ESTIMATING PROJECT COST Ismu Kusumanto Jurusan Teknik Elektro UIN Sultan Syarif Kasim Riau

Loading in 2 Seconds...

play fullscreen
1 / 4

ESTIMATING PROJECT COST Ismu Kusumanto Jurusan Teknik Elektro UIN Sultan Syarif Kasim Riau - PowerPoint PPT Presentation


  • 93 Views
  • Uploaded on

ESTIMATING PROJECT COST Ismu Kusumanto Jurusan Teknik Elektro UIN Sultan Syarif Kasim Riau. TIPE COST. Direct Cost - Labor - Material - Equipment - Other 2. Project Overhead Cost 3. General & Administrative Overhead Cost (max 20 %). Allocating Costs using the WBS.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' ESTIMATING PROJECT COST Ismu Kusumanto Jurusan Teknik Elektro UIN Sultan Syarif Kasim Riau' - kennan-summers


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
estimating project cost ismu kusumanto jurusan teknik elektro uin sultan syarif kasim riau

ESTIMATING PROJECT COSTIsmu KusumantoJurusan Teknik ElektroUIN Sultan Syarif Kasim Riau

tipe cost
TIPE COST
  • Direct Cost

- Labor

- Material

- Equipment

- Other

2. Project Overhead Cost

3. General & Administrative Overhead Cost (max 20 %)

work package estimates
WORK PACKAGE ESTIMATES

WP Description : Final Version Page 1 of 1

WP ID : 1.1.3.2 Project PC Proto

Deliverable : Circuit board Date 09122008

Original Unit : Software Estimator IK

WP Duration : 3 work weeks Total Budget $ 265