1 / 12

TRAINING CHARON VAX-AXP

TRAINING CHARON VAX-AXP. SPIE S.A DSTI. October 2011 PARIS. Profil. electrical and mechanical engineering. HVAC (heating, ventilation, and air conditioning) services. energy and communication systems.

kray
Download Presentation

TRAINING CHARON VAX-AXP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRAINING CHARON VAX-AXP SPIE S.A DSTI October 2011 PARIS

  2. Profil • electrical and mechanical engineering • HVAC (heating, ventilation, and air conditioning) services • energy and communication systems SPIE enhances the quality of life by helping local and regional authorities and companies design, build, operate and maintain facilities that are more energy-efficient and environmentally friendly. European leader in :

  3. 2010 Key figures • More than 29,000 employees • 400 locations • 30 countries • Pro forma turnover : €3.75 billion • Operating profit from ordinary activities : €192.3 million For more informations : www.spie.com

  4. Our Information System Internet Headquarters 9 French subsidiaries Data center SPIE’s WAN 3 Foreign subsidiaries hundreds commercial agencies

  5. Context • Set of critical middle-office homemade software managing : • Purchases • Sales • Orders • Equipments • Suppliers and supplies • … • Still evolving and supported for 7 subsidiaries. SPIE’s WAN Total of 23 Alpha Servers (DS20E,DS20,AS800) for production & development. Typical configuration for a subsidiary : LAN IAS IAS Oracle DB Alpha server DS20E Application server 1 Alpha server DS20E Application server 2 Alpha server DS20E Database Hardware : DS20E O.S : Tru64 5.1B Database : Oracle 8i Application server : iAS 8i Development language : Forms 6i

  6. Limitations & constraints End 2008 Limitations: High hardware maintenance cost (hardware failures). Disk space limited. 3 servers to manage and supervise for 1 application instance. Performances growth limited. Constraints : Each subsidiary has it’s own hardware. No software version modification. Keep the same quality of service.

  7. Tests, master copy • Dell/Charon Master copy setup -- end of 2009. restore /usr 1 - restore / and /usr from dump of actual DS20E restore / 2 - Clean devices, doconfig, install latest patch kit dka0 dka100 dka0 3 - add disks for application & data file systems Clone Windows using RAID1 rebuild capability dka100 Restore from backup dkb100 dka200 Software (Oracle, iAS, backup …) Database Spie Forms Binaries • Master copy and migrationmethods (clone) tests -- 2010 Charon-AXP and Hardware tests (I/O, cpu, Oracle) -- middle of 2009.

  8. Before After Stromasys Charon-AXP SMA+ Dell R610 Compaq DS20E DS20 DS10 AS1200 1 Intel Xeon Quad Core X5570 2.93 GHz 1 or 2 cores for Charon-AXP 1 core for Windows 1 core for Charon’s I/O 4 or 6 GB SDRAM 1 or 2 EV6.7 667MHz processors 3 or 4 GB SDRAM for Charon-AXP 2 or 4 GB SDRAM 4 ethernet adaptors (1Gbit) 1 ethernet adaptor (100Mbit or 1Gbit) 3 for Charon (netrain + backup) 1 for Windows Compaq Smart Array SCSI Controller with 6 (36GB) SCSI HDD Integrated Perc 6/I Controller with 6 (146GB) SAS HDD 1 RAID1 (36Go) Tru64 O.S Applications (Oracle, iAS …) swap 3 RAID 1 (140GB each) 1 – Windows O.S Tru64 swap 1 RAID5 (100Go, 4 HDD) Oracle database data SPIE Forms binaries 2 – Tru64 O.S Applications file systems (Oracle, iAS …) SPIE Forms binaries Oracle archive logs 3 – Oracle database data 23 11

  9. Migration (2010) • 7 subsidiaries : • 19 production DS20E • 4 non-production servers 3 DS20E 3 DS20E 3 DS20E 3 DS20E 4 DS20E 2 DS20E 1 DS20E • Migration Step 1 : • Move the 19 DS20E to the SPIE headquarters.

  10. Migration (2010) Step 2 : Clone Windows 2k3 from the master copy on the 12 Dell R610 and install Charon-Axp license keys. Step 3 : Backup the non-O.S file systems from the actual DS20E and restore them on the Charon-AXP corresponding file systems Step 4 : Turn off the old DS20E.

  11. Benefits of Charon-AXP What’s next … • ES40 evolution (1 more CPU and 4GB SDRAM). • Improve the Disaster Recovery Plan. • SAN tests for better I/O performances. Low hardware maintenance (up-to-date hardware with 3 year warranty). Less servers to manage => less space/electrical consumption/cooling. Performances and stability enhancement. Easy to update : add/upgrade CPU, SDRAM, disks or change server. Quick migration : no rewriting and qualifications tests for applications and processes. No change for application users, developers and Unix administrators.

  12. Key actors • Consulting, tests • Master copy conception • Tru64 and Charon-AXP expert • Studies and tests • Technical architecture • Migration • Support • Evaluation license keys

More Related