An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 10 CFR 600: Know Your Requirements Presented by: Michelle Picklesimer Financial Management WEATHERIZATION ASSISTANCE PROGRAM / PROGRAM MANAGEMENT CURRICULUM – September 2011

  2. 10 Code of Federal Regulation 600 Major Subparts • Subpart A - General • Subpart B - Grants to Other Than State and Local Governments • Subpart C - Grants to State and Local Governments • Subpart D - Cooperative Agreement

  3. 10 CFR 600 Sections

  4. Grant Application Requirements This section prescribes the forms and instructions to be used in applying for federal assistance. Applicants are not required to submit more than the original and two copies of preapplications and applications. For amendments to a previously submitted application only the affected pages need be submitted.

  5. Debarment and Suspension • Recipients shall comply with the debarment and suspension common rule. • www.epls.gov

  6. Special Restrictive Conditions Requirements Defines under what circumstances a grantee will be considered high-risk: • history of unsatisfactory performance, • financially unstable, • management system that does not meet standards, • nonconformance in prior awards, • or not otherwise responsible. Awarding agency will provide written explanation of conditions and corrective action.

  7. Financial Management Standards Requirement Financial management systems must meet the following minimum standards: • Provide for accurate, current, and complete disclosure for all financial activities. • Maintain records that identify the source and use of funds.

  8. Accounting System Accounting system that does not segregate funds LIHEAP Grant Grant 1 Grant 2 Grant 3 Weatherization Grant Utilities Funds

  9. AccountingSystem Accounting system that does segregate funds LIHEAP Grant Weatherization Grant Utilities Funds

  10. Financial Management Standards Requirements Financial management systems must meet the following minimum standards: • Internal Control. Maintain effective control and accountability for all grant cash, property, and other assets. • Budget Control. Compare actual expenditures with budgeted amounts on a periodic basis.

  11. Financial ManagementStandards Requirements Budget Control • Serves to link programmatic and financial activities. • Prevents cost overruns. • Helps staff responsible for specific activities to maintain control over expenditures.

  12. Financial Management Standards Requirement Financial management systems must meet the following minimum standards: • Source Documentation. Have records supported by source documentation. • Cash Management. Have procedures to minimizing time elapsing between the transfer of funds and disbursement of funds.

  13. Payment Requirements All methods and procedures for payment shall minimize the time elapsing between the transfer of funds and disbursement by the subgrantee. The payment methods that can be used are: • Advances (for grantees if they meet standards) • Reimbursements (when requirements are not met or for construction contracts.) • Working capital advances (if a subgrantee cannot meet the criteria for advance payments.)

  14. Payment Requirements • Recipients must also expend program income, rebates, refunds, and audit recoveries before requesting additional federal cash payments. • Payments cannot be withheld unless: • Recipient has failed to comply with grant award conditions. • Recipient is indebted to the United States. • Recipients are encouraged to use minority owned banks.

  15. Financial Management Standards Requirements Financial management systems must meet the following minimum standards: • Allowable Cost. Determine allowable costs by OMB cost principles, program regulations, and grant agreement.

  16. Allowable Cost Requirements The allowable costs referenced in 10 CFR 600 are detailed in separate OMB Circulars: • OMB Circular A-87 -Cost Principles for State and Local Governments. (2 CFR Part 225) • OMB Circular A-122 -Cost Principles for Non-Profit Organizations. (2 CFR Part 230) • OMB Circular A-21 – Cost Principles for Institutions of Higher Education (2 CFR Part 220)

  17. Period Allowability of Funds Requirements • Where a funding period is specified, a grantee may charge to the award only costs resulting from obligations during the funding period.

  18. Cost Sharing Requirements All Contributions, including cash and in-kind, shall be accepted as part of recipient’s cost sharing or matching if they: • are verifiable through records, • are not counted for other federal programs • are necessary for completion of the project, • are allowable under the cost principles, • are not paid by other federal funds (unless approved by statute), • are provided for in the approved budget, and • conform to other provisions of the financial management circulars.

  19. Program Income Requirements Program income is gross income generated by a grant supported activity, or earned only as a result of the grant agreement during the grant period. The methods for treatment of program income include: • Addition • Deduction • Cost Sharing

  20. Program Income Requirements Unless authorized by Federal regulations or the grant agreement, program income will be treated as gross program income. Unless authorized, program income shall be deducted from the total allowable costs. There are no Federal requirements governing the disposition of program income earned after the end of the award period unless the regulations or agreement states differently.

  21. Non-Federal Audit Requirements State and local governments and non-profit organizations will be subject to the audit requirements in OMB A-133.

  22. Budget and Project Revisions Requirements Recipients are permitted to rebudget within the approved direct cost budget to meet unanticipated requirements and make very limited program changes. The applicable cost principles which require prior approval shall apply. Prior approval is required based on specific clauses within the grant agreement and in the following instances where • a revision would result in the need for additional funds; • Cumulative transfers would exceed 10% of the total budget if the grant is over $100,000;

  23. Budget and Project Revisions Requirements • Funds allotted for training were transferred; • There is a revision in the scope of objectives; • Contracting out of any work; • There is a need to extend the period of availability of funds; • There is a change in key persons who are central to the purpose of the project or • Absence of Project Director or Principal Investigator for more than 3 months or 25% of time Requests for prior approval will be in the same format as used in the application. The approval must be in writing.

  24. Real Property and Equipment Requirements Real property means land and structures. Title to real property will vest with the grantee or subgrantee. The awarding agency will provide instructions for disposition of real property when it is no longer needed.

  25. Real Property and Equipment Requirements Equipment is defined as tangible, nonexpendable personal property having a useful life of more than one year and an acquisition cost of $5,000 or more per unit. Title to equipment acquired under a grant or subgrant will vest with the grantee or recipient unless specified. Equipment shall be used for the program or project it was acquired. The equipment may be used for other Federally supported projects if it does not interfere with the project for which it was originally acquired. Equipment shall not be used to provide services to non-federal outside organizations for a fee less than private companies charge.

  26. Real Property and Equipment Requirements • If replacement equipment is needed the equipment to be replaced may be used as a trade-in. • The property management requirements include the following: • Property records must include a description, serial number, source, title, cost, acquisition date, percent of Federal participation, location, use, condition, and ultimate disposition. • Physical inventory must be done at least every two years. • A control system to ensure safeguards against loss, damage, or theft.

  27. Real Property and Equipment Requirements • Adequate maintenance procedures. • Proper sales procedures. Items with a fair market value (F.M.V.) of $5,000 or less that are no longer needed can be disposed of with no further obligations. Items over $5,000 F.M.V. require the awarding agency to receive its fair share.

  28. Real Property and Equipment Requirements Federally owned equipment requires a recipient to submit an annual inventory listing. When the equipment is no longer needed a grantee will request disposition instructions from the Federal agency.

  29. Supplies Requirements Title to supplies acquired under an award will vest with the recipient. If there is a residual inventory of unused supplies exceeding $5,000 in total fair market value upon termination or completion of the award and if the supplies are not needed for any other federally sponsored programs the recipient shall compensate the awarding agency for its share.

  30. Federal Procurement Regulations Standards: • Recipient is responsible for all procurement contractual and administrative issues • Maintain Code of Conduct • All procurement transactions must provide for open and free competition

  31. Federal Procurement Regulations Grantees and Subgrantees must have written procurement procedures that include: • Procedures that avoid the purchase of unnecessary or duplicative items. • Analysis of lease and purchase alternatives. • Preference for products and services that conserve natural resources and protect the environment.

  32. Procurement Regulations • Grantees are encouraged to enter into State and local inter-governmental agreements for purchasing common goods and services. • Grantees are encouraged to use Federal excess and surplus property. • Procedures to ensure awards are only to responsible contractors. • Records that detail the significant history of a procurement. • Grantees will have protest procedures.

  33. Procurement Regulations • All procurement transactions will be conducted in a manner providing full and open competition. There must be written selection procedures. Also, the solicitation must include a clear and accurate description of the service or material being procured.

  34. Methods of Procurement • Small purchase. Procedures for services and goods that will not cost more than $25,000 in the aggregate (non profits) and $100,000 (governmental). • Sealed bids (formal advertising). • Competitive proposals. • Non-competitive proposals may only be used when the item is available from one source, emergency situations, the awarding agency authorizes, or competition is determined inadequate. Pre-award review may be required.

  35. Methods of Procurement Sealed Bid Proposals: • Made early in the procurement cycle: • Allows vendors time to prepare their bids to meet the specification of the solicitation • Solicitation information includes: • What is being purchased • Terms & conditions the vendors must meet • Where & when sealed bids will be opened

  36. Methods of Procurement Sealed Bid Proposals: • Awards are made to the lowest priced responsible vendor: • Capable of compliance will all bid specification • Capability of performing the work • Has administrative capacity • Award becomes – a firm, fixed price contract

  37. Methods of Procurement Sealed Bid Proposals: • Vendor’s payments: • Lump sum - paid for successful performance • Unit price - paid for each deliverable unit is completed in the contract • Must have at least 2 responsive suppliers competing for contract

  38. Methods of Procurement Competitive Proposal Procurements: • Proposal types: • Request for Proposal • Request for Quotations • Request for Information

  39. Methods of Procurement Competitive Proposal Procurements: • Publicized method same as sealed competitive process (invitation for bids) • All evaluation factor publicized & their importance • All vendor submittals received and evaluated • Proposals must be solicited from a number of qualified sources • Organization must have a method for conducting technical evaluation of all proposals & for selecting awardees

  40. Methods of Procurement Competitive Proposal Procurements: • Award made to the most responsive firm whose proposal is most advantageous to the program • Price and other factors considered to determine most advantageous offer • Must have at least 2 responsive suppliers competing for contract

  41. Methods of Procurement Non Competitive Procurements: • Non competitive procurements must be approved by funding agency before awarding • Organization must devise & document its own analysis process to ensure fair prices are being charged • Non competitive contracts become negotiated contracts • Organization determines what level of organizational leadership is required to approve this method

  42. Methods of Procurement Non Competitive Procurements: • May be used only when it is not feasible for: • Small purchase procedures • Sealed bid or competitive proposals and one of the following conditions applies: • Item only available from a single source • Emergency exist that will not permit a delay resulting from completive bidding

  43. Methods of Procurement Non Competitive Procurements: • Organization authorized noncompetitive proposals • After solicitation of a number of sources, competitive is determined as inadequate Cost analysis is required which verifies: • Proposed cost data • Projection of the data • Evaluation of costs and profits

  44. Procurement • Grantees are to encourage minority firms, women’s business enterprises, and labor surplus area firms.

  45. Procurement • There must be a cost price analysis in connection with every procurement.

  46. Procurement • Grantees must make available proposed procurement technical specifications upon request by the awarding agency.

  47. Procurement • The bonding requirements of a recipient will be accepted if the awarding agency’s interest is adequately protected. If not, there are specific requirements described in 10 CFR 600.

  48. 12 Steps of Procurement • Determine what you will be purchasing • Establish the timeframe for the purchase. • Identify the lead individual to handle the purchase. • Prepare the general instructions. • Prepare the specifications and price quote sheets. • Advertise the solicitation

  49. 12 Steps of Procurement • Conduct bidder’s conference. • Receive bids/proposals/quotations. • Evaluate the bids/proposals/quotations. • Select the contractor(s)/vendor(s) • Establish the solicitation file. • Enter into agreements with contractor(s)/vendor(s).

  50. Performance Report Requirements Performance reports shall not be required more frequently than quarterly or, less frequently than annually. Periodically report progress in meeting program objectives. This must include comparison of accomplishments with planned objectives. Quarterly and semi-annual reports will be due 30 days after the reporting period. Annual and final reports will be due 90 days after expiration date.