2.Er. Anup K. Das,EE -Hydrologist. • 3.Er. S.K. Pattnaik AEE(C) -Hydromet Instrumentation Expert. • 4.Sri B.K. Sahoo,Geologist -Hydrogeologist. • 5.Er. Suparna Nayak,AEE(M) -Procurement specialist. • 6.Sri B.P.Padhee,Geologist -GIS Expert. • All are in position at present and working in addition to their routine responsibility. Moreover,this Directorate has suggested to appoint the following categories of manpower to work in PMU cell(Odisha-GW). a) Asst. Accountant-1 no.; b) Comp. Operator cum-Office Assistant-2 nos. c) Security Guard-1 no.; d) Office Attendant for PMU cell-1 no. Besides,the field Divisions have requested to engage security personel and office assistants for their Divisions which will be submitted to the higher authority for approval.
FUNDS RECEIVED(2016-17),(2017-18) & EXPENDITURE TILL DATE YEAR WISE • FY 2016-17: INR 17.74 Lakhs. • FY 2017-18: INR 0.0 • Expenditure incurred so far “NIL”.
MAJOR PROCUREMENT ITEM IN AWP 2016-17 & THEIR STATUS(ITEM CODE,ITEM AND AMOUNT):-
MAJOR PROCUREMENT ITEM IN AWP 2017-18 & THEIR STATUS(ITEM CODE,ITEM AND AMOUNT):-
PHYSICAL PROGRESS-COMPLETED, PROCESS UNDERWAY,PROPOSED:- • COMPLETED: - Identification of 143 sites for installation of new Piezometers. • PROCESS UNDERWAY:-Bid document for installation of 143 Piezometers under process. • PROPOSED:-Procurement of IT hardware & software through bidding process.(since GEMS/DGS&D can not be followed at present in the state)
STATUS OF BID DOCUMENT-FLOATED,READY TO BE FLOATED,UNDER PREPARATION:- • FLOATED:- NIL • READY TO BE FLOATED- NIL • UNDER PREPARATION:- Bid document for installation of Piezometers is under preparation.
STATUS OF VARIOUS STUDIES/PDS ETC.:- • Various studies/PDS have been Programmed during FY 2018-19.
STATUS OF DATA ENTRY IN E-SWIS:- • Data entry in E-SWIS ; not related to Odisha-GW.
STATUS OF HYDROMET STATION (BOTH GW & SW), RECOINCILIATION WITH STATE, CGWB, CWC, IMD ETC. • Total existing piezometers: 649. • Total proposed Piezometers in PIP: 700. • Piezometers Proposed during FY 2017-18 : 143. • Reconciled with CGWB, Integrated by SER,CGWB. • Identifying suitable locations for installation of telemetry systems in existing Piezometers under progress.
STATUS OF STATE WRIS • Not yet started. • Requires advice & support from TAMC.
STATUS PUBLIC FINANCE MANAGEMENT SYSTEM(PFMS):- • Registered with PFMS. • Expenditure not incurred till yet. • PFMS guidelines will be followed.
ANY OTHER ISSUES:- • TAMC support is required for preparation & finalizing bid documents (for DWLR,WQ equipments engagement of consultants & other procurements.
WAY FORWARD:- • DoWR has communicated the approval of AWP 2017-18 amounting to Rs. 299.87 lakhs vide letter No. 18816/WR Bhubaneswar, dtd 03/08/2017 after which the funds will be utilized way forward.