First Update Presentation. High Speed UAV Team Fall 2005. Topics. 1. What is our project about - Brad. 2. What we have been doing? - Travis . 3. Where are we going? - Matt. High Speed UAV. High Speed UAV Project Outline. 1- Customer needs 2- Complete autonomous control of the aircraft

Download Presentation

First Update Presentation

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


First update presentation

First Update Presentation

High Speed UAV Team Fall 2005


Topics

Topics

1. What is our project about - Brad

2. What we have been doing? - Travis

3. Where are we going? - Matt


High speed uav

High Speed UAV


High speed uav project outline

High Speed UAV Project Outline

1- Customer needs

2- Complete autonomous control of the aircraft

3- Build a UAV capable of 300+ mph flight speeds

4- Airframe constructed from composite materials

5- Innovative launch/ landing techniques


High speed uav project outline1

Customer needs- Design a small, relatively light UAV

Maximum functionality for its size

Could easily be carried into a location and setup for use

Low cost to manufacture and assemble

Autonomous control -Fly without manual controls

Use preprogrammed GPS way points for flight path

High Speed -

Beat current record of 268 mph

Target speed of 300 mph

Airframe –

Modify current airframe design

Light weight, composite

Launch landing techniques –

Optimize fuel efficiency and aircraft Safety

High Speed UAV Project Outline


What we ve been up to

What We’ve Been Up To

Fundraising

  • $3200 from existing ASUU funding last year

  • $3000 from ATK (used to purchase controller)

    Only $1100 away from controller system (already a $7000 discount has been applied)


First update presentation

Autonomous Control System

  • Picolo System

    • Built in sensors including a SimulationProgram

    • Requires airframe input parameters


First update presentation

Modeling

  • Fluent Analysis

    • A current revision

    • of the HSUAV

    • solid model from

    • 2003 has been

    • completed


First update presentation

Current HSUAV Designs

  • Excalibur TUAV

  • Wingspan:8 ft.

  • Length:13 ft.

  • Weight:992 lb.

  • Flight time:4 hrs.

  • Max Speed:Mach 0.71

  • Shadow 200

  • Altitude:15,000 ft.

  • Range:32 nm

  • Endurance:4 hrs.

  • Cruise Speed:84 kts.

  • Maximum Speed:150 kts.

  • Propulsion:37 hp

  • Weight:215 lbs.

  • Length:9 ft.

  • Wingspan:12.75 ft.


Project aspects

Project Aspects

Manuf.

Control

Design

Money

Testing


Design tasks

Design Tasks

  • Existing design will be analyzed using CFD, FEA and traditional techniques

  • Aerodynamic Parameters Extracted

  • All internal components (controller, hardware, turbine, fasteners will be modeled)

  • All parts assembled in CAD. CG and other parameters determined.


Manufacturing tasks

Manufacturing Tasks

  • Mold for Rev 2 model finished

  • Models created from mold

  • Control Surfaces Installed

  • Linkages, servos and hardware installed

  • Turbine Mounted

  • Landing Gear

  • Launch


Control tasks

Control Tasks

Picolo Autopilot

  • Best Controller For our application

  • Gyros x, y, z

  • Accelerometers x, y, z

  • GPS

  • Simulation

  • Hefty Discount


Fundraising tasks

Fundraising Tasks

  • Continue to speak with potential donors(Aerojet, Boeing, Northrop Grumman, ATK…etc.)

  • Update current sponsors with our progress.

  • Purchase Control unit by November.


Testing

Testing

  • Fluent Test

  • Wind Tunnel Test

  • Controller Simulation

  • Car Tow