4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal
This presentation is the property of its rightful owner.
Sponsored Links
1 / 6

Distributed Dynamic Diversity Databases for Life PowerPoint PPT Presentation


  • 74 Views
  • Uploaded on
  • Presentation posted in: General

4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal. Distributed Dynamic Diversity Databases for Life. WP3 Strenghtening the GSD Network: A Virtual Community. Day 2 - General Meeting. WP3 Description of work.

Download Presentation

Distributed Dynamic Diversity Databases for Life

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Distributed dynamic diversity databases for life

4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal

Distributed Dynamic Diversity Databases

for Life

WP3

Strenghtening the GSD Network: A Virtual Community

Day 2 - General Meeting


Distributed dynamic diversity databases for life

WP3 Description of work

To facilitate structured information exchange through an elaborated information synthesis and by e-dessimination for new services

Task 3.1: Survey to assess, to peer-review and to certificate each GSD

Task 3.2: Evaluate and report on standards, best practices, new fields, …

Task 3.3: Consultation with each GSD choosing the pilot projects

Task 3.4: Two two-month Pilot projects per GSD database

Task 3.5: New e-2 system wrapper for few selected GSD databases

4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal


Distributed dynamic diversity databases for life

Task 3.1: Survey to assess, to peer-review and to certificate each GSD

- data

- wrapper

- formal membership of the CoL programme

- GSD metadata

M.11

March 2010

WP3 Progress report (1)

  • Task 3.1: Survey to assess, to peer-review and to certificate each GSD

  • Questionnaire prepared and sent to all GSD on November 18th (link with PESI)

  • Several reminders by DO & TB, last on the January 5th

  • Still missing some of them, but survey done by DO. Survey & results tomorrow

  • Wrapper survey (Viktor Didziulis)

  • Membership (Rebecca Mann)

  • GSD metadata - agreed to delay this task for 6 months (WP6)

4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal


Distributed dynamic diversity databases for life

WP3 Progress report (2)

Task 3.2: Evaluate and report with GSD and nomenclators custodians, editorial services staff (WP5) for:

- changes to the data standards for existing fields (if any)

- changes to the Sp2000 Best Practices document (if any)

- possible extensions to the bio-data fields (requests from the Services team)

- possible internal services (name-alerts, user comment service, cross-checking with regional hubs, other lists, unassigned name batches)

M.11

March 2010

  • Task 3.2: Evaluate and report on standards, best practices, new fields, …

  • Report tomorrow following questionnaire results:

    • Needs of improving definitions of fields (accepted and provisional names, LTS)

    • Agreement to add mandatory or optional new fields

    • (distribution, taxon LSD use, fossils, known habitats, subgenus rank, associated organisms, reference to nomenclators via LSID // hybrids, conservation status, size)

    • Analysis of implication of integration of services (to be done)

  • Deliverables: Best practices, Standard dataset, Survey report and subsequent pilot projects documents in March

4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal


Distributed dynamic diversity databases for life

Task 3.3:

- explaining, agreeing and establishing priorities for the pilot project to be undertaken, eventually to provide additional training days

M.12

WP3 Progress report (3)

  • Task 3.3: Consultation with each GSD choosing the pilot projects

    - Establishing priorities:

    synonymies, distribution, references, common names LTS / wrappers

    - Agreement done day1 of 2nd general project meeting

    - Few GSDs missing

4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal


Distributed dynamic diversity databases for life

Task 3.4: Two two-month Pilot projects per GSD database:

- for partially compliant GSds to take a step up the compliant ladder

(add fields or best practices)

- for new GSD to install and test wrapper and delivery process

- for installing and test fill the new bio-data fields from WP8

- for pilot participation in one the new internal services of the programme

Task 3.5: Two two-month Pilot project for selected GSD database:

- for test and install new e-2 system wrapper (at the end of the project)

M.24

M 36

WP3 Progress report (4)

4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal


  • Login