An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ALMA Integrated Computing TeamCoordination & Planning Meeting #1Santiago, 17-19 April 2013 Telescope Calibration Planning Dominique Broguiere

  2. Presentation layout • Current status • Work in progress (Recession period) • Plans for next releases (R10.2 and R10.x) • Conclusions

  3. Overall status : TelCal Group ICT TelCal : 1.3 FTE Dominique Broguiere, lead, 0.8 FTE Jean-Christophe Roche, developer, 0.5 FTE Subsystem Scientist Baltasar Vila-Vilaro Deputy Subsystem Scientist Vincent Pietu (IRAM) Other contributions Robert Lucas holography package Scientific support Alexis Tejeda TelCal contact in JAO group : help to identify Telcal problems Installation of Telcal standalone package on reduction machines

  4. Overall status : Online calibration

  5. Overall status : Offline calibration

  6. Overall status (continuation) Other delivered features : Include CLIC and RadioPoint in TelCal standalone package 64-bit TelCal standalone libraries for reduction machines ASDM update changes New Bulk Data receiver Performance improvements in some engines (Pointing, Bandpass) and in some offline tasks (asdmplot, RadioPoint) TelCalSpy improvements Bug fixes/Tracking issues a lot of time (~ 50%) spent to analyze problems of fix issues

  7. Work in progress (Recession period) The features for R9.1.x have already been delivered. This page describes the work in progress to finish the validation of some important features as BulkData NT or to fix some issues. New bulk data system (high priority) Analyze the possible causes of TelCal slowing down the data flow and fix them Deliver 64-bit version to remove the 2GB limitation on block sizes Missing WVR data for arrays without 12m antennas (ACA) TelCal should be able to use a value of PWV provided by the TelCalParameterTuning interface or retrieve the value determinated by another array, using the TelCalPublisher interface. For offline reduction, it is necessary to add a parameter in tc_atmosphere task Bug fixes CSV-2290 (baseband inversion in ACA atmospheric calibration \) Etc…

  8. Plan for release R10.2 For this release, currently due for 05 July, a limited number of new features is planned because the priority is to consolidate existing things, to fix bugs and to keep some time to implement improvements proposed by CSV/DSO. Improvements for off-line mode Goal : make data reprocessing easier Enable appending results to the current ASDM for all calibration intents Use casa rules for the definition of list of parameters (antenna list, bbpairs list, etc…) Keep the current dataset in memory to avoid time consuming, each time a task is run on the same dataset Improvements for on-line mode Priorities to be fixed with CSV (cf TelCal-CSV meeting) Possible improvements: On-line wvr correction : use the real frequency range of WVR spectral channels

  9. Plan for releases R10.x (x>2) The schedule and the priorities of the R10.x (x>2) features are not strictly defined. They will probably be updated following priority changes or new problems raised. Improving code performances (computation time) Becomes more critical as the number of antenna increases Critical engines Pointing and WVR calibration : CONTROL is waiting for these results Several possibilities studied by Alexis (June 2011) Code optimization parallelism more efficient compilers (intel compiler) Current status Pointing and WVR engine performance still acceptable Little work done on this topic due to other priorities optimization done in some engines Parallelism (openmp) difficult to introduce due to incompatibilities with some libraries (slatec)

  10. TelCal Performance analysis Measurements issued from Telcal cpp container log (January-April 2013) Other time consuming operations in TelCal processing, outside Telcal code : metaData retrieval from DataCapturer : 0.4-1.0 s ASDM build from its IDL representation : 1.0-2.0s

  11. Plan for releases R10.x (continuation) Features dependant on Control schedule shadowing flag sideband separation subarrays (no specific development, just testing) multi-resolution mode (no specific development, just testing) Improvements in calibration algorithms Need analysis and work from astronomers Topics : on-line WVR correction long baselines high frequencies Error calculations Error calculations are missing in some results (.I.e Sideband ratio) Reduced chi square calculation gives incorrect results in Pointing engine Flag noisy basebands/ polarization in calibrations Add the ability to flag some noisy baseband(s) or polarization in calibrations Documentation : Engines and User guide

  12. ALMA Phasing Project: TelCal involvement Context Phasing algorithm will be implemented in TelCal by APP group Phasing calculation and atmospheric coefficients determination already available in TelCal code Support of following activities definition of new ASDM tables sequence diagram Phasing algorithm (using existing code of TelCal)

  13. Conclusions All the required functionalities are in principle already in TELCAL but some features still need to be tested or improved. Communication between TelCal and other groups is important CSV/DSO : priorities for new developments or bugs fixing CONTROL : synchronization of TelCal developments or tests with CONTROL deliveries (scan sequence, shadowing flag, etc…) ACS : new releases, bulkdata NT CASA : casa used in offline mode (task interface) and in online mode (solar objects ephemeris) Etc… Testing improvements TelCal Unit tests must be carefully updated and maintained Integrated tests or simulations are often not useful for TelCal because the data (0 or random values) cannot be used for real calibrations. Would it be possible to use data from existing datasets?

More Related