Case Studies and Other Classroom Reality Shows

Case Studies and Other Classroom Reality Shows. Session III: Preparing Case Studies John Casey School of Public Affairs john.casey@baruch.cuny.edu. The Dam.

kthrasher
Download Presentation

Case Studies and Other Classroom Reality Shows

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case Studies and Other Classroom Reality Shows Session III: Preparing Case Studies John Casey School of Public Affairs john.casey@baruch.cuny.edu

  2. The Dam A new industrial/manufacturing area is to be built, which will be available to operate at full capacity in 5 years.To supply the needed water and power to the industrial area, it has been decided to build a dam on a nearby river. A dam of this scale will take 5 years to build. Initial surveys have indicated that there are two possible locations for the dam, but without further survey work – which will take one year to complete – there is a risk that the construction will collapse in one of the two locations. If the dam is started in the wrong place, it is predicted that it will need to be abandoned after one year of construction. If the dam is not built on time (i.e. in the 5 years), there will significant “delay costs”, based on the lost economic opportunities, delay in provision of employment, penalty to be paid to industrial site developer, etc. The costs associated with building the dam are: - Survey: 0.1 billion - Construction: 100 billion / year (x 5 years) - Delay costs: 500 billion / year

  3. The Dam How/where do we build the dam – A or B? A B Survey: 0.1 billion Construction: 100 b/ year (x 5) Delay costs: 500 b/ year Industrial john.casey@baruch.cuny.edu (Adapted from a case used by Yehezkel Dror in his workshops in statecraft professionalism)

  4. Definition of a case Content • 5 lines to 50 pages • Print, online, multimedia • Account of real circumstances • Presents context and development but not outcome Process • Student-centered • Active learning • Instructor as facilitator

  5. Toxic Bosses Academic approach http://www.youtube.com/watch?v=YdcMsNokiIk Consultant approach http://www.youtube.com/watch?v=nSi5R8txxmI&feature=related Funny approach http://www.youtube.com/watch?v=--nTCbAZpAw&feature=related Real approach – Kevin Johnson “The results guy” http://www.npr.org/templates/story/story.php?storyId=96890384

  6. Robert Sterling Clark 3 Cases on nonprofit advocacy • Solid waste management • Foster care • Education funding “Traditional” cases + multimedia support Confidentiality issues