State Project No. 736-99-1509 F.A.P No. SPR-001(031) Roadway Base Map Development Statewide

State Project No. 736-99-1509 F.A.P No. SPR-001(031) Roadway Base Map Development Statewide March 4, 2008. Project Manager Leslie Mix (225) 379-1919 LeslieMix@dotd.la.gov. Project Description.

kennan-sosa
Download Presentation

State Project No. 736-99-1509 F.A.P No. SPR-001(031) Roadway Base Map Development Statewide

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. State Project No. 736-99-1509 F.A.P No. SPR-001(031) Roadway Base Map Development Statewide March 4, 2008

  2. Project Manager Leslie Mix (225) 379-1919 LeslieMix@dotd.la.gov

  3. Project Description • Create an accurate, geo-referenced, and topologically correct public road feature class for state and non-state maintained.

  4. Scope of Services • Phase 1: Public road feature class creation and adjustment • Phase 2: Assignment of LRS ID to public road feature • Phase 3: Training

  5. Phase 1 – Feature Creation • Create public road polyline feature from current Topologically Integrated Geographic Encoding and Referencing (TIGER) vector data or other data approved by LADOTD • This feature will represent the centerline of undivided highways, both directions on divided highways, and ramps, wyes, frontage roads and other connectors

  6. Centerline Mileage • State maintained centerline road mileage – 16,691 miles • Non-state maintained centerline road mileage – 44,253 miles *Does not includes ramps, wyes, connectors, divided state and local roads, etc….

  7. Phase 2 – LRS ID • Text field will be added to the polyline feature as a unique identifier. • This procedure will be shown later.

  8. Phase 3 - Training • Develop a two-day on-site workshop to provide training for editing, updating and maintaining the data for the LA DOTD staff.

  9. Scheduling and Reporting • Delivery in lots per a negotiated schedule • Paid based on negotiated schedule

  10. Deliverables • Data to be delivered in ESRI ArcGIS version 9.2 or latest File Geodatabase including FGDC compliant metadata • Data to conform to National Map Accuracy Standards based on Publication FGDC-STD-007.3-1998 • Data to be made available throughout project via a secure portal and a DVD for each lot

  11. Deliverables – cont’d. • After first delivery, LADOTD and consultant will meet to discuss the tools, data models and processing methodology.

  12. Quality Requirements • Quality control plan must be submitted for LA DOTD approval before work begins.

  13. Possible Additional Services • Update / Improve address range information • Create a routing network

  14. General Information • LADOTD will entertain proposals for the use of alternative source data provided all project goals, objectives, and deliverables can be met • LADOTD will not entertain any proprietary considerations regarding such alternate source data • LRS content and any other information generated by this project will be owned by LADOTD

  15. General Information – cont’d. • The intent is to allow LADOTD to freely distribute the deliverables of this project in accordance with Louisiana Revised Statue Title 44:1 et seq.

  16. LRS ID • Presentation