1 / 14

HERA Operation 2004 M. Bieler, -MPY- PRC, Mai 2004

Performance Improvements in 2004 Remaining Problems Improvement Program Schedule 2004. HERA Operation 2004 M. Bieler, -MPY- PRC, Mai 2004. Performance Improvements in 2004. Beam Currents Until March the Proton Beam Current was limited due to Radiation Safety Issues. Best Values until now:

kevork
Download Presentation

HERA Operation 2004 M. Bieler, -MPY- PRC, Mai 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Performance Improvements in 2004 Remaining Problems Improvement Program Schedule 2004 HERA Operation 2004M. Bieler, -MPY- PRC, Mai 2004

  2. Performance Improvements in 2004 Beam Currents Until March the Proton Beam Current was limited due to Radiation Safety Issues. Best Values until now: 103 mA Protons @ 920 GeV, 47 mA Positrons @ 27.5 GeV.

  3. Performance Improvements in 2004 Peak Luminosity has increased to 3.5 1031

  4. Performance Improvements in 2004 L sp ≈ 1.6 1030 ≈ 90% design

  5. Performance Improvements in 2004 Peak Lumi per Day: 1 pb-1 Peak Lumi per Week:5pb-1

  6. Integrated Lumi 2000 and 2004 Since January 2004 the Lumi Production Rate is comparable with 2000, since April 2004 it is considerably better.

  7. Performance Improvements in 2004 Measures to improve HERA Performance: • Streamlined Procedures(Positron Ramp directly into the Lumi File, ZEUS Calorimeter Closing @ 12 GeV,…) allow use of high Positron Currents. • Collision first at H1, then at ZEUS(to avoid Beam blow up). • Correction of Beam Tilts individually in ZEUS and H1. • Phase Trombone (Adjustment of Betatron Phase Advance in both ZEUS and H1 to compensate Beam-Beam Effects).

  8. Performance Improvements in 2004 Background Rates at ZEUS and H1 have decreased to tolerable Values. H1

  9. Performance Improvements in 2004 Polarisation reaches 40% regularly with 3 Spin Rotators on and Collisions. During long, quiet runs Polarisation can be tuned up to 50%. A faster Polarimeter would be useful for faster Tuning.

  10. Remaining Problems • Now that the Luminosity Goals are within Reach and the • Background Problems are solved, the main Problems are • - Reliability and Availability of all Components • (some Components are as old as PETRA) • Efficiency of Operation • (Experienced Operators have retired, new Operators have Tasks • on new Projects and no Connection to HERA)

  11. Remaining Problems Measures to improve Efficiency of Operation: • Enhanced Operator training • Improved Communication (Shift Briefings) • More Software Support for Operations • Continue daily Operations Meeting with all Groups

  12. Remaining Problems Critical Systems in Terms of Support, Expertise or Manpower: • Quench Protection • Proton RF Systems • Warm Magnets • PETRA • Timing and Low Level RF

  13. Proton RF Systems Injection Systems Collimation Systems Diagnostics Systems RF-Controls Vacuum System Power Supply Systems e-RF Systems Cryogenic Systems Improved low-level Controls, Suppression of long. Instability Improved monitoring, vertical Excitation Kicker Increased Reliability Improved Monitors (BPM, SR) p-RF Freq. Control, etc Better Pumping in RF Sections Add‘l PS for Spin Matching RF Modulator Upgrade Compressor and Controls Upgr. Improvement Program:Rich Program with 70 Items, the most important ones being: Sum: 2.26 M€

  14. HERA Schedule 2004 Lumi Run until Aug. 16 Shutdown until Oct. 8 • Yearly Safety Tests • Exchange of BU Coils • Exchange of 1 cold Quad • Prepare for Electrons Switch to Electrons during Restart (HERA would prefer a long, stable Run with Positrons) Lumi Run in November

More Related