Standard Costs

Chapter 8. Standard Costs. Predetermined. Used for planning labor, material and overhead requirements. Benchmarks for measuring performance. Used to simplify the accounting system. Standard Costs. Standard Costs are.

kevin-long
Download Presentation

Standard Costs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter8 Standard Costs

  2. Predetermined. Used for planning labor, materialand overhead requirements. Benchmarks formeasuring performance. Used to simplify the accounting system. Standard Costs Standard Costs are

  3. Managers focus on quantities and coststhat exceed standards, a practice known asmanagement by exception. Standard Costs Standard Amount DirectMaterial DirectLabor ManufacturingOverhead Type of Product Cost

  4. Setting Standard Costs Accountants, engineers, personnel administrators, and production managers combine efforts to set standards based on experience and expectations.

  5. Should we usepractical standardsor ideal standards? Setting Standard Costs ManagerialAccountant Engineer

  6. Setting Standard Costs Practical standardsshould be set at levelsthat are currentlyattainable withreasonable andefficient effort. Productionmanager

  7. Setting Standard Costs I agree.Ideal standards, that are based on perfection, areunattainable and discourage most employees. HumanResourcesManager

  8. Note • The argument that ideal standards are discouraging has been persuasive for many years. So “normal” defects and waste were built into the standards. • In recent years, TQM and other initiatives have sought to eliminate all defects and waste. • Ideal standards, that allow for no waste, have become more popular. • The emphasis is on improvement over time, not attaining the ideal standards right now.

  9. PriceStandards QuantityStandards Final, deliveredcost of materials,net of discounts. Use product design specifications. Setting Direct Material Standards

  10. RateStandards TimeStandards Use wage surveys andlabor contracts. Use time and motion studies foreach labor operation. Setting Direct Labor Standards

  11. RateStandards ActivityStandards The rate is the variable portion of the predetermined overhead rate. The activity is the base used to calculate the predetermined overhead. Setting Variable Overhead Standards

  12. Standard Cost Card – Variable Production Cost A standard cost card for one unit of product might look like this:

  13. Astandardis a per unit cost. • Standards are often used when putting together a budget. Are standards the same as budgets? A budget is set for total costs. Standards vs. Budgets

  14. A standard cost variance is the amount by whichan actual cost differs from the standard cost. This variance isunfavorablebecause the actual costexceeds the standard cost. Standard Cost Variances Standard Cost

  15. First, they point to causes ofproblems and directionsfor improvement. Second, they trigger investigations in departments having responsibility for incurring the costs. I see that thereis an unfavorable variance. But why arevariances important to me? Standard Cost Variances

  16. Takecorrective actions Identifyquestions Receive explanations Conduct next period’s operations Analyze variances Begin Variance Analysis Cycle Prepare standard cost performance report

  17. Price Variance Quantity Variance The difference betweenthe actual price and thestandard price The difference betweenthe actual quantity andthe standard quantity Standard Cost Variances Standard Cost Variances

  18. Price Variance Quantity Variance Standard price is the amount that should have been paid for the resources acquired. A General Model for Variance Analysis Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price

  19. Standard quantity is the quantity allowed for the actual good output. standard input per unit of output X amount of good output. A General Model for Variance Analysis Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price Price Variance Quantity Variance

  20. A General Model for Variance Analysis Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price Price Variance Quantity Variance AQ(AP - SP) SP(AQ - SQ) AQ = Actual QuantitySP= Standard PriceAP= Actual PriceSQ = Standard Quantity

  21. Standard Costs Let’s use the general model to calculate standard cost variances, starting withdirect material.

  22. Material Variances Example Glacier Peak Outfitters has the following direct material standard for the fiberfill in its mountain parka. 0.1 kg. of fiberfill per parka at $5.00 per kg. Last month 210 kgs of fiberfill were purchased and used to make 2,000 parkas. The material cost a total of $1,029.

  23. Price variance$21 favorable Quantity variance$50 unfavorable Material Variances Summary Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price 210 kgs. 210 kgs. 200 kgs. × × × $4.90 per kg. $5.00 per kg. $5.00 per kg. =$1,029 = $1,050 = $1,000

  24. $1,029  210 kgs = $4.90 per kg Material Variances Summary Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price 210 kgs. 210 kgs. 200 kgs. × × × $4.90 per kg. $5.00 per kg. $5.00 per kg. =$1,029 = $1,050 = $1,000 Price variance$21 favorable Quantity variance$50 unfavorable

  25. 0.1 kg per parka  2,000 parkas = 200 kgs Material Variances Summary Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price 210 kgs. 210 kgs. 200 kgs. × × × $4.90 per kg. $5.00 per kg. $5.00 per kg. =$1,029 = $1,050 = $1,000 Price variance$21 favorable Quantity variance$50 unfavorable

  26. Note: Using the formulas • Materials price variance MPV = AQ (AP - SP) = 210 kgs ($4.90/kg - $5.00/kg) = 210 kgs (-$0.10/kg) = $21 F • Materials quantity variance MQV = SP (AQ - SQ) = $5.00/kg (210 kgs-(0.1 kg/parka 2,000 parkas)) = $5.00/kg (210 kgs - 200 kgs) = $5.00/kg (10 kgs) = $50 U

  27. Quick Check  Suppose only 190 kgs of fiberfill were used to make 2,000 parkas? What is the materials quantity variance? Remember that the standards call for 0.1 kg of fiberfill per parka at a cost of $5 per kg of fiberfill. a. $50 F b. $50 U c. $100 F d. $100 U

  28. Quick Check  If the material standard specifies exactly how much material should be in the final product without any wastage, is a favorable (F) materials quantity variance a good thing? a. Yes b. No

  29. Zippy Material Variances Example Hanson Inc. has the following direct material standard to manufacture one Zippy: 1.5 pounds per Zippy at $4.00 per pound Last week 1,700 pounds of material were purchased and used to make 1,000 Zippies. The material cost a total of $6,630.

  30. Zippy Quick Check  What is the actual price per poundpaid for the material? a. $4.00 per pound. b. $4.10 per pound. c. $3.90 per pound. d. $6.63 per pound.

  31. Zippy Quick Check  Hanson’s material price variance (MPV)for the week was: a. $170 unfavorable. b. $170 favorable. c. $800 unfavorable. d. $800 favorable.

  32. Zippy Quick Check  The standard quantity of material thatshould have been used to produce1,000 Zippies is: a. 1,700 pounds. b. 1,500 pounds. c. 2,550 pounds. d. 2,000 pounds.

  33. Zippy Quick Check  Hanson’s material quantity variance (MQV)for the week was: a. $170 unfavorable. b. $170 favorable. c. $800 unfavorable. d. $800 favorable.

  34. Zippy Price variance$170 favorable Quantity variance$800 unfavorable Material Variances Summary Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price 1,700 lbs. 1,700 lbs. 1,500 lbs. × × × $3.90 per lb. $4.00 per lb. $4.00 per lb. =$6,630 = $ 6,800 = $6,000

  35. The price variance is computed on the entire quantitypurchased. • The quantity variance is computed only on the quantityused. Hanson purchased and used 1,700 pounds. How are the variances computed if the amount purchaseddiffers from the amount used? Material Variances

  36. Zippy Material Variances Continued Hanson Inc. has the following material standard to manufacture one Zippy: 1.5 pounds per Zippy at $4.00 per pound Last week 2,800 pounds of material were purchased at a total cost of $10,920, and 1,700 pounds were used to make 1,000 Zippies.

  37. Zippy Price variance increases because quantity purchased increases. Price variance$280 favorable Material Variances Continued Actual Quantity Actual Quantity Purchased Purchased × × Actual Price Standard Price 2,800 lbs. 2,800 lbs. × × $3.90 per lb. $4.00 per lb. = $10,920 = $11,200

  38. Zippy Quantity variance is unchanged because actual and standard quantities are unchanged. Quantity variance$800 unfavorable Material Variances Continued Actual Quantity Used Standard Quantity × × Standard Price Standard Price 1,700 lbs. 1,500 lbs. × × $4.00 per lb. $4.00 per lb. = $6,800 = $6,000

  39. I need the price variancesooner so that I can betteridentify purchasing problems. You accountants just don’tunderstand the problems thatpurchasing managers have. I’ll start computingthe price variancewhen material ispurchased rather thanwhen it’s used. Isolation of Material Variances

  40. You used too much material because of poorly trained workers and poorly maintained equipment. Also, your poor scheduling sometimes requires me to rush order material at a higher price, causing unfavorable price variances. I am not responsible for this unfavorable materialquantity variance. You purchased cheapmaterial, so my peoplehad to use more of it. Responsibility for Material Variances

  41. Now let’s calculate standard cost variances for direct labor. Standard Costs

  42. Note • Materials variances: • Material price variance • MPV = AQ (AP - SP) • Material quantity variance • MQV = SP (AQ - SQ) • Labor variances: • Labor rate variance • LRV = AH (AR - SR) • Labor efficiency variance • LEV = SR (AH - SH) Actual hours Actual rate Standard rate Standard hours allowed for the actual good output

  43. Zippy Labor Variances Example Hanson Inc. has the following direct labor standard to manufacture one Zippy: 1.5 standard hours per Zippy at $6.00 perdirect labor hour Last week 1,550 direct labor hours were worked at a total labor cost of $9,610 to make 1,000 Zippies.

  44. Zippy Quick Check  What was Hanson’s actual rate (AR)for labor for the week? a. $6.20 per hour. b. $6.00 per hour. c. $5.80 per hour. d. $5.60 per hour.

  45. Zippy Quick Check  Hanson’s labor rate variance (LRV) for the week was: a. $310 unfavorable. b. $310 favorable. c. $300 unfavorable. d. $300 favorable.

  46. Zippy Quick Check  The standard hours (SH) of labor thatshould have been worked to produce1,000 Zippies is: a. 1,550 hours. b. 1,500 hours. c. 1,700 hours. d. 1,800 hours.

  47. Zippy Quick Check  Hanson’s labor efficiency variance (LEV)for the week was: a. $290 unfavorable. b. $290 favorable. c. $300 unfavorable. d. $300 favorable.

  48. Zippy Rate variance$310 unfavorable Efficiency variance$300 unfavorable Labor Variances Summary Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate 1,550 hours 1,550 hours 1,500 hours × × × $6.20 per hour $6.00 per hour $6.00 per hour = $9,610 = $9,300 = $9,000

  49. Using highly paid skilled workers toperform unskilled tasks results in anunfavorable rate variance. High skill,high rate Low skill,low rate Labor Rate Variance – A Closer Look Production managers who make work assignmentsare generally responsible for rate variances.

  50. Poorlytrainedworkers Poorqualitymaterials Poorsupervisionof workers Insufficient Demand or Bottlenecks Labor Efficiency Variance –A Closer Look UnfavorableEfficiencyVariance