Construction claims in residential houses in saudi arabia
Download
1 / 14

Construction Claims in Residential Houses in Saudi Arabia - PowerPoint PPT Presentation


  • 98 Views
  • Uploaded on

Construction Claims in Residential Houses in Saudi Arabia. Presented by Adel Al Rabee. OUTLINE. Objectives Methodology Results Conclusion & Recommendations. RESEARCH OBJECTIVES. Identify types of construction claims in KSA Analyze severity and frequency of each type

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Construction Claims in Residential Houses in Saudi Arabia' - koen


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Outline
OUTLINE

  • Objectives

  • Methodology

  • Results

  • Conclusion & Recommendations


Research objectives
RESEARCH OBJECTIVES

  • Identify types of construction claims in KSA

  • Analyze severity and frequency of each type

  • Analysis causes of construction claims

  • Recommend solutions to eliminate or minimize claims


Research methodology
RESEARCH METHODOLOGY

  • Literature Search

  • Interviewing Involved Parties In Construction Projects

  • Preliminary Questionnaire Preparation

  • Survey Distribution

  • Data Gathering

  • Data Analysis

  • Recommendations


1 st step literature search
1st Step: Literature Search

First stage

A comprehensive study of all types of construction claims

Second Stage

A literature search focusing on identifying claims causes


2 nd step interviewing involved parties in construction
2nd Step: InterviewingInvolved Parties In Construction

Interviews and site visits to

  • The Owner

  • The Designer

  • The Consultant

  • The Contactor


3rd step preliminary questionnaire preparation
3rd Step: Preliminary Questionnaire Preparation

Develop a questionnaire to identifying

  • The most important causes of claims

  • The most frequent types of claims in single-family residential housing projects


4the step survey distribution
4the Step: Survey Distribution

  • 20Contractors

  • 19 Consultants

  • 5 Government offices from the Eastern Province


5th step data gathering
5th Step: Data Gathering

  • Printed copies to carry a two way communication tasks

    • Questionnaire

    • Interview

  • Hence, data was gathered through

    • site visits

    • Interviews

    • Discussions with owners, consultants, contractors and others involved in construction


6th step data analysis
6th Step: Data Analysis

A computer statistical package (SAS)

  • Tabulation and Cross Tabulation

    • Statistical Techniques

    • Ranking

    • Correlation

  • Significance

  • Statistical Result

    • Coefficient of Variation

    • Correlation


7th step results
7th Step: Results

Contractor

Owner

Disagreement

Dispute

Protest

Construction Claims

Stages

Claim


7th Step: Results

Most Frequent Causes

  • Changes Order Claims

  • Delay Claims

  • Extra Work Claims

  • Contractual Claims


7th Step: Recommendations

  • Payments schedule

  • Prepare the contract documents carefully

  • Owner should utilize consultant experience before signing the contract

  • Documents and written specifications to avoid ambiguities and conflicts between different parties

  • The government should establish a set of procedures to control the quality of the contractors and their construction work



ad