An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Access Line Operation Analysis & • Case Study in Beijing Metro System Zhili Liu, Ph.D. School of Traffic and Transportation Beijing Jiaotong University Email: liuzl@bjtu.edu.cn

  2. THE DEVELOPMENT OF BEIJING METRO NETWORK OVERVIEW An Overview of Beijing Metro: GATEWAY CITIES PORT OF LONG BEACH PORT OF LOS ANGELES CALIFORNIA

  3. PEAK HOUR TRAFFIC IN BEIJING METRO SYSTEM • CHALLENGE OutsidetheStation On the Platform OnthePlatform Source: http://i2.feixin.10086.cn/feed/du32hypci7hv6?regid=405722

  4. PEAK HOUR TRAFFIC IN METRO • CHALLENGE

  5. batong LINE

  6. THE DEVELOPMENT OF BATONG LINE OVERVIEW • Opened in 2003, entirely above ground ,runs 18.9  km from Sihui (B) in the west to Tuqiao (A) in the east. • Extends Line 1 further east from Chaoyang District to suburbs in Tongzhou District across E 4th,E5th to E 6TH . E. 6th Ring Road E. 5th Ring Road E. 4th Ring Road

  7. Nearly 100% transfer to Line1 during AM rush hours

  8. ENHANCING THE CAPACITY IN • BATONG LINEMEET THE CHALLENGE • Upgrade signal system to reduce headways (76.4%) • Enlarge fleet size 4 cars to 6 cars (164%) • Control traffic on platforms • Control traffic outside stations • Open a BRT on Jingtong Expressway

  9. ENHANCING THE CAPACITY IN • BATONG LINEMEET THE CHALLENGE

  10. JINGtong BRT

  11. JINGTONG BRTOVERVIEW BRT Phase II BRT Phase I 7:00-9:00 AM Westbound 5:00-7:00 PM Eastbound Outside BRT (WB) Jianguomen Dawangqiao Sihui Shuanghuiqiao Inside BRT (WB) CL Inside BRT (EB) Outside BRT (EB)

  12. JINGTONG BRTOPERATION

  13. BATONG Line OPERATION Passenger volume on the Batong line reduces more than 6,000 passengers /day during the AM peak hour of the first 3 days. Before After Passenger volume was reduced in the stations close to the departure stops of BRT.

  14. JINGTONG BRTOPERATION Bus Metro Bus+Metro Car Taxi Others

  15. CONCLUSIONS The study has showed that the Batong line has experienced heavy congestion in the AM and PM peak hours. A number of solutions has been implemented to reduce the congestion on the Batong line. The BRT lines has attracted the traffic from the Metro system. Further research is needed to study the impacts of BRT services on the Metro system.