ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO.

ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO. Web site : www.egcoegypt.com Email : egco @ egcoegypt.com. More than twenty years of experience. ENGINEER GENERAL CON.CO.(EGCO). ENGINEER GENERAL CON.CO.(EGCO) :. ENG.ABDEL MOUTY AMER.

kiara
Download Presentation

ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO. Web site : www.egcoegypt.com Email : egco @ egcoegypt.com More than twenty years of experience

  2. ENGINEER GENERAL CON.CO.(EGCO) ENGINEER GENERAL CON.CO.(EGCO): ENG.ABDEL MOUTY AMER. EGCO, OUR COMPANY, HAS BEEN ESTABLISHED IN 1985, BY A VERY HIGH QUALIFIED GROUP OF CIVIL, MECHANICAL, ELECTRICAL AND ARCHITECTURAL ENGINEERS. WE HAVE A VERY GOOD EXPERIENCE OVER 20 YEARS IN THE CONSTRUCTION OF PROJECTS FOR WATER SUPPLY AND WASTE WATER FACILITIES. WE ARE WORKING HARD TO KEEP A GREAT COORDINATION BETWEEN OUR PROFESSIONAL EMPLOYEES AND THE MANAGEMENT OF OUR DEPARTMENTS, MAINTAINING THE HIGHTEST STANDARD OF QUALITY. SO WE INVITE YOU TO TAKE A LOOK AT OUR BROCHURE, WISHING ALL PROGRESS AND SUCCESS FOR EGCO. COMMITMENT TO QUALITY, SERVICE, FUNCTION AND VALUE REMAINS AT THE HEART OF EVERYTHING WE DO. ENG.ABDEL MOُُETY AMER CHAIRMAN OF THE BOARD

  3. CHAIRMAN AND MANAGING DIRECTOR GENRAL SYSTEMETICAL CHART GENERALPROJECTSMANAGER PUBLIC RELATION LEGAL AFFAIRS EXECUTIVE SECRETARY SECRETERIAL TECHNICAL MANAGER ADMINISTRATIVE MANAGER EXECUTIVE MANAGER IT MANAGER FINANCIAL MANAGER QUALITY CON-TROL MANAGER SUB-CONTRACTORSCASH ADVANCE STORES ACCOUNTS INTERNAL PREVIEW PLANNING HUMAN RESOURCES AND TRAINING DOCUMENTATION CONTROL GENERAL LEDGER AUDITING TENDERS RESEARCH CONTRACTS TENDERS RESEARCH PURCHASING CONTRACTS, OFFERS & PROJECTS COSTS CASHIER QUALITY CONTROL STORAGE INFORMATION STATICS MECHANICAL EQUIPEMENTS MANAGERS BANKS & INVESTMENTS EXECUTIVE WORKS PREVIEW SITE ENGINEER MANAGERS

  4. Company’s Equipment

  5. Company’s Equipment

  6. list of professionl staff

  7. LIST OF PROFESSIONAL STAFF

  8. LIST OF PROFESSIONAL STAFF

  9. LIST OF PROFESSIONAL STAFF

  10. LIST OF PROFESSIONAL STAFF

  11. Brief summary of projects

  12. BRIEF SUMMARY OF COMPANY’S PROJECTS

  13. BRIEF SUMMARY OF COMPANY’S PROJECTS

  14. BRIEF SUMMARY OF COMPANY’S PROJECTS

  15. BRIEF SUMMARY OF COMPANY’S PROJECTS

  16. BRIEF SUMMARY OF COMPANY’S PROJECTS

  17. BRIEF SUMMARY OF COMPANY’S PROJECTS

  18. BRIEF SUMMARY OF COMPANY’S PROJECTS

  19. BRIEF SUMMARY OF COMPANY’S PROJECTS

  20. BRIEF SUMMARY OF COMPANY’S PROJECTS

  21. BRIEF SUMMARY OF COMPANY’S PROJECTS

  22. BRIEF SUMMARY OF COMPANY’S PROJECTS

  23. Reporting on executed projects

  24. SEWAGE DRAINAGE NETWORKS AT 5TH AREA AT GAMASSATOURIST CITY, DAKAHLIA GOVERNORATE. MAIN CONTRACTOR : PROJECT DESCRIPTION: Construction of sewage drainage network at the 5th area, Gamassa Touristic city, to protect the city from pollution as well as encouraging resorting and tourism. Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate. EGCO SERVICES : • Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 450 mm, length of 8000 m and depths up to 6,50 m. • Supply and installation of 320 square & circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. • The construction was based on the well-point system dewatering according to the high water level at this area. COST: 1.5 Million EGP.

  25. SEWAGE DRAINAGE NETWORK AT THE INDUSTRIAL CITY , NEW DAMIETTA CITY MAIN CONTRACTOR : PROJECT DESCRIPTION: Construction of sewage drainage network for the industrial area at Damietta city to complete the existing drainage project at the city. Arab contractors – Tanta branch OWNER : National Organization for Potable Water and Sanitary Drainage. EGCO SERVICES : • Supply and installation of GRP & PVC pipes, diameters from 175 mm up to 600 mm , length of 10000 m and depths up to 8,50 m. • Supply and installation of 400 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 8,50 m. • The construction was based on the well-point system dewatering according to the high water level at this area. COST: 5.5 Million EGP.

  26. WATER PIPELINES AT NEW DAMIETTA CITY,DAMIETTA GOVERNORATE. MAIN CONTRACTOR : PROJECT DESCRIPTION: Arab contractors – Tanta branch CONSTRUCTION OF A POTABLE WATER PIPES LINE NETWORK, DIAMETER OF 1000 MM, FOR THE NEW DAMIETTA CITY, TO COMPLETE THE EXISTING SERVICES AT THE CITY. OWNER : National Organization for Potable Water and Sanitary Drainage COST: 4.5 Million EGP. EGCO SERVICES : • Supply and installation of pre-stress reinforced concrete pipes, diameter of 1000 mm and length of 1200 m including bends and plugs, etc. • Supply and installation of sluice, wash and air valves chambers including special pieces, valves and dismantling pieces. • The construction was based on the well-point system dewatering according to the high water level at this area.

  27. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY,EL BEHIRA,(PART ONE) PROJECT DESCRIPTION: CONSTRUCTION OF SEWAGE DRAINAGE NETWORK AT EL DELENGAT CITY TO COMPLETE THE EXISTING NETWORK ATEL BEHIRA GOVERNORATE. MAIN CONTRACTOR : Arab contractors – Alex branch. OWNER : National Organization for Potable Water and Sanitary Drainage COST: 3 million EGP EGCO SERVICES : • Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 375 mm, length of 8500 m and depths up to 6,50 m. • Supply and installation of 340 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 6,50 m. • The construction was based on the well-point system dewatering according to the high water level at this area.

  28. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY, EL BEHIRA, (PART TWO) PROJECT DESCRIPTION: CONSTRUCTION OF THE SECOND PART OF SEWAGE DRAINAGE NETWORK AT EL DELENGAT CITY TO COMPLETE THE EXISTING NETWORK ATEL BEHIRA GOVERNORATE EGCOSERVICES: • Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 375 mm, length of 8500 m and depths up to 4.50 m. • Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 4,50 m. • The construction was based on the well-point system dewatering. COST: OWNER : MAIN CONTRACTOR : Arab contractors – Alex branch National Organization for Potable Water and Sanitary Drainage. 3.5 million EGP.

  29. SEWAGE DRAINAGE NETWORK AND DEWATERIND AT EL KHANKA CITY, GREAT CAIRO. MAIN CONTRACTOR : PROJECT DESCRIPTION: Construction of sewage drainage network at El Khanka City to complete the existing network at Great Cairo. Arab contractors – Nasr City branch. OWNER : National Organization for Potable Water and Sanitary Drainage. EGCO SERVICES : • Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, length of 1200 m and depths up to 6,50 m. • Supply and installation of 48 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. • The construction was based on the well-point system dewatering according to the high water level at this area. COST: 2.0 million EGP.

  30. GRAVITY PIPELINES NETWORK, 1400 MM DIAMETER, AND DEWATERING AT RAS EL BAR, DAMIETTA GOVERNORATE. PROJECT DESCRIPTION: This project was constructed to join the partial stations with the main station by gravity pipes line, diameter of 1400 mm. MAIN CONTRACTOR : Arab contractors – Tanta branch. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 8.5 million EGP. EGCO SERVICES : • Supply and installation of GRP pipes, diameter of 1400 mm, to join the partial stations with the main station. • Supply and installation of slow down and sluice valves chambers including the special pieces, valves and paddle pieces. • The construction was based on the well-point system dewatering according to the high water level at this area.

  31. SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE. MAIN CONTRACTOR : PROJECT DESCRIPTION: Arab contractors – Tanta branch. CONSTRUCTION OF GRAVITY PIPELINES, DIAMETER OF 900 MM, AT RAS EL BAR CITY, TO TRANSPORT SEWAGE TO THE TREATMENT STATION AND TO COMPLETE THE EXISTING SEWAGE DRAINAGE NETWORK AT THE CITY. OWNER : National Organization for Potable Water and Sanitary Drainage EGCO SERVICES : • Supply and installation of ductile cast iron pipes, diameter of 900 mm, depths from 2,50 m up to 3,5 m and length of 9000 m. • Supply and installation of sluice, wash and air valves chambers including the special pieces, valves, paddle and dismantling pieces. • The construction was based on the well-point system dewatering according to the high water level at this area. COST: 9 million EGP.

  32. GRAVITY PIPELINES AND DEWATERING AT EZBET EL BORG CITY, DAMIETTA GOVERNORATE. PROJECT DESCRIPTION: Construction of the first part of gravity Pipes line at Ezbet El Borg according To the need of a sewage drainage network at this area. EGCOSERVICES: • Supply and installation of vitrified clay pipes with rigid joints, diameter from 175 mm up to 750 mm, length of 6000 m and depths up to 6,50 m. • Supply and installation of 400 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. • The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : OWNER : COST: Arab contractors – Tanta branch. National Organization for Potable Water and Sanitary Drainage. 9.0 million EGP.

  33. POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA. PROJECT DESCRIPTION: Construction of force main pipelines, from GRP pipes, diameter of 600 mm and length of 14000 m, to transport the sewage from the sewage drainage stations. Including the construction of valves chambers, special pieces, valves and dismantling pieces. EGCOSERVICES: • Supply and installation of force main pipelines from GRP pipes, diameter of 600 mm and length of 14000 m including excavation works, installation, test, washing, cleaning and transportation • Supply and installation of sluice, wash and air valves chambers valves including the special pieces, valves, dismantling and wall paddle pieces. • The construction was based on the well-point system dewatering for levels up to 3.50 m and on the deep-well system dewatering for levels more than 3.50 m. OWNER : COST: MAIN CONTRACTOR : National Organization for Potable Water and Sanitary Drainage 12 million EGP Industrial and Engineering Projects Company

  34. SEWAGE DRAINAGE NETWORK AND SEWAGE PUMPING STATIONS AT EL BATANOUN CITY. MAIN CONTRACTOR : PROJECT DESCRIPTION: Industrial and Engineering Projects Company. Construction of sewage drainage network at Batanoun, Menoufia Governorate according to the Government’s policy concerning supplying all villages and cities at Cairo by the Gravity pipes networks. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 6 million EGP. EGCO SERVICES : • Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 8000 m and depths up to 8.50 m. • Supply and installation of 320 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 and depths up to 8.50 m. • Supply and construction of 4 sewage pumping stations including wells works, diameters from 3 m up to 8 m, plus of construction of extension buildings as workshops, generator room, storage, administration building and outside fences. • The construction was based on the deep-well system dewatering according to the high water level at this area.

  35. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL MAASARA AND HELWAN. PROJECT DESCRIPTION: Construction of sewage drainage Network At El Maasara and Helwan areas to complete the existing network at the Great Cairo. EGCOSERVICES: • Supply and installation of vitrified clay pipes with flexible joints, diameters from 200 mm up to 550 mm, length of 6500 m and depths up to 6,50 m. • Supply and installation of 260 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m • The construction was based on the deep-well system dewatering according to the high water level at this area. COST: MAIN CONTRACTOR : COST: OWNER : Arab contractors – Helwan branch. National Organization for Potable Water and Sanitary Drainage. 9.0 million EGP.

  36. SEWAGE DRAINAGE NETWORK AT 10TH OF RAMADAN AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE MAIN CONTRACTOR : PROJECT DESCRIPTION: Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Balteem. Engineer General Con. Co OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate EGCO SERVICES : • Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, length of 1200 m and depths up to 6,50 m. • Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. • The construction was based on the well-point system dewatering according to the high water level at this area. COST: 2.0 million EGB.

  37. SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT THE 5 TH AREA AT GAMSSA CITY, DAKAHLIA GOVERNORATE MAIN CONTRACTOR : PROJECT DESCRIPTION: Engineer General Con. Co. OWNER : Construction of sewage drainage network at Gamassa, Dakahlia Governorate to complete the network of the city. Authority of Reconstruction and Housing at El Dakahlia Governorate COST: 1.5 Million EGP EGCO SERVICES : • Supply and installation of a well for the pumping station, internal diameter of 3 m including the reinforced concrete works and the penetration until the well settles at the required level. • Construction of the extension buildings as the workshop, the generator building, storage, security room and outside fences. • Supply and erection of mechanical and electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special parts, dismantling pieces and the installation at the valves chambers.

  38. SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL & ELECTRICAL EQIPMENTS AT THE 2ND AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE. MAIN CONTRACTOR : PROJECT DESCRIPTION: Engineer General Con. Co. Construction of a sewage pumping station and supply of mechanical & electrical equipments at the 2nd area to complete the sewage drainage network at Gamassa city. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate.. EGCO SERVICES : • Supply and installation of a well for the pumping station, internal diameter of 4 m, including the reinforced concrete works and the penetration until the well settles at the required level. • Construction of administrative units at the station as the workshop, the generator building, storage, security room and outside fences. • Supply and erection of mechanical & electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special pieces, dismantling pieces and the installationation at the valves chambers COST: 2.0 million EGP

  39. SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART ONE) MAIN CONTRACTOR : PROJECT DESCRIPTION: Arab contractors – Alex branch Construction of a sewage drainage Network at Damanhour (Part one) to complete the existing network at middle Delta. OWNER : EGCOSERVICES: • Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 10500 m and depths up to 8,50 m. National Organization for Potable Water and Sanitary Drainage. . COST: • Supply and installation of 420 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m. 3.0 million EGP • The construction was based on the well-point system dewatering according to the high water level at this area

  40. SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART TWO). PROJECT DESCRIPTION: construction of the second part of sewage drainage network at Damanhour City to complete the existing network project at El Behira Governorate. MAIN CONTRACTOR : Arab contractors – Alex branch OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 3.0 million EGP EGCO SERVICES : • Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 4800 m and depths up to 8,50 m. • Supply and installation of 190 square and circular plain concrete manholes, internal diameters of 1,20 mm and depths up to 8,50 m. • The construction was based on the well-point system dewatering according to the high water level at this area.

  41. SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE. MAIN CONTRACTOR : PROJECT DESCRIPTION: Industrial and Engineering Projects Company Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Bal teem. OWNER : National Organization for Potable Water and Sanitary Drainage EGCO SERVICES : • Supply and Construction of concrete wells, diameters of 12 m including the penetration for wells settlement at the required level. • Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room and the outside fences. • The construction was based on the well-point system dewatering according to the high water level at this area. COST: 6.0 million EGP.

  42. Sewage pumping stations (1,2) at El Horaniy city, Damietta Governorate MAIN CONTRACTOR : PROJECT DESCRIPTION: El Nasr Company for Buildings and constructions. Construction of the sewage pumping stations (1,2) and supply of mechanical & electrical equipments, to complete the sewage drainage network project at El Horaniy city. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 3.0 million EGP. EGCO SERVICES : • Supply and Construction of reinforced concrete wells and the penetration until the wells settles at the required level. • Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room, the administration building and the outside fences. • Supply and erection of electrical and mechanical equipments at the stations including submersible pumps, generator unit, distribution board, transformers and special pieces, valves, dismantling pieces at the valves chambers

  43. AHMED DAOUD CANAL IRRIGATION PIPELINES AT EL DOWAIDAR AREA, NORTH SINAI. MAIN CONTRACTOR : PROJECT DESCRIPTION: Construction of irrigation lines for the agriculture areas at north Sinai in accordance with the development scheme of this area. Industrial and Engineering Projects Company. OWNER : North Sinai Reconstruction Authority. EGCO SERVICES : • Supply and installation of GRP pipes, diameters of 700 mm, 1200 mm and 1400 mm, depths from 4 m up to 7 m and length of 12000 m. COST: 2 million EGP.

  44. POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA. PROJECT DESCRIPTION: Construction of a potable water Pipelines from El kantara East at EastEl Tafreaa Area to complete the needs and the services at this area. EGCOSERVICES: • Supply and installation of GRP pipes, diameter of 500 mm, depths from 2,50 m up to 3,50 m and length of 25000 m. • Supply and installation of 65 sluice, wash and air valves chambers including special pieces, valves and dismantling pieces. • Supply and construction of under crossing roads and over crossing canals, using excavation for the roads and piles for the canals. COST: OWNER : MAIN CONTRACTOR : Industrial and Engineering Projects Company. North Sinai Reconstruction Authority. 15 million EGP

  45. PILES FOR OVER CROSSING CANAL AT EL MAHMOUDIA, ABOU HOMOUS AND ZAWIAT GHAZAL, EL BEHIRA GOVERNORATE.. MAIN CONTRACTOR : PROJECT DESCRIPTION: In view of the need of "Abou Homuos city" for potable water supply, especially the east area of El Mahmoudia canal, it was necessary to construct an over crossing for ductile cast iron pipes, diameter of 600 mm. Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage.. EGCO SERVICES : • Supply and installation of 64 reinforced piles, diameter of 600 mm, length of 16 m including tests of loading and pouring of the reinforced concrete into the piles. • Supply and construction of walls and reinforced concrete piles heads to hold the steel bridge. COST: 3 million EGP

  46. GRAVITY PIPELINES NETWORK AND DEWATERING AT BALTEEM CITY, KAFR EL SHEIKH GOVERNORATE. PROJECT DESCRIPTION: Construction of a sewage drainage network at Balteem city to complete services at all villages and cities in Egypt. EGCOSERVICES: • Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to 750 mm, depths up to 8,50 m and length of 30000 m. • Supply and installation of 1200 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m. 4 • The construction was based on the well-point system dewatering for depths up to 3,50 m and on the deep well system dewatering for depths more than 3,50 m. • Demolition and reconstruction of water supply networks which facing the execution of the network project. MAIN CONTRACTOR : OWNER : COST: Industrial and Engineering Projects Company National Organization for Potable Water and Sanitary Drainage. 42.0 million EGP.

  47. Sewage Drainage network, force main pipelines and Dewaterimg at El Horani city, Damietta Governorate.. PROJECT DESCRIPTION: Construction of a sewage drainage network at El Horani city, Damietta Governorate, according to the Government policy to complete the construction of all sewage drainage networks at all villages and cities in Egypt EGCOSERVICES: • Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, depths up to 6,50 m and length of 12500 m. • Supply and installation of 500 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. • Supply and installation of ductile cast iron pipes, diameters of 150 mm & 200 mm and length of 6000 m including valves chambers, special pieces, valves and dismantling pieces. • Supply and construction of under crossing roads and over crossing canals including isolated iron pipes, diameters of 200 mm & 150 mm and the chambers on the crossing sides. COST: OWNER : MAIN CONTRACTOR : 13.0 million EGP. National Organization for Potable Water and Sanitary Drainage. El Nasr for buildings and Constructions.

  48. WATER PIPELINES AT MEETMAZAH AND MEETALI VILLAGES, DAKAHLIA GOVERNORATE. PROJECT DESCRIPTION: Supply and modification of Potable water network at Meetmazah and Meetali villages. EGCOSERVICES: • Supply and installation of potable water network from Asbestos pipes, diameters of 150 mm & 200 mm and lenglh of 18000 m. • Supply and installation of valve diameters of 150 mm & 200 mm including special pieces of bends, tees and reducers, etc, along the network. • Joining the housing connections with the main network. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate. COST: 1.5 Million EGP.