502 ABW Joint Base San Antonio. Mr George DeCoux Director of Staff. Background. Installation facts 56,000 acres Operating Cost over $800M $32B Plant Replacement JBSA Economic Impact to local community - $12B Payroll $7.4B – Jobs worth $4.6B

kenaz
Download Presentation

502 ABW Joint Base San Antonio

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 502 ABW Joint Base San Antonio Mr George DeCoux Director of Staff

  2. Background • Installation facts • 56,000 acres • Operating Cost over $800M • $32B Plant Replacement • JBSA Economic Impact to local community - $12B • Payroll $7.4B – Jobs worth $4.6B • 84,000 personnel … over 135,000 students annually • Supports over 250,000 personnel

  3. JBSA Installations Camp Bullis 22 miles JBSA-Randolph 20 miles JBSA-Fort Sam Houston 14 miles JBSA-Lackland Port San Antonio Medina Annex 3

  4. Utilities and Infrastructure • JBSA Installations Use 550 megawatts of power per day • Largest CPS customer • Consumes 4.4M BTUs of natural gas per day • Processes 5.3M gallons of water per day • Utility Conservation is IMPORTANT to us! 4

  5. Utility Cost • Utility cost growing >> reaching $55M annually • A trend we need STOP

  6. Goals and Accomplishments • AF Goals • Limited Future DoD Funding • Optimize installation foot print and reduce cost • Target opportunities-set sights & hit them • Public/private energy group – Defense Transformation Institute (DTI) • City Public Service Energy Partnership • CPS liaison at each JBSA location • AFRPA/CPS – Potential Solar EUL

  7. Way Forward • Taking Action • Looking for actionable & achievable goals to reduce costs …sooner • Full Spectrum of Private/Public partnership • Accelerating Collaboration Efforts • Creative solutions needed • Joint Awareness Campaign • Our customers are your customers • Short and Long term Energy Conservation Solutions

  8. Questions?