RPC Technical Trigger Status. Installation of RBC boards on the detector towers: done Cabling of negative wheels: cables ready, need to be installed Installation of TTU boards in USC55: 1 out of 3 (can cover up to 2 wheels)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' RPC Technical Trigger Status' - kitty


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
rpc technical trigger status

RPC Technical Trigger Status

  • Installation of RBC boards on the detector towers: done
  • Cabling of negative wheels: cables ready, need to be installed
  • Installation of TTU boards in USC55: 1 out of 3 (can cover up to 2 wheels)
    • The installation will be completed as soon as full production of Trigger Boards (Warsaw) will be delivered
  • Received from K.P. firmware for TTU Backplane  develop our part of fw to collect 5 wheel-level trigger and produce 1 Technical Trigger signal
  • Complete the chain

F. Loddo Bari RPC Meeting March. 2008

slide2

Test to validate the implemented algorithm

  • At sector level: done last week with diagnostic Readout (from TB)
  • Tower level: tomorrow we try to use minidaq and TTU on W+1 (sect. 2-3-10-11) Unfortunately not full tower…
  • Wheel level (when ?)
  • Study the timing calibration for cosmic muons
  • xcheck with DT trigger
  • coupling with Global Trigger
  • Provide Trigger for May Global Run and CMS startup, as requested by Joao and Wesley  Mission: Impossible ???

Develop TTU Emulator (who?)

Analyze Tracker Alignment “wishes”