NAVAL AVIATION SYSTEMS. TEAM. TEAM. NASA Office of Safety & Mission Assurance IV&V Cost Estimation – A Joint NASA & US Navy Collaboration to Model & Automate the Process. Software Assurance Symposium 30 July ~ 1 August 2003 Prepared by: Tom Robinson Research & Engineering Dept.

Download Presentation

Software Assurance Symposium 30 July ~ 1 August 2003 Prepared by: Tom Robinson

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

NAVAL AVIATION SYSTEMS

TEAM

TEAM

NASA Office of Safety& Mission AssuranceIV&V Cost Estimation – A Joint NASA & US Navy Collaboration to Model & Automate the Process

Software Assurance Symposium

30 July ~ 1 August 2003

Prepared by: Tom Robinson

Research & Engineering Dept.

Naval Air Depot Jacksonville, FL

[email protected]

Software Assurance Research Program

FY-2003


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

  • IV&V Cost Estimation – A Joint NASA & US Navy Collaboration

  • to Model and Automate the Process (CSIP2002-46)

  • The U.S. Navy has joined with National Aeronautics and Space Administration (NASA) in a collaborative effort to model and automate the process of cost estimation for Independent Verification & Validation (IV&V) of software.

  • The Naval Air Systems Command developed an easy-to-use cost tool for system software and hardware integration testing that uses a bottoms-up work breakdown structure (WBS), combined with statistical regression cost analysis, that yields cost estimates with a high degree of confidence.

  • The thrust of this Initiative is to develop similar tools for use by NASA on IV&V projects, and ultimately to improve the speed, accuracy, and consistency of NASA software IV&V cost estimating.

NAVAL AVIATION SYSTEMS

TEAM

TEAM

Initiative Description

CSIP2003-456


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

  • Gather, Compile, and Analyze Data detailing Existing NASA Software IV&V Activities.

  • Establish / Validate a Benchmark with Processes and Procedures for Software IV&V in use by Industry, Academia, and other Government Agencies.

  • Refine NASA Software IV&V Program Management Processes, Interfaces and Tools necessary to Improve the Speed and Accuracy of Software IV&V Program Scheduling, Risk Assessment, and Cost Estimating.

  • Develop, prototype, and validate new NASA Software IV&V Program Cost Estimating Tools.

  • Improve and Evolve NASA Software IV&V Business Processes and Techniques.

NAVAL AVIATION SYSTEMS

TEAM

TEAM

Goals / Objectives

CSIP2003-456


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

- Item Sizes, etc

- Labor Rates

- Timeline Info

Standard

Contract

- IV&V Criteria

A

B

C

D

E

F

ICE Tool

IV&V

Should-Cost

Estimator

NAVAL AVIATION SYSTEMS

Contractor

Criticality Analysis and Risk Assessment

Spread

by FY

TEAM

TEAM

All S/W Items

(Items for IV&V in Red)

BCWS

Regular

Consistent

Reports

‘Earned

Value’

ACWP

BCWP

Cost &

Schedule

Technical

Metrics

Project Tracking

Process

Improvement

All data above contained and configured/controlled in a Common Data Depository

Possible ICE Tools Relationship

within a Business Model

CSIP2003-456


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

  • Established a Joint IV&V Cost Estimating (ICE) Team comprised of Personnel from NASA, the Naval Air Systems Command, Software

    Industry, and Software Engineering Academia

  • Developed & Delivered IV&V Effort Man-hour Tool (EMT - ProLogic)

  • Developed the Prototype IV&V Cost Estimating Tool (‘ICE Tool’)

  • Compiled & Distributed NASA Software IV&V Activity / Task Matrix,

  • corresponding Dictionary, and Standard ‘Mission Class’ Criteria Tables

  • Established Initial IV&V Cost Estimating Work Breakdown Structure

  • Developed & Delivered the Pre-Production ICE Tool

    • Demo during this 2003 NASA OSMA SAS

  • Production ICE Tool in-work; Hosting data tables on the NASA IV&V Tools Lab network server – Production Delivery in October 2003

NAVAL AVIATION SYSTEMS

TEAM

TEAM

Major Accomplishments

CSIP2003-456


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

NAVAL AVIATION SYSTEMS

TEAM

TEAM

IV&V Cost Estimating (ICE)

Navigator Screen

CSIP2003-456


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

1 – ICE ‘Run’ ends with a prioritized summary list of S/W Items

$4,563 K

Probable Budget

$ 574K

Budget Shortfall (from Min.)

$6,152 K

Ideal Budget

25 %

ID

S/W Item

2 – S/W Item selected by ‘clicking’

Item in prioritized summary list

NAVAL AVIATION SYSTEMS

Available (4,563)

5.1.1.1.3

Telemetry Processing (TMP)

Min.for Cert. (5,137)

TEAM

WBS

Test

IV&V Activity

Req

Des

Code

TEAM

ü

ü

ü

ü

Ideal (6,152)

101

Criticality Analysis/Risk Assessment

ü

65

ü

Criticality Analysis

102

ü

ü

ü

Hazard Analysis

103

ü

ü

ü

104

Risk Analysis

5 – Return to prioritized summary of all S/W Items

ü

ü

ü

105

Independent Risk Assessment

Save

Adjustment Rationale

Reason for change

4 – Return to IV&V Details for the S/W Item after saving reasons

3 – Any adjustment to any IV&V task activity for that S/W Item requests a reason be entered

Viewing & Adjusting ICE Results

Save Changes

CSIP2003-456


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

NAVAL AVIATION SYSTEMS

TEAM

TEAM

IV&V Cost Estimating (ICE)

Tool Walk-Through

CSIP2003-456


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

  • Continue to collect and refine IV&V Task Details (Man-hours, Scalars) and Mission Class criteria; Define & refine contract cost Reporting requirements to capture future IV&V costs

  • Survey Department of Defense programs for IV&V cost data to

    Assist in tuning / validating the NASA IV&V Cost Estimating Tools

  • Design and develop a statistical IV&V cost / forecast engine to Overlay the ICE Tool bottoms-up, engineering-based WBS cost estimate

  • Perform full-up Beta-testing of network-based ICE Tools; Analyze &

    Report findings; Develop “Tuning Utilities” and maintenance ‘Assistant’

  • Initiate Independent testing of IV&V Cost Estimating Tools; Analyze Test results; Update / improve tools as required

NAVAL AVIATION SYSTEMS

TEAM

TEAM

Plans for Fiscal Year - 2004

… Transition!

CSIP2003-456


Software assurance symposium 30 july 1 august 2003 prepared by tom robinson

Tom Robinson (“Robbie”)

NAVAIR Research & Engineering (JAX)

[email protected]

John Marinaro

NASA IV&V Facility

[email protected]

Christina Moats

NASA IV&V Facility

[email protected]

Ken McGill

NASA IV&V Facility

[email protected]

Tim Menzies, PhD

WVU SE Research Chair

[email protected]

Hugh Smith

The M & T Company

[email protected]

Dan McCaugherty

ProLogic Inc.

[email protected]

Josiah Devasirvatham

Science Applications International Corp

[email protected]

Tom Marshall

Titan System Corp (Averstar Group)

[email protected]

Rich D’Alessio

The M & T Company

[email protected]

… You ?

Volunteers …

NAVAL AVIATION SYSTEMS

TEAM

TEAM

The ‘ICE’ Team

CSIP2003-456