Objective COM11. ESSIP Plan 2014. Adriatik KOKONA DSS/EIPR 19.09.2014. Objective COM11. Comprehensive Explanation Link to European ATM Master Plan Most important SLoA (s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2013

Download Presentation

Objective COM11

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Objective com11

Objective COM11

ESSIP Plan 2014

Adriatik KOKONA

DSS/EIPR

19.09.2014


Objective com111

Objective COM11

  • Comprehensive Explanation

  • Link to European ATM Master Plan

  • Most important SLoA(s)

  • Finalisation Criteria and Closed Questions

  • Supporting Material

  • ESSIP Report 2013

  • Objective Coordinator’s Analysis, recommendations, tips & tricks

  • Conclusions

  • Links and contacts

ESSIP Plan 2014 / Objective COM11


Comprehensive explanation

Comprehensive Explanation

  • The initiative covers inter centre (encompassing all type of ATM Units) voice communication and the links with the ground radio Stations;

  • The objective forecasts that all ECAC States migrate their ATM voice services to VoIP by the specified Full Operational Capability 12/2020;

  • Initial Operational Capability (Forward fit) date is 01/2013 for both inter-centre telephony and the links to the ground radio stations on the ground segment of the Air-Ground voice.

  • Inter centres voice communications are currently mainly performed via analogue and partially digital circuits (ATS-QSIG) since 2003.

  • At present VoIP is identified as being the medium term standard for ground telephony and ground segment of the Air-Ground voice.

ESSIP Plan 2014 / Objective COM11


Link to european atm master plan

Link to European ATM Master Plan

  • Digital Voice/VoIP for ground telephony CTE-C8

ESSIP Plan 2014 / Objective COM11


Most important sloa s

Most important SLoA(s)

  • COM11-ASP03Upgrade and put into service Voice Communication Systems to support VoIP inter-centre telephony (12/2020)

  • COM11-ASP04 Upgrade and put into service Voice Communication Systems to support VoIP links to the ground radio stations (12/2020)

ESSIP Plan 2014 / Objective COM11


Finalisation criteria and closed questions

Finalisation Criteria and Closed Questions

  • Voice communications systems have been upgraded;

  • The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA);

  • Upgraded voice communication systems have been put into service

ESSIP Plan 2014 / Objective COM11


Regulation and supporting material

Regulation and Supporting Material

  • EUROCONTROL - ESARR 4 Risk Assessment and Mitigation in ATM

  • EUROCAE - ED-136 - Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) System Operational and Technical Requirements 02/2009;

  • EUROCAE - ED-137B - Interoperability Standards for VoIP ATM Components (Volume 1: Radio - Volume 2: Telephone - Volume 3: European Legacy Telephone Interworking - Volume 4: Recording - Volume 5: Supervision) 01/2012;

  • EUROCAE - ED-138 - Network Requirements and Performances for Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) Systems (Part 1: Network Specification – Part 2: Network Design Guideline) - 28.02.2009;

  • EUROCONTROL - SIP v ATS-QSIG Gateway Interworking Test Specification - Edition 2 / 12/2013;

  • EUROCONTROL - SIP v ATS-R2 Gateway Interworking Test Specification - Edition 2 / 12/2013;

  • EUROCONTROL - VOTER - Edition 2.7 / 02/2014;

  • EUROCONTROL - VoIP in ATM Cross-Reference Matrix - Edition 2 / 12/2013;

  • EUROCONTROL - VoIP in ATM Telephony Test case specification - Edition 2/ 12/2013.

ESSIP Plan 2014 / Objective COM11


Essip report 2013

ESSIP Report 2013

  • Majority of States have an implementation plan. Five States consider the objective not mature enough to start planning the implementation;

  • 35 States have reported the objective ‘Planned’, while one State has reported it as Late. Five States (DE, DK, HR, LU and NO) have reported ‘No Plan’ for the time being;

  • The progress compared with the last cycle is as follows: Two States (HR & NO) have changed the status from Planned to No Plan. MAS, MD, MT & TR have postponed the planninng for completion by one year and AM, IE & MK by two years.

ESSIP Plan 2014 / Objective COM11


Objective coordinator s analysis recommendations tips tricks

Objective Coordinator’s Analysis, recommendations, tips & tricks

  • Early implementation

    • Allows to get the benefit of the IP infrastructure, and to get early return on investment

    • Increases Airspace flexibility within functional airspace blocks in a multi-vendor operational setting.

    • Facilitates business continuity as Telecom service providers are phasing out their legacy analogue, 64kBit/s based and later 2MBit/s based services.

ESSIP Plan 2014 / Objective COM11


Conclusions

Conclusions

  • VoIP in ATM is a mature standard referenced by ICAO;

  • VoIP in ATM is ready to be deployed over the IP infrastructure (PENS and ANSPs IP networks);

  • VoIP in ATM will increase Airspace flexibility;

  • VoIP in ATM will support and facilitate business continuity.

ESSIP Plan 2014 / Objective COM11


Links and contacts

Links and contacts

  • Objective Coordinator: Adriatik Kokona, +32 2 729 3556

    [email protected]

  • DNM Objective Expert(s): L. POPESCU, +32 2 729 3757

    [email protected]

ESSIP Plan 2014 / Objective COM11


  • Login